Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “spring 2009”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Audit Report "The Department of Energy's Loan Guarantee Program for Innovative Energy Technologies"

The Energy Policy Act of 2005 authorized the Department of Energy to guarantee loans for new or significantly improved energy production technologies that avoid, reduce, or sequester air pollutants and other greenhouse gases. As of December 2008, Congress authorized the Department to make $42.5 billion in loan guarantees to support innovative energy projects. These guarantees were authorized for up to 80% of the total project costs and were designed to promote the commercial use of innovative technologies. Under the terms of the Act, the loan guarantees are contingent upon reasonable prospect of repayment by the borrower. Consistent with the Energy Policy Act, the Department is responsible for soliciting and evaluating loan applications, approving loan guarantees, and monitoring project and loan guarantee performance. through December 2008, the Department had issued five solicitations for projects that support innovative clean coal technologies, energy efficiency, renewable energy, advanced electricity transmission and distribution, and nuclear and fossil energy projects. These solicitations were issued in three phases with the first in August 2006, and the final in September 2008. Eleven substantially complete applications requesting approximately $8.2 billion in loan guarantees had been received by the Department in response to the first solicitation. The Department had begun the review of applications and was in the process of completing due diligence procedures necessary to evaluate projects received in response to the first solicitation. Under current plans, the Department is to issue its first loan guarantees in the spring of 2009. Because of the importance of this program as part of an effort to address the Nation's most challenging and pressing energy needs; and, the potential risk of loss to the United States taxpayers should default occur, we initiated this review to evaluate the Department's progress in establishing internal and operational controls over its Loan Guarantee Program.

01 COAL, LIGNITE, AND PEAT↗

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

13 HYDRO ENERGY↗

Trace Contaminant Testing with the Orion Atmosphere Revitalization Technology

Every spacecraft atmosphere contains trace contaminants resulting from offgassing by cabin materials and human passengers. An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Orion Atmosphere Revitalization System (ARS). Part of the risk mitigation effort for this new technology is the study of how atmospheric trace contaminants will affect and be affected by the technology. One particular area of concern is ammonia, which, in addition to the normal spacecraft sources, can also be offgassed by the amine-based sorbent. In the spring of 2009, tests were performed at Johnson Space Center (JSC) with typical cabin atmosphere levels of five of the most common trace gases, most of which had not yet been tested with this technology. A subscale sample of the sorbent was exposed to each of the chemicals mixed into a stream of moist, CO2-laden air, and the CO2 adsorption capacity of the sorbent was compared before and after the exposure. After these typical-concentration chemicals were proven to have negligible effect on the subscale sample, tests proceeded on a full-scale test article in a sealed chamber with a suite of eleven contaminants. To isolate the effects of various test rig components, several extended-duration tests were run: without injection or scrubbing, with injection and without scrubbing, with injection of both contaminants and metabolic CO2 and water vapor loads and scrubbing by both the test article and dedicated trace contaminant filters, and with the same injections and scrubbing by only the test article. The high-level results of both the subscale and full-scale tests are examined in this paper.

Button, Amy B.↗

Lightning Reporting at 45th Weather Squadron: Recent Improvements

The 45th Weather Squadron (45 WS) provides daily lightning reports to space launch customers at CCAFS/KSC. These reports are provided to assess the need to inspect the electronics of satellite payloads, space launch vehicles, and ground support equipment for induced current damage from nearby lightning strokes. The 45 WS has made several improvements to the lightning reports during 2008-2009. The 4DLSS, implemented in April 2008, provides all lightning strokes as opposed to just one stroke per flash as done by the previous system. The 45 WS discovered that the peak current was being truncated to the nearest kilo amp in the database used to generate the daily lightning reports, which led to an up to 4% underestimate in the peak current for average lightning. This error was corrected and led to elimination of this underestimate. The 45 WS and their mission partners developed lightning location error ellipses for 99% and 95% location accuracies tailored to each individual stroke and began providing them in the spring of 2009. The new procedure provides the distance from the point of interest to the best location of the stroke (the center of the error ellipse) and the distance to the closest edge of the ellipse. This information is now included in the lightning reports, along with the peak current of the stroke. The initial method of calculating the error ellipses could only be used during normal duty hours, i.e. not during nights, weekends, or holidays. This method was improved later to provide lightning reports in near real-time, 24/7. The calculation of the distance to the closest point on the ellipse was also significantly improved later. Other improvements were also implemented. A new method to calculate the probability of any nearby lightning stroke. being within any radius of any point of interest was developed and is being implemented. This may supersede the use of location error ellipses. The 45 WS is pursuing adding data from nine NLDN sensors into 4DLSS in real-time. This will overcome the problem of 4DLSS missing some of the strong local strokes. This will also improve the location accuracy, reduce the size and eccentricity of the location error ellipses, and reduce the probability of nearby strokes being inside the areas of interest when few of the 4DLSS sensors are used in the stroke solution. This will not reduce 4DLSS performance when most of the 4DLSS sensors are used in the stroke solution. Finally, several possible future improvements were discussed, especially for improving the peak current estimate and the error estimate for peak current, and upgrading the 4DLSS. Some possible approaches for both of these goals were discussed.

Finn, Frank C.↗

Airborne Surveys of Snow Depth over Arctic Sea Ice

During the spring of 2009, an ultrawideband microwave radar was deployed as part of Operation IceBridge to provide the first cross-basin surveys of snow thickness over Arctic sea ice. In this paper, we analyze data from three approx 2000 km transects to examine detection issues, the limitations of the current instrument, and the regional variability of the retrieved snow depth. Snow depth is the vertical distance between the air \snow and snow-ice interfaces detected in the radar echograms. Under ideal conditions, the per echogram uncertainty in snow depth retrieval is approx 4 - 5 cm. The finite range resolution of the radar (approx 5 cm) and the relative amplitude of backscatter from the two interfaces limit the direct retrieval of snow depths much below approx 8 cm. Well-defined interfaces are observed over only relatively smooth surfaces within the radar footprint of approx 6.5 m. Sampling is thus restricted to undeformed, level ice. In early April, mean snow depths are 28.5 +/- 16.6 cm and 41.0 +/- 22.2 cm over first-year and multiyear sea ice (MYI), respectively. Regionally, snow thickness is thinner and quite uniform over the large expanse of seasonal ice in the Beaufort Sea, and gets progressively thicker toward the MYI cover north of Ellesmere Island, Greenland, and the Fram Strait. Snow depth over MYI is comparable to that reported in the climatology by Warren et al. Ongoing improvements to the radar system and the utility of these snow depth measurements are discussed.

Kwok, R.↗

A Summary of NASA and USAF Hypergolic Propellant Related Spills And Fires

Hypergolic fluids are toxic liquids that react spontaneously and violently when they contact each other. These fluids are used in many different rocket and aircraft systems for propulsion and hydraulic power including, orbiting satellites, manned spacecraft, military aircraft, and deep space probes. Hypergolic fuels include hydrazine (N 2H4) and its derivatives including monomethylhydrazine (MMH), unsymmetrical di-methylhydrazine (UDMH), and Aerozine 50 (A-50), which is an equal mixture of N2H4 and UDMH. The oxidizer used with these fuels is usually nitrogen tetroxide (N2O4), also known as di-nitrogen tetroxide or NTO, and various blends of N2O4 with nitric oxide (NO). Several documented, unintentional hypergolic fluid spills and fires related to the Apollo Program, the Space Shuttle Program, and several other programs from approximately 1968 through the spring of 2009 have been studied for the primary purpose of extracting the lessons learned. Spill sites include KSC, JSC, WSTF, CCAFS, EAFB, McConnell AFB, and VAFB.

Nufer, B. M.↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preface to ISIF 2009 special issue of Journal of Applied Physics : science and technology of integrated functionalities.

The science and technology of ferroelectric thin films and their applications have attracted many researchers and experienced tremendous progress in the past 20 years. The recent worldwide increase in commercial applications of ferroelectric devices such as smart cards based on nonvolatile ferroelectric random access memories is a symbol of both the maturity and the acceptance of the technology. The 21st International Symposium on Integrated Ferroelectrics (ISIF 2009), held on September 22 to October 2, 2009 in Colorado Springs, CO, provided a forum for the academic and national laboratories research community and industry to present and share their new findings, achievements, and opinions on integrated ferroelectrics and their applications. The International Symposium on Integrated Ferroelectrics hosted the ISIF 2009. This was the first year where the ISIF held the conference in its new format under the name of International Symposium on Integrated Functionalities. The General Chairs of the ISIF in consultation with the Advisory Board and the ISIF community decided to revise the focus of the conference in order to broaden the scope to the science and technology of multifunctional materials and devices. This decision was taken in view that a new paradigm in materials, materials integration, and devices is emerging with a view to the development of a new generation of micro- and nanoscale multifunctional devices. The program included three plenary presentations on diverse topics such as 'The Role of Nonvolatile Memory in Ubiquitous Computing,' 'Ferroelectrics and High Density Memory Technology,' 'Nanoscale Ferroelectrics and Interfaces: Size Effects,' four tutorial lectures on diverse topics, such as 'Magnetic Memory Applications,' 'Ferroelectrics and Ferroelectric Devices,' 'Challenges for High-K Dielectrics on High Mobility Channels,' 'Solar Cell Materials,' one poster session, and eight oral sessions. Thanks to the great efforts made by the ISIF organization committee and the session chairs, the conference successfully achieved its objectives and the work presented reflected very well the most recent advances of integrated ferroelectrics and their applications, as well as advances in other areas related to the new theme of Integrated Functionalities. Many aspects of ferroelectric, piezoelectric, high-K dielectric, magnetic, and phase change materials, including the science and technology of these materials in thin film form, integration with other thin film materials (metals or oxide electrodes), and fabrication of micro- and nanostructures based on these heterostructure layers, and device architecture and physics, were addressed from the experimental point of view. Work on theory and computer simulations of the mentioned materials and devices were discussed also with a view to the promising applications to multifunctional devices. In addition, the ISIF 2009 featured discussions of alternative nonvolatile memory concepts and materials, such as phase change memories, research on multiferroics and magnetoelectric materials, ferroelectric photovoltaics, and new directions on the science of perovskites such as biomolecular/polarizable interfaces, and bio-ferroelectric and other oxide interfaces. Following the standard submission and peer review process of Journal of Applied Physics, the selected papers presented in ISIF 2009 in Colorado Springs are published in this special issue. We believe that the papers in this special issue represent the forefront contributions to ISIF 2009 in the various areas of fundamental and applied science of integrated ferroelectrics and functionalities and their applications. We would like to take this opportunity to thank the following organizations and companies for their support and sponsorship for ISIF 2009, namely: Aixact Systems GMBH, Radiant Technologies, Symetrix Corporation, and Taylor and Francis Publishers. We would also like to thank the conference and session chairs, advisory and organizing committee members for their hard work that resulted in a very successful ISIF 2009, now in its new future-looking modality of Integrated Functionalities.

36 MATERIALS SCIENCE↗

Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam, 2009-2010

This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam (TDA) sluiceway and turbines during fall/winter 2009 through early spring 2010. The study was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE). The goal of this study was to characterize adult steelhead spatial and temporal distributions and passage rates at the sluiceway and turbines for fisheries managers and engineers to use in decision-making relative to sluiceway operations. The study was from November 1, 2009 to April 10, 2010. The study was divided into three study periods: Period 1, November 1 - December 15, 2009 for a fall/winter sluiceway and turbine study; Period 2, December 16, 2009 - February 28, 2010 for a turbine only study; Period 3, March 1 - April 10, 2010 for a spring sluiceway and turbine study. Sluiceway operations were scheduled to begin on March 1 for this study; however, because of an oil spill cleanup near the sluice outfall, sluiceway operations were delayed until March 8, 2010, therefore the spring study period did not commence until March 8. The study objectives were to (1) estimate the number and distribution of overwintering summer steelhead fallbacks and kelt-sized acoustic targets passing into the sluiceway and turbines at TDA between November 1 and December 15, 2009 and March 1 and April 10, 2010, and (2) estimate the numbers and distribution of adult steelhead and kelt-sized targets passing into turbine units between December 16, 2009 and February 28, 2010. We obtained fish passage data using fixed-location hydroacoustics. For Period 1, overwintering summer steelhead fallback occurred throughout the 45-day study period. A total of 879 ± 165 (95% CI) steelhead targets passed through the powerhouse and sluiceway during November 1 to December 15, 2009. Ninety two percent of these fish passed through the sluiceway. Run timing peaked in early December, but fish continued to pass the dam until the end of the study. Horizontal distribution data indicated that Sluice 1 is the preferred route for these fish during fallback through the dam. Diel distribution for steelhead was variable with no apparent distinct patterns. For Period 2, adult steelhead passage occurred on January 14 and 31 and February 2, 22, and 24. A total of 62 ± 40 (95% CI) steelhead targets passed through the powerhouse intakes during December 16, 2009 to March 7, 2010. Horizontal distribution data indicated turbine unit 18 passed the majority of fish. Fish passage occurred during morning periods. Passage did not occur during afternoon or nighttime. For Period 3, the early spring study period, overwintering summer steelhead and early out-migrating steelhead kelt downstream passage occurred throughout the 34-day study period. A total of 1,985 ± 234 (95% CI) kelt-size targets were estimated to have passed through the powerhouse sluiceway. Ninety-nine percent of these fish passed through the sluiceway. Run timing peaked in late March and again in early April. Horizontal distribution indicated that Sluice 1 is the preferred route for these adult salmonids as they migrate downstream through the dam. Diel distribution for steelhead was variable with no apparent distinct patterns. The results of this study strongly suggest that operating the TDA sluiceway for steelhead passage (fallbacks and kelts) during the late fall, winter, and early spring months will provide an optimal, non-turbine route for these fishes to pass the dam.

02 PETROLEUM↗

Remediation of uranium impacted sediments in a watercourse

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work located in Windsor, Connecticut, USA. Radiological contaminants consisted primarily of high enriched uranium (HEU). Other radionuclides encountered in relatively minor amounts in certain areas of the clean-up included Co-60, Cs- 137, Ra-226, Th-232 and low enriched uranium (LEU).Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A TIGHT CONNECTION BETWEEN GAMMA-RAY OUTBURSTS AND PARSEC-SCALE JET ACTIVITY IN THE QUASAR 3C 454.3

We analyze the multi-frequency behavior of the quasar 3C 454.3 during three prominent {gamma}-ray outbursts: 2009 Autumn, 2010 Spring, and 2010 Autumn. The data reveal a repeating pattern, including a triple flare structure, in the properties of each {gamma}-ray outburst, which implies similar mechanism(s) and location for all three events. The multi-frequency behavior indicates that the lower frequency events are co-spatial with the {gamma}-ray outbursts, although the {gamma}-ray emission varies on the shortest timescales. We determine that the variability from UV to IR wavelengths during an outburst results from a single synchrotron component whose properties do not change significantly over the different outbursts. Despite a general increase in the degree of optical linear polarization during an outburst, the polarization drops significantly at the peak of the {gamma}-ray event, which suggests that both shocks and turbulent processes are involved. We detect two disturbances (knots) with superluminal apparent speeds in the parsec-scale jet associated with the outbursts in 2009 Autumn and 2010 Autumn. The kinematic properties of the knots can explain the difference in amplitudes of the {gamma}-ray events, while their millimeter-wave polarization is related to the optical polarization during the outbursts. We interpret the multi-frequency behavior within models involving either a system of standing conical shocks or magnetic reconnection events located in the parsec-scale millimeter-wave core of the jet. We argue that {gamma}-ray outbursts with variability timescales as short as {approx}3 hr can occur on parsec scales if flares take place in localized regions such as turbulent cells.

79 ASTRONOMY AND ASTROPHYSICS↗

HERO: A Hard-X-Ray Balloon-Borne Focusing Telescope

HERO, for High Energy Replicated Optics, is an evolutionary balloon payload featuring hard-X-ray grazing-incidence nickel optics. The payload provides a scientific instrument capable of high-sensitivity observations in an energy regime that is relatively unexplored at fine spatial scales, and also serves as a demonstration vehicle for in-house fabricated optics and focal plane detectors. After a proof-of-concept flight in 2001, which captured the first focused hard-X-ray images galactic sources, HERO has been significantly expanded from just 6, 3-m-focal length mirror shells to its current complement of nearly 100, 6-m-focal length mirrors. HERO was flown in 2007, from Fort Sumner, NM, and is scheduled to fly again in September 2009, from Alice Springs, NT. Full details of the payload will be provided along with preliminary data from the previous flight and science targets for the next flight, where the galactic center region will be imaged.

Ramsey, Brian↗

HERO: A Balloon-Borne Hard-X-Ray Focusing Telescope

HERO, for High Energy Replicated Optics, is an evolutionary balloon payload featuring hard-x-ray grazing-incidence nickel optics. The HERO payload is designed to perform high-sensitivity, fine spatial resolution observations of galactic and extragalactic sources in an energy range that is as yet unexplored with grazing-incidence optics. A proof-of-concept flight with just 6 x-ray mirrors was completed in 2001 and captured the first focused hard-x-ray images galactic sources. Since that time, the payload has been greatly expanded and now features 100, in-house-fabricated mirror shells with an attendant large increase in sensitivity. In its current form, HERO was flown in 2007, from Fort Sumner, NM, and is schedules to fly again in September 2009, from Alice Springs, NT. Full details of the HERO payload will be provided in this presentation together with a discussion of the challenges of flying moderate resolution x-ray optics from a balloon platform.

Ramsey, Brian↗

Preface: International Reference Ionosphere - Progress in Ionospheric Modelling

The international reference ionosphere (lRI) is the internationally recommended empirical model for the specification of ionospheric parameters supported by the Committee on Space Research (COSPAR) and the International Union of Radio Science (URSI) and recognized by the International Standardization Organization (ISO). IRI is being continually improved by a team of international experts as new data become available and better models are being developed. This issue chronicles the latest phase of model updates as reported during two IRI-related meetings. The first was a special session during the Scientific Assembly of the Committee of Space Research (COSPAR) in Montreal, Canada in July 2008 and the second was an IRI Task Force Activity at the US Air Force Academy in Colorado Springs in May 2009. This work led to several improvements and additions of the model which will be included in the next version, IRI-201O. The issue is divided into three sections focusing on the improvements made in the topside ionosphere, the F-peak, and the lower ionosphere, respectively. This issue would not have been possible without the reviewing efforts of many individuals. Each paper was reviewed by two referees. We thankfully acknowledge the contribution to this issue made by the following reviewers: Jacob Adeniyi, David Altadill, Eduardo Araujo, Feza Arikan, Dieter Bilitza, Jilijana Cander, Bela Fejer, Tamara Gulyaeva, Manuel Hermindez-Pajares, Ivan Kutiev, John MacDougal, Leo McNamara, Bruno Nava, Olivier Obrou, Elijah Oyeyemi, Vadym Paznukhov, Bodo Reinisch, John Retterer, Phil Richards, Gary Sales, J.H. Sastri, Ludger Scherliess, Iwona Stanislavska, Stamir Stankov, Shin-Yi Su, Manlian Zhang, Y ongliang Zhang, and Irina Zakharenkova. We are grateful to Peggy Ann Shea for her final review and guidance as the editor-in-chief for special issues of Advances in Space Research. We thank the authors for their timely submission and their quick response to the reviewer comments and humbly apologize for any delays in the editing process.

Bilitza Dieter↗

The International Reference Ionosphere Today and in the Future

The international reference ionosphere (IRI) is the internationally recognized and recommended standard for the specification of plasma parameters in Earth's ionosphere. It describes monthly averages of electron density, electron temperature, ion temperature, ion composition, and several additional parameters in the altitude range from 60 to 1,500 km. A joint working group of the Committee on Space Research (COSPAR) and the International Union of Radio Science (URSI) is in charge of developing and improving the IRI model. As requested by COSPAR and URSI, IRI is an empirical model being based on most of the available and reliable data sources for the ionospheric plasma. The paper describes the latest version of the model and reviews efforts towards future improvements, including the development of new global models for the F2 peak density and height, and a new approach to describe the electron density in the topside and plasmasphere. Our emphasis will be on the electron density because it is the IRI parameter most relevant to geodetic techniques and studies. Annual IRI meetings are the main venue for the discussion of IRI activities, future improvements, and additions to the model. A new special IRI task force activity is focusing on the development of a real-time IRI (RT-IRI) by combining data assimilation techniques with the IRI model. A first RT-IRI task force meeting was held in 2009 in Colorado Springs. We will review the outcome of this meeting and the plans for the future. The IRI homepage is at http://www.IRI.gsfc.nasa.gov

Bilitza, Dieter↗

Hanford Site Beryllium Program: Past, Present, and Future - 12428

The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanford Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced fossil energy utilization

This special issue of Fuel is a selection of papers presented at the symposium ‘Advanced Fossil Energy Utilization’ co-sponsored by the Fuels and Petrochemicals Division and Research and New Technology Committee in the 2009 American Institute of Chemical Engineers (AIChE) Spring National Meeting Tampa, FL, on April 26–30, 2009.

08 HYDROGEN↗