Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space telescopes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The James Webb Space Telescope

The James Webb Space Telescope is the scientific successor to the Hubble and Spitzer Space Telescopes, and is currently the largest scientific project under construction in the United States. It will be a large (6.6m) cold (50K) telescope launched in about 5 years into orbit around the second Earth-Sun Lagrange point. It is a partnership of NASA with the European and Canadian Space Agencies. Science with the James Webb Space Telescope falls into four themes. The End of the Dark Ages: First Light and Reionization theme seeks to identify the first luminous sources to form and to determine the ionization history of the universe. The Assembly of Galaxies theme seeks to determine how galaxies and the dark matter, gas, stars, metals, morphological structures, and black holes within them evolved from the epoch of reionization to the present. The Birth of Stars and Proto planetary Systems theme seeks to unravel the birth and early evolution of stars, from infall onto dust-enshrouded protostars, to the genesis of planetary systems. The Planetary Systems and the Origins of Life theme seeks to determine the physical and chemical properties of planetary systems around nearby stars and of our own, and investigate the potential for life in those systems. Webb will have four instruments: The Near-Infrared Camera, the Near-Infrared multi-object Spectrograph, and the Tunable Filter Imager will cover the wavelength range 0.6 to 5 microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 28.5 microns. I will conclude the talk with a description of recent technical progress in the construction of the observatory.

Gardner, Jonathan P.↗

The James Webb Space Telescope

The James Webb Space Telescope is the scientific successor to the Hubble and Spitzer Space Telescopes, and is currently the largest scientific project under construction in the United States. It will be a large (6.6m) cold (50K) telescope launched in about 5 years into orbit around the second Earth-Sun Lagrange point. It is a partnership of NASA with the European and Canadian Space Agencies. Science with the James Webb Space Telescope falls into four themes. The End of the Dark Ages: First Light and Reionization theme seeks to identify the first luminous sources to form and to determine the ionization history of the universe. The Assembly of Galaxies theme seeks to determine how galaxies and the dark matter, gas, stars, metals, morphological structures, and black holes within them evolved from the epoch of reionization to the present. The Birth of Stars and Protoplanetary Systems theme seeks to unravel the birth and early evolution of stars, from infall onto dust-enshrouded protostars, to the genesis of planetary systems. The Planetary Systems and the Origins of Life theme seeks to determine the physical and chemical properties of planetary systems around nearby stars and of our own, and investigate the potential for life in those systems. Webb will have four instruments: The Near-Infrared Camera, the Near-Infrared multi-object Spectrograph, and the Tunable Filter Imager will cover the wavelength range 0.6 to 5 microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 28.5 microns. I will conclude the talk with a description of recent technical progress in the construction of the observatory.

Gardner, Jonathan P.↗

Overview of the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is a cryogenic, 6.5 meter diameter space telescope. JWST has a unique architecture, compared to previous space telescopes, that is driven by its science requirements, ia passively cooled cryogenic design, and the need to stow the observatory for launch. JWST's large, segmented mirror meets the requirement for high angular resolution in the infrared coupled with a significant increase in collecting area compared to the Spitzer and Hubble Space telescopes in order to detect the first galaxies. JWST's unique five-layer sunshield allows the telescope and instrument module to passively cool to cryogenic temperatures. JWST will be launched on an Ariane 5, and so both its telescope optics, and the sunshield have to be stowed in order to fit the Ariane 5 fairing. Following launch the sunshield and telescope optics must be deployed, and the primary mirror phased for science operations. In this presentation we will review the design of the observatory and highlight recent progress in the construction of the JWST observatory. In particular, we address recent progress with the telescope optics, sunshield and spacecraft. We will discuss predicted observatory performance in terms of the scientific goals of JWST and address key operational considerations that might bear upon frontier science observations.

Clampin, Mark↗

Ariane 5 Fairing Preparations for James JWST Space Telescope

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The Ariane 5 payload faring (PLF), as shown in Figure 1, interior and Vehicle Equipment Bay membranes received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. Investigation of PLF cleanliness began early in the JWST program to test the Fairing Acoustic Protection (FAP) panels. Initial PLF cleaning was performed at RUAG in Switzerland prior to shipment to the launch site in collaboration with NASA and ESA. The cleaning procedure used at RUAG premises was based on heritage of the PLF cleaning procedure for ESA/Herschel-Planck and NASA/Mars2020 missions on an Atlas V launcher. The Ariane 5 fairing was packaged in a clean manner and inspected and cleaned upon arrival to CSG. Silicon wafers and particle fall out (PFO) plates were used to monitor the internal fairing cleanliness prior to encapsulation. Just after encapsulation, PFO plates and calcium fluoride (CaF2) crystals were placed inside the fairing on a specific tool door for monitoring the cleanliness inside the fairing during the ventilation phase. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. Fairing cleanliness was achieved and mitigated contamination distribution upon launch.

James Webb Space Telescope↗

Use of a Pathfinder Optical Telescope Element for James Webb Space Telescope Risk Mitigation

A Pathfmder of the James Webb Space Telescope (JWST) Optical Telescope Element is being developed to check out critical ground support equipment and to rehearse integration and testing procedures. This paper provides a summary of the baseline Pathfmder configuration and architecture, objectives of this effort, limitations of Pathfinder, status of its development, and future plans. Special attention is paid to risks that will be mitigated by Pathfmder.

Feinberg, Lee D.↗

Next Generation Space Telescope

The Next Generation Space Telescope (NGST), planned for launch in 2009, will be an 8-m class radiatively cooled infrared telescope at the Lagrange point L2. It will cover the wavelength range from 0.6 to 28 microns with cameras and spectrometers, to observe the first luminous objects after the Big Bang, and the formation, growth, clustering, and evolution of galaxies, stars, and protoplanetary clouds, leading to better understanding of our own Origins. It will seek evidence of the cosmic dark matter through its gravitational effects. With an aperture three times greater than the Hubble Space Telescope, it will provide extraordinary advances in capabilities and enable the discovery of many new phenomena. It is a joint project of the NASA, ESA, and CSA, and scientific operations will be provided by the Space Telescope Science Institute.

Mather, John↗

FAST: A Folded Astronomical Space Telescope

A Folded Astronomical Space Telescope (FAST) is a 2.4-m Hubble Space Telescope (HST) class of telescope that can be packaged in a 1.5-m diameter cylinder through use of a single ring of eight deployable segments. Because it has less mass and uses a much smaller booster to inject it into orbit, the cost is greatly reduced.

Hubble Space Telescope (HST) 3- to 5-meter telesco↗

Launch Window Trade Analysis for the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large-scale space telescope mission designed to study fundamental astrophysical questions ranging from the formation of the universe to the origin of planetary systems and the origins of life. JWSTs orbit design is a Libration Point Orbit (LPO) around the Sun-Earth/Moon (SEM) L2 point for a planned mission lifetime of 10.5 years. The launch readiness period for JWST is from Oct 1st, 2018 November 30th, 2018. This paper presents the first launch window analysis for the JWST observatory using finite-burn modeling; previous analysis assumed a single impulsive midcourse correction to achieve the mission orbit. The physical limitations of the JWST hardware stemming primarily from propulsion, communication and thermal requirements alongside updated mission design requirements result in significant launch window within the launch readiness period. Future plans are also discussed.

window↗

Creating the Required Deep Space Environments for Testing the James Webb Space Telescope (JWST) at NASA Johnson Space Center's Chamber A

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2021. NASA was directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper will discuss the thermal vacuum test of the Optical Telescope Element (OTE) plus Integrated Science Instrument Module (ISIM) (OTIS) as well as the extensive series of tests that were performed to incrementally validate the operations and performance of the Chamber and Ground Support Equipment (GSE). Each test required a unique thermal vacuum profile for cool down and warm up, steady state operations, GSE testing and contamination control. Select results will be presented on Facility Functional Testing, Chamber Bake-out, GSE Cryo-Proof Testing, Chamber Commissioning, the Optical Ground Support Equipment (OGSE) Test series and the final thermal vacuum test of the OTIS with respect to facility operations to meet JWST program test requirements.

Francis, Andrew↗

Parametric Cost Models for Space Telescopes

Multivariable parametric cost models for space telescopes provide several benefits to designers and space system project managers. They identify major architectural cost drivers and allow high-level design trades. They enable cost-benefit analysis for technology development investment. And, they provide a basis for estimating total project cost. A survey of historical models found that there is no definitive space telescope cost model. In fact, published models vary greatly [1]. Thus, there is a need for parametric space telescopes cost models. An effort is underway to develop single variable [2] and multi-variable [3] parametric space telescope cost models based on the latest available data and applying rigorous analytical techniques. Specific cost estimating relationships (CERs) have been developed which show that aperture diameter is the primary cost driver for large space telescopes; technology development as a function of time reduces cost at the rate of 50% per 17 years; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and increasing mass reduces cost.

Stahl, H. Philip↗

Wavefront Sensing and Control for a Next Generation Space Telescope

The Next Generation Space Telescope will provide more than ten times the collecting area of the Hubble Space Telescope in a package that fits into the shroud of an expendable launch vehicle. This paper illustrates the operation and performance expected for initial telescope alignment, segment phasing, and fine figure control for the NGST yardstick design.

wavefront↗

The Hubble Space Telescope

The Hubble Space Telescope was launched from the Kennedy Space Center on April 24, 1990. Its initial check-out indicates that all sub-systems of the satellite are working very well, with two key exceptions: The line-of-sight pointing is subject to occasional jitter apparently induced by thermal stresses in the solar arrays; this is expected to be overcome. The telescope mirrors are found to contain approximately 0.5 wave rms of spherical aberration which cannot be overcome by any controls on board the satellite. This defect will limit the scientific performance of the telescope in the short run. However, the aberration can be fully corrected in the optical designs of future replacement instruments, and the delivery schedules of these instruments are being accelerated.

Boggess, Albert↗

Selection of the Ground Segment for the Next Generation Space Telescope (NGST)

The Next Generation Space Telescope (NGST) is a large aperture space telescope designated to succeed the Hubble Space Telescope (HST). NGST will continue the recent breakthroughs of HST in our understanding of the earliest origins of stars, galaxies and the elements that are the foundations of Life. It is expected that the costs of NGST should be kept within a fraction of those for HST. The ground segment has a goal of reducing the cost of NGST in comparison to HST by 50% to 75%. To mitigate risks for NGST a flight demonstrator called Nexus is planned for 2005. Nexus is a smaller scale telescope, which plans to test the deployment and optical stability of the telescope, the "Wave Front Control" process, and the thermal performance of the sunshield. The Nexus Ground System will be developed by GSFC and STSci, and the NGST Ground System will be developed by STSci. The authors of this paper are engaged in a study to evaluate and recommend selection of a Command and Telemetry system for each of these Ground Systems. This paper focuses on the process of selecting the real-time Command and Telemetry system for NGST. We would like to use the conference as a sounding board as we make a selection.

Gal-Edd, Jonathan↗

Loads Produced During the Ingression and Egression of the Portable Foot Restraint on the Hubble Space Telescope

The Hubble Space Telescope (HST) was deployed from the Space Shuttle Discovery on April 25, 1990. It is capable of performing observations in the visible, near-ultraviolet, and near-infrared (1150 A to 1 mm). The HST weighs 12 tons, and collects light with an 8-ft-diameter mirror. The attitude control and maneuvering is performed by four of six gyroscopes, or reaction wheels. The HST contains fine guidance sensors that lock onto guide stars to reduce the spacecraft drift and increase the pointing accuracy. The HST was designed to last 15 years, with crewed service missions approximately every three years. The first service mission, STS-61, took place in 1993. The second service mission took place in 1997. In 1999, the STS-103 crew performed the third service mission to the HST. This mission's purpose was to replace the right sensor units and make improvements on the fine guidance sensors. To perform these tasks on the HST, the STS-103 crewmembers used a portable foot restraint to anchor themselves to the HST in the zero-gravity environment. The solar arrays currently used on the telescope are second-generation, and therefore susceptible to loads placed on the telescope. The crew and Mission Operations Directorate worried about the damage that the crew could possibly cause during ingress and egress of the PFR and by transferring loads to the solar arrays. The purpose of this study is to inform the crewmembers of the loads they are imparting on the HST, and train them to decrease these loads to a safer level. Minimizing these loads will significantly decrease the chance of crewmembers causing damage to the solar arrays while repairing the HST.

Ramsey, Susan↗

Science Operations with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a powerful space observatory whose four science instruments will deliver rich imaging and multiplexed spectroscopic datasets to the astronomical and planetary science communities. The ground segment for JWST, now being designed and built, will carry out JWST's science operations. The ground segment includes: (1) software that the scientific community will use to propose and specify new observations; (2) software that will schedule both science and calibration observations in a way that optimizes observing efficiency while managing the accumulation of momentum; (3) the infrastructure to regularly measure and maintain the telescope's wavefront; (4) orbit determination, ranging, and tracking; (5) communication via the Deep Space Network to command the observatory and retrieve scientific data; (6) onboard scripts that execute each observing program in an event-driven fashion, with occasional interruptions for targets of opportunity or time-critical observations; and (7) a system that processes and calibrates the data into science ready products, automatically recalibrates when calibrations improve, and archives the data for timely access by the principal investigator and later worldwide access by the scientific community. This ground system builds on experience from operating the Hubble Space Telescope, while solving challenges that are unique to the James Webb Space Telescope. In this paper, we describe the elements of the JWST ground system, how it will work operationally from the perspective of the observatory itself, and how a typical user will interact with the system to turn his/her idea into scientific discovery.

Rigby, Jane↗

Spherical Primary Optical Telescope (SPOT): An Architecture Demonstration for Cost-effective Large Space Telescopes

This paper summarizes efforts underway at the Goddard Space Flight Center to demonstrate a new type of space telescope architecture that builds on the rigid, segmented telescope heritage of the James Webb Space Telescope but that solves several key challenges for future space telescopes. The architecture is based on a cost-effective segmented spherical primary mirror combined with a unique wavefront sensing and control system that allows for continuous phasing of the primary mirror. The segmented spherical primary allows for cost-effective 3-meter class (eg, Midex and Discovery) missions as well as enables 30-meter telescope solutions that can be manufactured in a reasonable amount of time and for a reasonable amount of money. The continuous wavefront sensing and control architecture enables missions in low-earth-orbit and missions that do not require expensive stable structures and thermal control systems. For the 30-meter class applications, the paper discusses considerations for assembling and testing the telescopes in space. The paper also summarizes the scientific and technological roadmap for the architecture and also gives an overview of technology development, design studies, and testbed activities underway to demonstrate it s feasibility.

Feinberg, Lee↗

Spherical Primary Optical Telescope (SPOT): An Architecture Demonstration for Cost-effective Large Space Telescopes

This paper summarizes efforts underway at the Goddard Space Flight Center to demonstrate a new type of space telescope architecture that builds on the rigid segmented telescope heritage of the James Webb Space Telescope but that solves several key challenges for future space telescopes. The architecture is based on a cost-effective segmented spherical primary mirror combined with a unique wavefront sensing and control system that allows for continuous phasing of the primary mirror. The segmented spherical primary allows for cost-effective 3-meter class (e.g., Midex and Discovery) missions as well as enables 30-meter telescope solutions that can be manufactured in a reasonable amount of time and for a reasonable amount of money. The continuous wavefront sensing and control architecture enables missions in low-earth-orbit and missions that do not require expensive stable structures and thermal control systems. For the 30-meter class applications, the paper discusses considerations for assembling and testing the telescopes in space. The paper also summarizes the scientific and technological roadmap for the architecture and also gives an overview of technology development, design studies, and testbed activities underway to demonstrate its feasibility.

Feinberg, Lee D.↗