At least 73 records · Page 4

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Identification of the heparin binding site on adeno-associated virus serotype 3B (AAV-3B)

Adeno-associated virus is a promising vector for gene therapy. In the current study, the binding site on AAV serotype 3B for the heparan sulfate proteoglycan (HSPG) receptor has been characterized. X-ray diffraction identified a disaccharide binding site at the most positively charged region on the virus surface. The contributions of basic amino acids at this and other sites were characterized using site-directed mutagenesis. Both heparin and cell binding are correlated to positive charge at the disaccharide binding site, and transduction is significantly decreased in AAV-3B vectors mutated at this site to reduce heparin binding. While the receptor attachment sites of AAV-3B and AAV-2 are both in the general vicinity of the viral spikes, the exact amino acids that participate in electrostatic interactions are distinct. Diversity in the mechanisms of cell attachment by AAV serotypes will be an important consideration for the rational design of improved gene therapy vectors.

59 BASIC BIOLOGICAL SCIENCES↗

High-Field One-Dimensional and Two-Dimensional 27Al Magic-Angle Spinning Nuclear Magnetic Resonance Study of ?-, d-, and ?-Al2O3 Dominated Aluminum Oxides: Toward Understanding the Al Sites in ?-Al2O3

Herein, a detailed analysis was carried out using high-field (19.9 T) 27Al magic-angle spinning (MAS) nuclear magnetic resonance (NMR) on three specially prepared aluminum oxide samples where the ?-, d-, and ?-Al2O3 phases are dominantly expressed through careful control of the synthesis conditions. Specifically, two-dimensional (2D) multiquantum (MQ) MAS 27Al was used to obtain high spectral resolution, which provided a guide for analyzing quantitative 1D 27Al NMR spectra. Six aluminum sites were resolved in the 2D MQ MAS NMR spectra, and seven aluminum sites were required to fit the 1D spectra. A set of octahedral and tetrahedral peaks with well-defined quadrupolar line shapes was observed in the ?-phase dominant sample and was unambiguously assigned to the ?-Al2O3 phase. The distinct line shapes related to the ?-Al2O3 phase provided an opportunity for effectively deconvoluting the more complex spectrum obtained from the d-Al2O3 dominant sample, allowing the peaks/quadrupolar parameters related to the d-Al2O3 phase to be extracted. The results show that the d-Al2O3 phase contains three distinct AlO sites and three distinct AlT sites. This detailed Al site structural information offers a powerful way of analyzing the most complex ?-Al2O3 spectrum. It is found that the ?-Al2O3 phase consists of Al sites with local structures similar to those found in the d-Al2O3 and ?-Al2O3 phases albeit with less ordering. Spin–lattice relaxation time measurement further confirms the disordering of the lattice. Collectively, this study uniquely assigns 27Al features in transition aluminas, offering a simplified method to quantify complex mixtures of aluminum sites in transition alumina samples.

Xu, Suochang↗

Influence of weak vibrational-electronic couplings on 2D electronic spectra and inter-site coherence in weakly coupled photosynthetic complexes

Coherence oscillations measured in two-dimensional (2D) electronic spectra of pigment-protein complexes may have electronic, vibrational, or mixed-character vibronic origins, which depend on the degree of electronic-vibrational mixing. Oscillations from intrapigment vibrations can obscure the inter-site coherence lifetime of interest in elucidating the mechanisms of energy transfer in photosynthetic light-harvesting. Huang-Rhys factors (S) for low-frequency vibrations in Chlorophyll and Bacteriochlorophyll are quite small (S ≤ 0.05), so it is often assumed that these vibrations influence neither 2D spectra nor inter-site coherence dynamics. In this work, we explore the influence of S within this range on the oscillatory signatures in simulated 2D spectra of a pigment heterodimer. To visualize the inter-site coherence dynamics underlying the 2D spectra, we introduce a formalism which we call the “site-probe response.” By comparing the calculated 2D spectra with the site-probe response, we show that an on-resonance vibration with Huang-Rhys factor as small as S = 0.005 and the most strongly coupled off-resonance vibrations (S = 0.05) give rise to long-lived, purely vibrational coherences at 77 K. We moreover calculate the correlation between optical pump interactions and subsequent entanglement between sites, as measured by the concurrence. At 77 K, greater long-lived inter-site coherence and entanglement appear with increasing S. This dependence all but vanishes at physiological temperature, as environmentally induced fluctuations destroy the vibronic mixing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An active site-tail interaction in the structure of hexahistidine-tagged Thermoplasma acidophilum citrate synthase

Citrate synthase (CS) plays a central metabolic role in aerobes and many other organisms. The CS reaction comprises two half-reactions: a Claisen aldol condensation of acetyl-CoA (AcCoA) and oxaloacetate (OAA) that forms citryl-CoA (CitCoA), and CitCoA hydrolysis. Protein conformational changes that `close' the active site play an important role in the assembly of a catalytically competent condensation active site. CS from the thermoacidophile Thermoplasma acidophilum (TpCS) possesses an endogenous Trp fluorophore that can be used to monitor the condensation reaction. The 2.2 Å resolution crystal structure of TpCS fused to a C-terminal hexahistidine tag (TpCSH6) reported here is an `open' structure that, when compared with several liganded TpCS structures, helps to define a complete path for active-site closure. One active site in each dimer binds a neighboring His tag, the first nonsubstrate ligand known to occupy both the AcCoA and OAA binding sites. Solution data collectively suggest that this fortuitous interaction is stabilized by the crystalline lattice. In conclusion, as a polar but almost neutral ligand, the active site-tail interaction provides a new starting point for the design of bisubstrate-analog inhibitors of CS.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Site selection in Germany - Start of the evaluation of the site selection law - 15561

Since 2011 Germany is pursuing a phase out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high active heat producing waste from scratch. The consequence of this law is a delay of at least two decades to start operation of a final disposal site and additional costs of at least EUR 2.7 billion. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission includes representatives from the parliament, academia, civil society organizations, industry, the environmental organizations and trade unions and should forward its recommendations after a delay in starting the evaluation process now in 2016. The first author of this paper is member of the evaluation commission. The present law has to be reviewed within this time span. The site selection then might start after the next federal election in 2017 probably based on a new site selection law. This new site selection law will take into account or even follow the recommendations of the evaluation group. A new repository site should be according to the present law determined till 2031 and for this site the more detailed site investigation will take place followed by a detailed safety analysis, before the erection of the repository can start. Based on the present procedural steps it seems to be rather unlikely to determine a repository site till 2031. As shown in this publication, there will be a delay of at least 20 years compared to the schedule given in the site selection law until a repository site can be determined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program - 12184

The U.S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS and M) program: - Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. - DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. - DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators. After review of historical site documentation, DOE reports, and USACE radiological data, DOE concluded the following: - DOE had access to adequate documentation to evaluate site conditions at the former LOOW. This is important to confirm now, while institutional knowledge of early FUSRAP work remains available. - DOE remediated the completed VPs to conditions that are protective for unrestricted residential use. Sample and walkover gamma scan results indicate that no wastes remain that exceed cleanup criteria. - Process knowledge and field observations establish that Cs-137 is the predominant radionuclide in the KAPL waste stream. Cs-137, a strong gamma emitter, was used as an indicator for remediation of KAPL waste. Other radionuclides were present in much lower relative concentrations and were likely also removed during remediation of the VPs. - KAPL contaminants were removed during remedial activities at the former LOOW as either co-located or co-mingled with other radionuclides. - For the active VPs (VP-E, VP-E', and VP-G), results of DOE's cleanup of the accessible portions of these properties indicate that KAPL waste does not remain at concentrations greater than the DOE cleanup limit: - Inaccessible areas were not associated with historic KAPL waste handling. Therefore, it is unlikely that KAPL waste remains on the active VPs. - Because gamma activity was used by DOE during remediation/verification activities for excavation control, additional USACE cleanup of FUSRAP wastes on these properties will likely result in the remediation of any co-located residual KAPL wastes to acceptable levels or identification of KAPL waste that is not co-located. - Although USACE has not established a cleanup level for Cs-137 on the active NFSS VPs, DOE assessment and remediation data indicate that assessed Cs-137 was remediated and significant Cs-137 is unlikely to remain. Because of the low likelihood of encountering significant KAPL waste on the active NFSS VPs, additional remediation is not anticipated at these properties. - USACE assessment soil sampling results on the NFSS proper indicate that KAPL waste does not exceed the DOE cleanup level for Cs-137. USACE has not established a cleanup level for Cs-137 on NFSS proper. The USACE cleanup of FUSRAP wastes on the NFSS proper will likely result in the remediation of any co-located residual KAPL wastes or identification of KAPL waste that is not co-located. DOE is drafting a report of the investigation of KAPL waste at LOOW. The report will be released to the public for comment when the draft is complete. DOE responses to stakeholder inquiries resulted in a common understanding of site conditions and site risk. DOE expects additional interaction with stakeholders at the former LOOW as USACE completes remediation of the active VPs and the NFSS proper, and these relationships will hopefully have built trust between DOE and the stakeholders that DOE will perform its duties in an open and transparent manner that includes stakeholders as stewards for remediated FUSRAP sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU 105 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted after the plan is approved.

54 ENVIRONMENTAL SCIENCES↗

Site Selection in Germany - Status of the Evaluation of the Site Selection Law - 16122

Since 2011 Germany is pursuing a phase out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high active heat producing waste from scratch. The consequence of this law is a delay of at least two decades to start operation of a final disposal site and additional costs of at least EUR 2.7 billion. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission includes representatives from the parliament, academia, civil society organizations, industry, the environmental organizations and trade unions and should forward its recommendations after a delay in starting the evaluation process now in summer 2016. The present law will then be reviewed. The site selection then might start after the next federal election in 2017 at the earliest probably based on a new site selection law. A new repository site should be determined till 2031 and for this site the more detailed site investigation will take place followed by a detailed safety analysis, before the erection of the repository can start. Based on the present procedural steps it seems to be rather unlikely to determine a repository site till 2031. As shown in the publication, there will be a delay of at least 20 years compared to the schedule given in the site selection law until a repository site can be determined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of the Aquifer Impact Model to support decisions at a CO 2 sequestration site

The National Risk Assessment Partnership (NRAP) has developed a suite of tools to assess and manage risk at CO 2 sequestration sites. The NRAP tool suite includes the Aquifer Impact Model (AIM), which evaluates the potential for groundwater impacts from leaks of CO 2 and brine through abandoned wellbores. There are two aquifer reduced-order models (ROMs) included with the AIM tool, a confined alluvium aquifer, and an unconfined carbonate aquifer. The models accept aquifer parameters as a range of variable inputs so they may have broad applicability. The generic aquifer models may be used at the early stages of site selection, when site-specific data is not available. Guidelines have been developed for determining when the generic ROMs might be applicable to a new site. This work considers the application of the AIM to predicting the impact of CO 2 or brine leakage were it to occur at the Illinois Basin Decatur Project (IBDP). Results of the model sensitivity analysis can help guide characterization efforts; the hydraulic parameters and leakage source term magnitude are more sensitive than clay fraction or cation exchange capacity. Sand permeability was the only hydraulic parameter measured at the IBDP site. More information on the other hydraulic parameters could reduce uncertainty in risk estimates. Some non-adjustable parameters are significantly different for the ROM than for the observations at the IBDP site. The generic ROMs could be made more useful to a wider range of sites if the initial conditions and no-impact threshold values were adjustable parameters.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating Probability of Containment Effectiveness at a GCS Sites using integrated assessment modeling approach with Bayesian decision Networks

Improved scientific and engineering understanding of the behavior of geologic CO2 storage together with established regulatory framework and incentive structures raise the prospects for accelerated, large-scale deployment of this greenhouse gas emissions reduction approach. Incentive structures call for the establishment of appropriate verification and accounting approaches to support claims of the integrity of a geologic storage complex and to justify taking credit for long-term storage. In this study, we present a framework for assessing the probability of containment effectiveness over the lifetime of a geologic carbon storage site (e.g., after 70 years of injection and post-injection site performance) using forward stochastic model realizations based on site characterization data and using a monitoring-informed Bayesian network based on hypothetical detectability from surface seismic surveys over the site injection and post-injection phases. The National Risk Assessment Partnership’s open-source Integrated Assessment Model (NRAP-Open-IAM) was utilized to develop an ensemble of 10,000 a priori stochastic forecasts of CO2 containment. Those simulations were used to train the Bayesian network model to estimate the prior probabilities of the CO2 leakage mass into overlying, monitorable aquifers considering the uncertainties in the reservoir properties, permeability of potentially leaky wells and the overlying aquifers. The conditional probabilities in the Bayesian network were either learned from the NRAP-Open-IAM simulations or derived from the predefined detection thresholds for the monitoring method. Observations obtained from monitoring, over time during the site operation phases were then used to generate updated posterior probabilities of containment (and any loss from containment) in the Bayesian network by propagating the prior probabilities through the conditional probabilities. We demonstrate how to construct and use the Bayesian network for verifying the long-term storage complex effectiveness informed by monitoring based on the NRAP-Open-IAM simulations previously developed for the FutureGen 2.0 site. This approach may have relevance for stake holders to demonstrate secure geologic storage, provide a defensible, probabilistic approach to claim credit for geologic storage, and to estimate the likelihood that any fraction of the claimed credit may need to be refunded to the creditor based on available monitoring information.

Bayesian network, Risk assessment, Monitoring, car↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on the NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cooperative activation of cardiac transcription through myocardin bridging of paired MEF2 sites

Enhancers frequently contain multiple binding sites for the same transcription factor. These homotypic binding sites often exhibit synergy, whereby the transcriptional output from two or more binding sites is greater than the sum of the contributions of the individual binding sites alone. Although this phenomenon is frequently observed, the mechanistic basis for homotypic binding site synergy is poorly understood. Here in this paper, we identify a bona fide cardiac-specific Prkaa2 enhancer that is synergistically activated by homotypic MEF2 binding sites. We show that two MEF2 sites in the enhancer function cooperatively due to bridging of the MEF2C-bound sites by the SAP domain-containing co-activator protein myocardin, and we show that paired sites buffer the enhancer from integration site-dependent effects on transcription in vivo. Paired MEF2 sites are prevalent in cardiac enhancers, suggesting that this might be a common mechanism underlying synergy in the control of cardiac gene expression in vivo.

AMPK↗

Distinguishing Between Site Waste, Natural, and Other Sources of Contamination at Uranium and Thorium Contaminated Sites - 12274

Uranium and thorium processing and milling sites generate wastes (source, byproduct, or technically enhanced naturally occurring material), that contain contaminants that are similar to naturally occurring radioactive material deposits and other industry wastes. This can lead to mis-identification of other materials as Site wastes. A review of methods used by the US Army Corps of Engineers and the Environmental Protection Agency to distinguish Site wastes from potential other sources, enhanced materials, and natural deposits, at three different thorium mills was conducted. Real case examples demonstrate the importance of understanding the methods of distinguishing wastes. Distinguishing between Site wastes and enhanced Background material can be facilitated by establishing and applying a formal process. Significant project cost avoidance may be realized by distinguishing Site wastes from enhanced NORM. Collection of information on other potential sources of radioactive material and physical information related to the potential for other radioactive material sources should be gathered and reported in the Historical Site Assessment. At a minimum, locations of other such information should be recorded. Site decision makers should approach each Site area with the expectation that non site related radioactive material may be present and have a process in place to distinguish from Site and non Site related materials. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A preliminary sub-basin scale evaluation framework of site suitability for onshore aquifer-based CO2 storage in China

Development of a reliable, broadly applicable framework for the identification and suitability evaluation of potential CO2 storage sites is essential before large scale deployment of carbon dioxide capture and geological storage (CCS) can commence. In this study, a sub-basin scale evaluation framework was developed to assess the suitability of potential onshore deep saline aquifers for CO2 storage in China. The methodology, developed in consultation with experts from the academia and the petroleum industry in China, is based on a multi-criteria analysis (MCA) framework that considers four objectives: (1) storage optimization, in terms of storage capacity and injectivity; (2) risk minimization and storage security; (3) environmental restrictions regarding surface and subsurface use; and (4) economic considerations. The framework is designed to provide insights into both the suitability of potential aquifer storage sites as well as the priority for early deployment of CCS with existing CO2 sources. Preliminary application of the framework, conducted using GIS-based evaluation tools revealed that 18% of onshore aquifer sites with a combined CO2 storage capacity of 746 gigatons are considered to exhibit very high suitability, and 11% of onshore aquifer sites with a total capacity of 290 gigatons exhibit very high priority opportunities for implementation. These onshore aquifer sites may provide promising opportunities for early large-scale CCS deployment and contribute to CO2 mitigation in China for many decades.

CO2 storage↗