Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “site security monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A Few Thoughts on the E-Tunnel Discharge at Rainier Mesa, Nevada National Security Site

In reviewing the Quarterly Monitoring Reports assembled by Navarro for the Rainier Mesa E-Tunnel discharge for the past year (the “Navarro” data), Greg Raab of the Nevada Department of Environmental Proctection (NDEP) noticed a decreasing trend in the pH and was curious as to what was causing it. He noticed an upswing in the March 2016 data and speculated as to whether the trend would go up. Irene Farnham (Navarro) sent along the Navarro chemical and flow data from ETunnel, going back for some of the variables to 1997. Previously I was curious as to whether there was a trend in the discharge flow rates from E-Tunnel that corresponded to Greg Raab’s observations and comments about the decreasing trend in pH observed between 2015 and 2016. So, I plotted the two time series from the Navarro data over roughly the same time period that Greg looked at. There does not appear to be much of a correlation. (NB: The value of 7.1 for January 2016 differs from the value of ~6.55 in Greg’s data).

54 ENVIRONMENTAL SCIENCES↗

CY2019 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2019–December 2019), Revision 1

Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2019. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. Tritium concentrations in both of these wells, RNM-2S and UE-5n, remain above the Safe Drinking Water Act maximum contaminant level of 20,000 picocuries per liter but declined in 2019 as compared to measurements in 2018. All other contaminants of concern are below the minimum detection level plus analytical error. The water-level monitoring network includes 16 wells. Depth to water measured in 2019 is generally consistent with recent measurements for all wells. Many wells continue to exhibit a long-term downward trend in water level, though changes from 2018 to 2019 are minimal. The sharp 2016 decline in water level in Well ER-5-3-2 remains unexplained, with the lower level persisting through 2019. Rising water-level trends continue to be observed in Well ER-5-3 deep piezometer and former water supply Well WW-5A. Water supply Well WW-5B experienced a rise in water level as a result of an absence of pumping in the first part of the year (due to a mechanical problem), whereas water levels declined in WW-4 and WW-4A in response to greater pumping in 2019. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

CY2020 Annual Closure Monitoring Report for Corrective Action Unit 98: Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2020–December 2020, Revision 1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in calendar year (CY) 2020 by the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity at Corrective Action Unit (CAU) 98, Frenchman Flat (FF), at the Nevada National Security Site (NNSS), Nevada (Figure 1-1). This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates [FDs]); and verification of use restrictions (URs), institutional controls, and water use. Groundwater samples were collected; water levels were measured; and well site surveillance was conducted in support of the Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada (NNSA/NFO, 2016) and its ensuing Records of Technical Change (ROTCs).

54 ENVIRONMENTAL SCIENCES↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report and Annual Summary Report Nevada National Security Site, Nevada, Water Pollution Control Permit NEV 96021: Fourth Quarter and Calendar Year 2018

This annual report includes the results of the ETOS sample collection and analysis of the effluent water from the ETOS. The effluent sample was collected on October 9, 2018. Sampling activities were performed in accordance with the requirements of WPC Permit NEV 96021, Revision 1, which is effective October 1, 2013. Although the stated end date of the WPC permit is September 3 O, 2018, the NDEP, in a letter dated September 21, 2018, provided guidance that indicated the WPC Permit NEV 96021, Revision 1, is in effect until NOEP notifies NNSA/NFO otherwise.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site E-Tunnel Wastewater Disposal System Quarterly Monitoring Report, Water Pollution Control Permit NEV 96021 (First Quarter Calendar Year 2020)

This report includes the results of monthly inspections and monitoring for January, February, and March 2020. Monthly inspections and monitoring were conducted on January 15, February 12, and March 17, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurements of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the E-Tunnel Wastewater Disposal System discharge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗