Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “setup”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Flow Tradeoff Tool Setup Guide

The current version of the tool was designed and tested on Windows 10 and Windows 11. When upgrading from a previous version, users will be prompted to choose whether to retain the existing configuration and database if using the same installation path.

13 HYDRO ENERGY↗

Beam Tuning Setups for Drift Tube Linacs

Various matching methods for tuning Drift Tube Linacs are overviewed. Special emphasis is on the methods utilizing signature phase scans with single and pairs of Beam Position Monitors (BPM) placed inside or outside of the tuned-up cavity, and that using a combination of phase scans with energy scans.

43 PARTICLE ACCELERATORS↗

$\mathrm{O}(a)$ improvement of the flavour singlet scalar density in a setup with Wilson fermions

We report on our Ward identity determination of the O(a) improvement coefficient for the flavour singlet scalar density, namely gS , from three-flavour lattice QCD with Wilson-clover fermions and the tree-level Symanzik improved gauge action. We employ five couplings, g20∈[1.5,1.77] , that cover the range used in large-volume CLS simulations. While gS itself is for instance relevant for the O(a) improvement of meson and baryon sigma terms, a relation to bg , the O(a) improvement parameter of the gauge coupling, can also be established, allowing for its non-perturbative extraction as well. With Wilson fermions, bg is in principle required for full O(a) improvement at non-vanishing sea quark masses. We outline our procedure for extracting bg

Petrak, Pia Jones↗

Stochastic Mixing WRF Setup

Documents describing how to set up simulations using a novel stochastic mixing scheme within the Weather Research and Forecasting model.

54 ENVIRONMENTAL SCIENCES↗

Implementation of an Experimental Setup Based on the Three-Omega Method for Thermal Conductivity Measurements of Molten Salts

Molten salt reactors (MSRs) are one of the most promising next-generation nuclear reactor designs which use molten salts as the fuel and coolant. To design, model, predict, license, and operate MSRs, the behavior of the fuel and coolant must be understood as a function of temperature and irradiation, i.e., burnup. Of particular importance and complexity is the reliable and reproducible measurement of thermal conductivity of molten salts at high temperatures (> 500 °C). Thermal conductivity provides information on the rate at which heat passes through a specified material and is dependent on chemical composition. Currently, in the national laboratory complex, several methods for measuring thermal conductivity on molten salt systems are under development, however, to date, consistent data have not been produced. Typically, thermal conductivity measurements of high-temperature melts have been conducted by using the Transient Hot Wire (THW) method where thermal conductivity is determined by the change in temperature over time at a certain distance from a heating wire. Another time-dependent technique is the laser flash method, commonly used for solid samples. Laser flash requires prior measurements of density and heat capacity to calculate the thermal conductivity of the sample, introducing additional measurement errors. Steady state and time-dependent measurements such as THW and laser flash have errors from convection and ambient temperature fluctuations (heat radiation). In order to produce high fidelity thermal conductivity data, a measurement technique needs to be developed that will reduce the effect of convection at high temperatures by measuring in a very fast time window. In addition, to measure on actinide and irradiated salts the sample size should be small. Therefore, this project aims to develop a frequency-domain technique based on the three-omega (3?) method, previously proven to work on solids, nanofluids and low temperature solar salts (25 to 250 °C). If the 3?-device can be designed with materials that can withstand high temperatures (>500 °C) and can be configured to reduce errors due to convection, then it would prove to be a valuable technique for ensuring thermal conductivity on molten salt systems needed for MSR development. For this proposal, the 3? instrument will be designed, assembled, and tested on non-radioactive salts before being used on actinide bearing salts. In addition, a thermal model will be developed to determine the thermal conductivity of the sample from the measured thermal oscillation of the sensor. Because 3? is a direct method that requires a small volume of sample and works in a very fast time window, it will aid in suppressing the interference due to convection which is ideal when working with high temperature liquid samples.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Setup and Testing of PSEC5 ASIC Boards

The PSEC5 ASIC is a high-speed waveform sampling chip developed for precise measurements. This report presents the design review, test board configurations, and results from functional validation of the PSEC5 device. Key aspects examined include power integrity, voltage-controlled oscillator (VCO) behavior, SPI register functionality, clock division characteristics, readout performance, and analog biasing response. Tests were conducted across two boards under varied voltage conditions and signal configurations. Notable observations include robust VCO output, SPI communication irregularities, and anomalous readout conditions. The findings support design iterations for improved ASIC operability and firmware integration.

Fahey, Alexander [North Central Coll.]↗

MiniDAQ-3: Providing concurrent independent subdetector data-taking on CMS production DAQ resources

The data acquisition (DAQ) of the Compact Muon Solenoid (CMS) experiment at CERN, collects data for events accepted by the Level-1 Trigger from the different detector systems and assembles them in an event builder prior to making them available for further selection in the High Level Trigger, and finally storing the selected events for offline analysis. In addition to the central DAQ providing global acquisition functionality, several separate, so-called “MiniDAQ” setups allow operating independent data acquisition runs using an arbitrary subset of the CMS subdetectors. During Run 2 of the LHC, MiniDAQ setups were running their event builder and High Level Trigger applications on dedicated resources, separate from those used for the central DAQ. This cleanly separated MiniDAQ setups from the central DAQ system, but also meant limited throughput and a fixed number of possible MiniDAQ setups. In Run 3, MiniDAQ-3 setups share production resources with the new central DAQ system, allowing each setup to operate at the maximum Level-1 rate thanks to the reuse of the resources and network bandwidth. Configuration management tools had to be significantly extended to support the synchronization of the DAQ configurations needed for the various setups. We report on the new configuration management features and on the first year of operational experience with the new MiniDAQ-3 system.

Amoiridis, Vassileios↗

Drive-pressure optimization in ramp-wave compression experiments through differential evolution

Ramp-wave dynamic-compression experiments are used to examine quasi-isentropic loading paths in materials. The gradual and continuous increase in pressure created by ramp waves make these types of experiments ideal for studying nonequilibrium material behavior, such as solidification kinetics. In ramp-wave compression experiments, the input drive pressure to the experimental setup may be exerted through one of a number of different mechanisms (e.g., magnetic fields, gas-gun-driven impactors, or high-energy lasers) and is generally required for simulating such experiments. Yet, regardless of the specific mechanism, this drive pressure cannot be measured directly (measurements are generally taken at a location near the back of the experimental setup through a transparent window), leading to an inverse problem where one must determine the drive pressure at the front of the experimental setup (i.e., the input) that corresponds to the particle velocity (the output) measured near the back of the experimental setup. Furthermore, we solve this inverse problem using a heuristic optimization algorithm, known as differential evolution, coupled with a multiphysics, hydrodynamics code that simulates the compression of the experimental setup. By running many rounds of forward simulations of the experimental setup, our optimization process iteratively searches for a drive pressure that is optimized to closely reproduce the experimentally measured particle velocity near the back of the experimental setup. While our optimization methodology requires a significant number of hydrodynamics simulations to be conducted, many of these can be performed in parallel, which greatly reduces the time cost of our methodology. One novel aspect of our method for determining the drive pressure is that it does not require physical modeling of the drive mechanism and can thus be broadly applied to many types of ramp-compression experiments, regardless of the drive mechanism.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

The 2024 Run in the Injectors

The injectors provided polarized protons to RHIC for most of Run 24. That was followed by 3 weeks of Gold at 9.8 GeV/n using Tandem. Physics with PP was first declared on May 1 st and the PP portion of the run ended on Sept. 30 th . The standard BU4/AU4 setup was used for most of it. Although, from Sept. 7 th to 30 th the AGS skew quad setup (BU4/AU6) was used instead. More work was done on the Split/Merge setup (BU3/AU3) initially developed in Run 22. A two Linac pulse setup was also developed this run (BU4/AU2). As far as PP work in the injectors goes this note will focus on the standard, Split/Merge, and Two Linac pulse setups. The 9.8 GeV/n Tandem Au setup was essentially the same as in Run 23. The injector setup for Helium-3 from EBIS (BU7/AU7), which was used for an APEX study in RHIC on August 7 th , will be covered as well.

43 PARTICLE ACCELERATORS↗