A Generation-Storage Coordination Dispatch Strategy for Power System Based on Causal Reinforcement Learning

In the backdrop of global energy transformation, power systems integrating high proportions of renewable energy sources are facing unprecedented challenges in operational stability and dispatch efficiency. To address these challenges, this study introduces a generation-storage coordination real-time dispatch strategy based on Causal Power System Dynamic Reinforcement Learning (CPSDRL). Diverging from traditional reinforcement learning approaches, CPSDRL innovatively incorporates causal inference within the state prediction model - the crux of model-based reinforcement learning - thereby establishing the Power Causal Dynamic Model (PCDM). Assisted by the prior knowledge of power systems, the model significantly enhances prediction accuracy and reliability through a two-stage training process. Utilizing PCDM, this study further applies a direct policy search algorithm to optimize the real-time dispatch strategy. Experimental results indicate that the proposed method improves the stability of generation-storage coordination real-time dispatch and exhibits competitive advantages in sample efficiency and computational speed, compared to traditional model-based and model-free reinforcement learning algorithms. This method is expected to enhance the practicality and adaptability of causal reinforcement learning techniques in power system scheduling and control.

causal reinforcement learning↗

Synchronized Phasor Measurement Unit-based Central Controller for Normal and Contingent Operation of a High-Capacity HVDC Macrogrid for the Continental US

This paper presents a Synchronized Phasor Measurement Unit (PMU) based controller to support the coordination and operation of a high-capacity high-voltage direct current (HVDC) macrogrid transmission for the continental US. The proposed controller allows for optimal scheduling of each segment of the multi-terminal HVDC network under normal and contingent conditions, while considering minimum levels of frequency response requirements. The performance of the proposed controller is tested on a 100,222-bus representation of the US Eastern and Western interconnections. Results show that a centralized PMU-based controller improves the frequency nadir of the HVDC macrogrid under contingency conditions by 25.9%. Furthermore, the primary frequency response (PFR) of the HVDC macrogrid is increased by 33.4%. The performance of each interconnection under the largest credible contingency conditions is also discussed.

Mohan, Nihal↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Sparse Tensor Benchmark Suite for CPUs and GPUs

Tensor computations present significant performance chal- lenges that impact a wide spectrum of applications ranging from machine learning, healthcare analytics, social network analysis, data mining to quantum chemistry and signal processing. Efforts to improve the perfor- mance of tensor computations include exploring data layout, execution scheduling, and parallelism in common tensor kernels. This work presents a benchmark suite for arbitrary-order sparse tensor kernels using state- of-the-art tensor formats: coordinate (COO) and hierarchical coordinate (HiCOO) on CPUs and GPUs. It presents a set of reference tensor kernel implementations that are compatible with real-world tensors and power law tensors extended from synthetic graph generation techniques. We also propose Roofline performance models for these kernels to provide insights of computer platforms from sparse tensor view. This benchmark suite along with the synthetic tensor generator is publicly available.

Li, Jiajia↗

Framework for Extensible, Asynchronous Task Scheduling (FEATS) in Fortran

Most parallel scientific programs contain compiler directives (pragmas) such as those from OpenMP, explicit calls to runtime library procedures such as those implementing the Message Passing Interface (MPI), or compiler-specific language extensions such as those provided by CUDA. By contrast, the recent Fortran standards empower developers to express parallel algorithms without directly referencing lower-level parallel programming models. Fortran’s parallel features place the language within the Partitioned Global Address Space (PGAS) class of programming models. When writing programs that exploit data-parallelism, application developers often find it straightforward to develop custom parallel algorithms. Problems involving complex, heterogeneous, staged calculations, however, pose much greater challenges. Such applications require careful coordination of tasks in a manner that respects dependencies prescribed by a directed acyclic graph. When rolling one’s own solution proves difficult, extending a customizable framework becomes attractive. The paper presents the design, implementation, and use of the Framework for Extensible Asynchronous Task Scheduling (FEATS), which we believe to be the first task-scheduling tool written in modern Fortran. We describe the benefits and compromises associated with choosing Fortran as the implementation language, and we propose ways in which future Fortran standards can best support the use case in this paper.

Richardson, Brad↗

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

AQDrop Quantum Service (AQDrop) v1.0

AQDrop is a job management system designed to streamline access to the Advanced Quantum Testbed (AQT) at NERSC (National Energy Research Scientific Computing Center). It serves as a centralized middleware layer between researchers and quantum processing hardware. Key Features: AQDrop provides a FastAPI-based server backed by PostgreSQL for job submission, queue management, and role-based access control (members, operators, and administrators). Users submit Qiskit circuits via JSON payloads, which are queued, dispatched to the QPU through the Qubic API, and returned as measurement counts. A Python client library and web dashboard round out the interface options. Primary Use: Researchers submit quantum circuit jobs from a laptop or login node; an operator client executes those jobs on the AQT's physical QPU and returns results — all coordinated through the central API. Advantages: Compared to ad-hoc or direct hardware access, AQDrop adds structured queue management, auditable job-status tracking and OAuth2 authentication — reducing scheduling conflicts and unauthorized access. Its containerized deployment also improves reproducibility and scalability. Overall, AQDrop functions as a purpose-built quantum job broker tailored to NERSC's specific hardware and institutional access requirements.

Caplinger, Evan [Lawrence Berkeley National Labora↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Aggregated EV Flexibility With TSO-DSO Coordination

Electric vehicles (EVs) are becoming a promising source of grid ancillary services due to the temporal and spatial charging flexibility, quick response and storage capability. Such advantages are increasing with government policy promotion and technology improvement. However, the exploration of EV flexibility requires the coordination of both transmission system operators (TSOs) and distribution system operators (DSOs), to ensure the safe and reliable operation of power network. In this paper, we propose a coordinated evaluation method that determines the optimal utilization of EV temporal flexibility without compromising EV owners’ usage. At the distribution level, DSOs first evaluate EV aggregators’ operational boundaries to exploit distribution level services. At the transmission level, TSOs then determine EV charging schedules and ancillary service capacity simultaneously, taking into account the requirement from DSOs. Here, we validate the model in a case study using the IEEE 123 node test feeder and EV charging sessions obtained from a transportation simulation tool that uses real-world data.

33 ADVANCED PROPULSION SYSTEMS↗

A simulation‐based integrated virtual testbed for dynamic optimization in smart manufacturing systems

Abstract In a manufacturing system, production control‐related decision‐making activities occur at different levels. At the process level, one of the main control activities is to tune the parameters of individual manufacturing equipment. At the system level, the main activity is to coordinate production resources and to route parts to appropriate workstations based on their processing requirement, priority indices, and control policy. At the factory level, the goal is to plan and schedule the processing of parts at different operations for the entire system in order to optimize certain objectives. Note that the results of such activities at different levels are closely coupled and affect the overall performance of the manufacturing system as a whole. Therefore, it is important to systematically integrate these control and optimization activities into one unified platform to ensure the goal of each individual activity is aligned with the overall performance of the system. In this paper, we develop a simulation‐based virtual testbed that implements dynamic optimization, automatic information exchange, and decision‐making from the process‐level, system‐level, and factory‐level of a manufacturing system into an integrated computation environment. This is demonstrated by connecting a Python‐based numerical computation program, discrete‐event simulation software (Simul8), and an optimization solver (CPLEX) via a third‐party master program. The application of this simulation‐based virtual testbed is illustrated by a case study in a machining shop.

Sun, Yuting↗

Multistage robust optimization for the day-ahead scheduling of hybrid thermal-hydro-wind-solar systems

The integration of large-scale uncertain and uncontrollable wind and solar power generation has brought new challenges to the operations of modern power systems. In a power system with abundant water resources, hydroelectric generation with high operational flexibility is a powerful tool to promote a higher penetration of wind and solar power generation. In this paper, we study the day-ahead scheduling of a thermal-hydro-wind-solar power system. The uncertainties of renewable energy generation, including uncertain natural water inflow and wind/solar power output, are taken into consideration. We explore how the operational flexibility of hydroelectric generation and the coordination of thermal-hydro power can be utilized to hedge against uncertain wind/solar power under a multistage robust optimization (MRO) framework. To address the computational issue, mixed decision rules are employed to reformulate the original MRO model with a multi-level structure into a bi-level one. Column-and-constraint generation (C &CG) algorithm is extended into the MRO case to solve the bi-level model. The proposed optimization approach is tested in three real-world cases. Furthermore, the computational results demonstrate the capability of hydroelectric generation to promote the accommodation of uncertain wind and solar power.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DSO+T: Integrated System Simulation (DSO+T Study: Volume 2)

This report summarizes an integrated co-simulation model used by the Distribution System Operator with Transactive (DSO+T) study to represent an electrical generation, delivery, and end-load systems for the purposes of assessing the viability and value proposition of transactive energy coordination of flexible assets versus a business-as-usual case. The integrated co-simulation model includes the bulk generation and transmission system, including the day-ahead and real-time scheduling and dispatch of thermal generators. Forty distribution system operators were modelled in detail, including tens of thousands of residential and commercial buildings and their flexible end-loads. These included HVAC systems, residential water heaters, electric vehicles, and stationary, behind-the-meter, batteries. Both wholesale market and end-load results for the business-as-usual case are presented and compared to actual ERCOT system data to assess the accuracy and representativeness of the resulting model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Scheduling and Performance of Asynchronous Tasks in Fortran 2018 with FEATS

Most parallel scientific programs contain compiler directives (pragmas) such as those from OpenMP (Hermanns in Parallel programming in Fortran 95 using openMP, 2002. School of Aeronautical Engineering, Universidad Politécnica de Madrid, España, 2011), explicit calls to runtime library procedures such as those implementing the Message Passing Interface (MPI) (in A message-passing interface standard version 4.0, 2021. https://www.mpi-forum.org/docs/mpi-4.0/mpi40-report.pdf), or compiler-specific language extensions such as those provided by CUDA (Ruetsch and Fatica in CUDA Fortran for scientists and engineers: best practices for efficient CUDA Fortran programming, Elsevier, 2013). By contrast, the recent Fortran standards empower developers to express parallel algorithms without directly referencing lower-level parallel programming models (Numrich in Parallel programming with co-arrays, CRC Press, 2018, and Curcic in Modern Fortran: building efficient parallel applications, Manning Publications, 2020). Fortran’s parallel features place the language within the Partitioned Global Address Space (PGAS) class of programming models. When writing programs that exploit data parallelism, application developers often find it straightforward to develop custom parallel algorithms. Problems involving complex, heterogeneous, staged calculations, however, pose much greater challenges. Such applications require careful coordination of tasks in a manner that respects dependencies prescribed by a directed acyclic graph. When rolling one’s own solution proves difficult, extending a customizable framework becomes attractive. Further, the paper presents the design, implementation, and use of the Framework for Extensible Asynchronous Task Scheduling (FEATS), which we believe to be the first task scheduling tool written in modern Fortran. We describe the benefits and compromises associated with choosing Fortran as the implementation language, and we propose ways in which future Fortran standards can best support the use case in this paper.

97 MATHEMATICS AND COMPUTING↗

Deep Reinforcement Learning From Demonstrations to Assist Service Restoration in Islanded Microgrids

Microgrids can be operated in island mode during utility grid outages to support service restoration and improve system resilience. To schedule and dispatch distributed energy resources (DERs) in an islanded microgrid, conventional model-based methods rely on accurate distribution network models and lack generalization and adaptability. Data-driven methods are promising for DER coordination but face practical challenges such as potential hazards to microgrids during online training and insufficient online training opportunities due to low outage rates. This paper presents a novel two-stage learning framework that builds on the deep deterministic policy gradient from demonstrations to identify an optimal restoration strategy. At the pre-training stage, imitation learning is applied to equip the control agent with expert experiences to guarantee acceptable initial performance. At the online training stage, action clipping, reward shaping, and expert demonstrations are leveraged to ensure safe exploration while accelerating the training process. In conclusion, the proposed method is illustrated using the IEEE 123-node system and compared with a representative model-based method and the standard deep deterministic policy gradient method to prove solution accuracy and demonstrate increased computational efficiency.

Du, Yan↗

CRADA Number NFE-19-07846 with Grid Fruit, LLC (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-19-07846 between Oak Ridge National Laboratory (ORNL) and Grid Fruit, LLC (Grid Fruit) focused on simulating, monitoring, and adjusting controls of commercial refrigerator and freezer systems to provide load flexibility and demand response services from these machines. Viewing these medium and low-temp coolers as thermal masses, the volumes of chilled air in these coolers make them time-shiftable loads ripe for deployment at optimal times. Grid Fruit is a startup company developing methods to schedule the chilling cycles (e.g., in “build load” and “shed load” grid events) to provide energy efficiency, peak shifting, and other benefits both to the grid and the broader environment. These benefits can be magnified by coordinating chillers with HVAC, lights, computers, and other loads. Grid Fruit completed simulations and then selected and ordered controls hardware to prove the technology were successful, but the diversity of chiller models in the field without digital controls, as well as limited market demand at present, make further exploration necessary before commercialization.

42 ENGINEERING↗

Analysis and Grading of the Test Performance of PS Modules for the CMS Phase-2 Outer Tracker Upgrade

The Outer Tracker of the CMS experiment provides information about the trajectory of charged particles produced in proton-proton collisions at the LHC. During the High Luminosity LHC upgrade, scheduled for the late 2020s, the Outer Tracker will be replaced with new modules capable of transmitting data to the L1 Trigger. These modules are being assembled at several facilities around the world, including Fermilab, necessitating coordinated standards of module quality. Here I discuss the development of POTATO (Phase-2 Outer Tracker Analyzer of Test Outputs), a C++ software which provides a standardized procedure for analyzing and grading test results of the Outer Tracker modules. The particular focus of this poster is on the analysis and grading of the PS (pixel-strip) modules in POTATO.

Riggall, Caroline↗

Analysis and Grading of the Test Performance of PS Modules for the CMS Phase-II Outer Tracker Upgrade

The Outer Tracker detector of the Compact Muon Solenoid (CMS) experiment provides information about the trajectory of charged particles produced in proton-proton collisions at the Large Hadron Collider (LHC). During the High Luminosity LHC upgrade, scheduled for the late 2020s, the Outer Tracker will be replaced with new modules capable of transmitting data to the L1 Trigger. These modules are being assembled at several facilities around the world, including Fermilab, necessitating coordinated standards of module quality. Here I discuss the development of POTATO (Phase-II Outer Tracker Analyzer of Test Outputs), a C++ software which provides a standardized procedure for analyzing and grading test results of the Outer Tracker modules. The particular focus of this paper is on the analysis and grading of the PS (pixel-strip) modules in POTATO.

43 PARTICLE ACCELERATORS↗