Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “safety testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

SAS4A/SASSYS-1 Validation with FFTF Tests

The FFTF liquid sodium cooled test reactor was built to assist the development and testing of advanced fuels and material for fast reactors. The goals of the FFTF Passive Safety Testing program included confirming the safety margins of FFTF as a liquid metal reactor, providing data for computer code validation, and demonstrating the inherent and passive safety benefits of its specific design features. The program included thirteen unprotected loss of flow without scram tests. In preparation for the Passive Safety Testing program, a series of individual reactivity feedback tests were performed which were designed to simulate and validate specific features and reactivity feedbacks of the FFTF core.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SP-100 design, safety, and testing

The SP-100 Program is developing a nuclear reactor power system that can enhance and/or enable future civilian and military space missions. The program is directed to develop space reactor technology to provide electrical power in the range of tens to hundreds of kilowatts. The major nuclear assembly test is to be conducted at the Hanford Site near Richland, Washington, and is designed to validate the performance of the 2.4-MWt nuclear and heat transport assembly.

Cox, Carl. M.↗

Managing Spacecraft Risk With Space Environments Testing Via Process Safety Management At The NASA Neil A. Armstrong Test Facility

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗

Managing Spacecraft Risk with Space Environments Testing via Process Safety Management at the NASA Neil A. Armstrong Test Facility (GRC-ATF)

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗

SAS4A/SASSYS-1 Validation with the FFTF LOFWOS Tests #10-12

The FFTF liquid sodium cooled test reactor was built to assist the development and testing of advanced fuels and material for fast reactors. The goals of the FFTF Passive Safety Testing program included confirming the safety margins of FFTF as a liquid metal reactor, providing data for computer code validation, and demonstrating the inherent and passive safety benefits of its specific design features. The program included thirteen unprotected loss of flow without scram tests. The results of modeling and simulation of LOFWOS Tests #10, #11, and #12 are presented in this report to support validation of Argonne’s SAS4A/SASSYS-1 fast reactor safety analysis code. These three tests did not use the primary loop pony motors and thus transitioned to natural circulation flow rates from varying initial power levels. This validation activity leverages modeling and simulation efforts that originated under an International Atomic Energy Agency Coordinated Research Project (CRP) for benchmark analysis of the FFTF LOFWOS Test #13. The SAS4A/SASSYS-1 model originally developed for the CRP has been extended to include LOFWOS Tests #10-12 and modernized to utilize new code features and modeling practices. Predicted results from SAS4A/SASSYS-1 were compared to measured test data and differences were investigated. Overall, it was concluded that, for LOFWOS Tests #10-12, there was good agreement between the flow, power, and temperature predictions and the measured data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Impact of Testing Method on Safety Assessment of Aged Li-Ion Cells: Part II – Aged Cells Without Li Plating

Understanding the safety profile of aged Li-ion batteries is essential for developing effective battery management and hazard mitigation strategies. However, most safety assessments have focused on fresh batteries, with just a few calorimetry studies on aged batteries with metal oxide positive electrodes. This study provides a broad assessment of commercial 18650-type Li-ion batteries with NCA, NMC, and LFP positive electrodes, both uncycled and aged under conditions that promoted solid electrolyte interphase (SEI) growth as the dominant degradation mechanism. The cells underwent mechanical (nail penetration, crush), electrical (overcharge, overdischarge), and thermal (accelerating rate calorimetry) abuse tests. Safety was rated on general characteristics such as mass loss, maximum temperature, and EUCAR (European Council for Automotive R&D) hazard level, as well as characteristics specific to individual abuse tests. Generally, aged cells with SEI growth exhibited similar or improved safety compared to uncycled cells, contrasting with our previous findings on NCA cells with Li plating as the dominant aging mechanism (Part I of this series). Yet, some tests and characteristics indicated reduced aged cell safety, such as earlier triggering of mechanical failure. These results emphasize the need to examine aged battery safety across diverse empirical techniques, degradation modes, and chemistries.

Lithium-ion cells↗

Comparison of Light-Weight Radioisotope Heater Unit (LWRHU) Historical Testing to Special Form Testing Requirements

This paper compares the Light-Weight Radioisotope Heater Unit (LWRHU) historical testing to Department of Transportation (DOT) Special Form criteria per 49 CFR Part 173, Shippers-General Requirements for Shipments and Packages, Section 469, Tests for special form Class 7 (radioactive) materials as specified in DOE-STD-1027, Hazard Categorization of DOE Nuclear Facilities. Compliance with the aforementioned criteria allows for the exclusion of radioactive sources from the facility’s nuclear material inventory. As part of a new program at Los Alamos National Laboratory (LANL), LWRHUs are planned to be moved into TA-55, PF-5 Power Source Assembly Area (PSAA) for assembly and testing activities. The PSAA Facility is categorized as a low hazard, non-nuclear facility per DOE STD-1027 and is described in TA55-PF-5-FHC-11-001, Facility Hazard Categorization of the PSAA at PF-5, TA-55. The Facility Hazard Categorization document states, there must be documentation that radioactive sources are engineered to pass the special form testing specified by DOT in 49 CFR 173.469, Tests for special form Class 7 (radioactive) materials or ANSI N43.6, Sealed Radioactive Sources - Classification. This paper documents the extensive historical environmental safety testing of the LWRHU and demonstrates its ability to survive potential launch safety accident scenarios. The testing results are used herein to demonstrate through a comparative analysis that the robust design of the LWRHU meets or exceeds the special form testing specifications in 49 CFR 173.469, enabling the LWRHU to be transported and handled in PF-5 in support of testing and assembly program.

07 ISOTOPE AND RADIATION SOURCES↗

Coupled Thermal-Hydraulic and Fuel Performance Simulations of the TWIST LOCA Commissioning Test Series in TREAT

As the nuclear industry is looking to increase light water reactor (LWR) burnup limits, Idaho National Laboratory has developed an experiment vehicle for the Transient Reactor Test Facility (TREAT) to support high burnup fuel safety testing. One of the main purposes of this vehicle, known as the Transient Water Irradiation System for TREAT (TWIST), is to perform in-pile loss-of-coolant accident (LOCA) experiments on high burnup LWR fuel to investigate phenomena termed fuel fragmentation, relocation, and dispersal (FFRD). Prior to performing experiments on high burnup fuel specimens, a commissioning test series will be performed. The main purpose of the Loss-of-Coolant-Commissioning (LOC-C) test series is to qualify the TWIST device and validate the power coupling between TREAT and the TWIST fuel rod as well as validation of the thermal-hydraulic and fuel performance simulation predictions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Status of the development of rechargeable lithium cells

The progress in the development of the ambient temperature lithium - titanium disulfide rechargeable cell under development at the Jet Propulsion Laboratory is described in this paper. Originally aimed at achieving a specific energy of 100 Wh/kg, 'AA' cells have demonstrated 125 Wh/kg at the C/3 discharge rate. The results of evaluating cell design parameters are discussed and cycling test data are also included in the paper. Safety tests results at various over-charge and over discharge conditions and rates proved to be uneventful. The test results of cell with built-in overcharge mechanism proved the concept was feasible. Replacing the lithium foil electrode with a Li(x)C resulted in a capacity at 1mA/cm(exp 2) of 200 mAh/gm and 235 mAh/gm at 0.167 mA.

Halpert, G.↗

AGR-2 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE work on fuel from the second test irradiation, Advanced Gas Reactor-2 (AGR-2), began at INL in July 2014. This work scope includes Oak Ridge National Laboratory (ORNL) providing technical input, performing PIE testing and analysis, and contributing expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE fuel work from the final test irradiation (Advanced Gas Reactor [AGR]-5/6/7) is expected to commence at INL in early 2021, but the PIE preparations work began in FY2016. The work scope in this statement of work includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities; technical input to the moisture/air-ingress furnace design, fabrication, and equipment qualification; and technical support for development of equipment and techniques for planned PIE evolutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-3/4 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under accident conditions. PIE work on fuel from the third and fourth test irradiations, Advanced Gas Reactor-3/4 (AGR-3/4), began at INL in April 2015. The work scope in this memorandum purchase order (MPO) includes Oak Ridge National Laboratory (ORNL) providing technical input, preparations for PIE testing and analysis, and contributing general expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under accident conditions. PIE work on fuel from the last in the series of test irradiations, Advanced Gas Reactor (AGR)-5/6/7, will begin at Idaho National Laboratory (INL) in approximately September 2020, but because of the complexity of the experiment preparations for the PIE are going to begin in FY2016. The work scope in this memorandum purchase order (MPO) includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities, providing technical input to the moisture furnace design, providing technical support for development of equipment and techniques for planned PIE evolutions, and contributing general expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE fuel work from the final test irradiation (Advanced Gas Reactor [AGR]-5/6/7) is expected to commence at INL in early 2021, but the PIE preparations work began in FY2016. The work scope in this statement of work includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities; technical input to the moisture/air-ingress furnace design, fabrication, and equipment qualification; and technical support for development of equipment and techniques for planned PIE evolutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗