Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “safe mode”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

BioSentinel: Mission Development of a Radiation Biosensor to Gauge DNA Damage and Repair Beyond Low Earth Orbit on a 6U Nanosatellite.

We are designing and developing a "6U" (10 x 22 x 34 cm; 14 kg) nanosatellite as a secondary payload to fly aboard NASA's Space Launch System (SLS) Exploration Mission (EM) 1, scheduled for launch in late 2017. For the first time in over forty years, direct experimental data from biological studies beyond low Earth orbit (LEO) will be obtained during BioSentinel's 12- to 18- month mission. BioSentinel will measure the damage and repair of DNA in a biological organism and allow us to compare that to information from onboard physical radiation sensors. In order to understand the relative contributions of the space environment's two dominant biological perturbations, reduced gravity and ionizing radiation, results from deep space will be directly compared to data obtained in LEO (on ISS) and on Earth. These data points will be available for validation of existing biological radiation damage and repair models, and for extrapolation to humans, to assist in mitigating risks during future long-term exploration missions beyond LEO. The BioSentinel Payload occupies 4U of the spacecraft and will utilize the monocellular eukaryotic organism Saccharomyces cerevisiae (yeast) to report DNA double-strand-break (DSB) events that result from ambient space radiation. DSB repair exhibits striking conservation of repair proteins from yeast to humans. Yeast was selected because of 1) its similarity to cells in higher organisms, 2) the well-established history of strains engineered to measure DSB repair, 3) its spaceflight heritage, and 4) the wealth of available ground and flight reference data. The S. cerevisiae flight strain will include engineered genetic defects to prevent growth and division until a radiation-induced DSB activates the yeast's DNA repair mechanisms. The triggered culture growth and metabolic activity directly indicate a DSB and its successful repair. The yeast will be carried in the dry state within the 1-atm P/L container in 18 separate fluidics cards with each card having 16 independent culture microwells, with integral microchannels and filters to supply nutrients and reagents, confine the yeast to the wells, and enable optical measurement. The measurement subsystem will monitor each subgroup of culture wells continuously for several weeks, optically tracking DSBtriggered cell growth and metabolism. BioSentinel will also include physical radiation sensors based on the TimePix sensor, as implemented by JSC's RadWorks group, which record individual radiation events including estimates of their linear-energytransfer (LET) values. Radiation-dose and LET data will be compared directly to the rate of DSB-and-repair events measured by the S. cerevisiae biosentinels. The spacecraft bus will operate in a deep space environment with functions that include command and data handling, communications, power generation (via deployable solar panels) and storage, and attitude determination-and-control system with micropropulsion. Development of the BioSentinel spacecraft will mature and prove multiple nanosatellite advances in order to function well beyond LEO: Communications from distances of ≥ 500,000 km; Autonomous attitude control, momentum management, and safe mode of nanosatellites in deep space; Shielding-, hardening-, design-, and software-derived radiation tolerance for electronics; Reliable functionality for 12 - 18 months of key subsystems for biofluidics, memory, communications, power, etc.; Close integration of living biological radiation event monitors with miniature physical radiation spectrometers; Biological measurement of solar particle events beyond Earth orbit In addition to providing the first biological results from beyond LEO in over 4 decades, BioSentinel will provide an adaptable small-satellite instrument platform to perform a range of human-exploration-relevant measurements that characterize the biological consequences of multiple outer space environments. BioSentinel is being developed under NASA's Advanced Exploration Systems program.

DNA damage↗

Odyssey Mars Orbiter - Thirteen Years of On-Orbit Navigation

The Odyssey spacecraft has been in Mars orbit since October 24, 2001 and has nearly completed 61,490 orbits. Navigation operational objectives include the following: Control the local mean solar time for science observations; for most of the mission, this varied from 3:45 pm to 5:20 pm. Currently, an orbit trim maneuver planned for November 10, 2015 will place Odyssey at 6:45 pm/6:45 am at equator crossings in order to observe early morning ground frost, fog and clouds. Initially, Odyssey was late by 42 minutes for an over-flight of the critical seven minutes of Phoenix's entry, descent and landing (EDL). Odyssey was successfully positioned for this over-flight using the Delta V from angular momentum desaturations (AMD). Similar results for the Mars Science Laboratory's EDL and Comet Siding Spring's minimum risk location will be presented. Odyssey has and continues to relay significant quantities of rover data. Navigation successfully models frequent AMD Delta Vs in order to generate accurate sixty-day trajectory predictions; a typical timing error is 25 seconds after 60 days. However, unexpected events, such as safe-mode entries with their larger and more frequent thrusting, severely impact that trajectory accuracy. Impacted trajectories can have timing errors ranging from a few minutes to ten-to-fifteen minutes after sixty-days. Other analyses (briefly stated) include: a) the offset of the orbital ground track pattern after an initial cycle of 30 days or 362 orbits and b) an operations environment of continuous thrusting if/when one of the three remaining reaction wheels fails.

trajectory accuracy↗

Contingency Trajectory Design for a Lunar Orbit Insertion Maneuver Failure by the LADEE Spacecraft

A contingency trajectory analysis was performed for NASA Ames Research Center’s (ARC’s) Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft in case of a missed lunar orbit insertion (LOI) maneuver. Recovery trajectory options are shown to exist for all LADEE launch opportunities throughout a one year period. Recovery ΔV costs primarily depended on the spacecraft’s apogee location on or near the Sun-Earth weak stability boundary (WSB) and the time needed by the spacecraft to recover (e.g. to “wake up” from “safe” mode) to perform an escape prevention maneuver after the missed LOI.

Genova, A. L.↗

GOES-R Spacecraft Verification and Validation Compared with Flight Results

The Geostationary Operational Environmental Satellite, R-Series (GOES-R) represents a dramatic improvement in GEO (Geostationary Earth Orbit) weather observation capabilities over the previous generation. To provide these new capabilities, GOES-R incorporates a number of new technologies flying for the first time. As with any new spacecraft design, extensive ground testing was performed to validate the vehicle performance. In this paper, we present several successes and several lessons-learned from the GOES-R verification and validation (V&V) efforts. Included are the Dynamic Interaction Test (DIT) results for jitter assessment, and comparison to flight results. Also included are the effects of thermally-induced alignment perturbations, along with post-launch mitigations. Finally, we discuss unexpected GOES-17 gyro performance, which caused a Safe Mode entry shortly after launch. V&V mitigations are presented, which will be used for the next two GOES-R vehicles.

GOES-17↗

The Soil Moisture Acttive Passive Mission: Fault Protection Performance and Lessons Learned

Fault protection as a discipline involves a collection of flight software logic and operational processes for detecting unacceptable anomalous behavior, responding prior to reaching criticality, restricting the propagation of a failure beyond a fault containment region, and recovering the vehicle back to full or degraded functionality if possible. The System Fault Protection (SFP) design for the SMAP Earth orbiter was put to the test during its 90-day vehicle commissioning activities. During this time, the SFP software autonomously protected the vehicle from multiple faults to critical hardware, and the operations team successfully returned the observatory to its science state. The SFP also performed well in the presence of anomalous behavior below true safety limits by not taking unnecessary response actions, instead allowing the operations team time to monitor the behavior. Certain aspects of the SFP design were modified during operations via both parameter updates and a full flight software update in order to better match the vehicle behavior in the flight environment. An evaluation of the SMAP SFP performance during vehicle Commissioning will be provided in this paper, as well as a set of lessons learned largely focused on visibility, SFP mutability in operations, responses to peripheral device faults, and Safe Mode recovery and design. By capturing some of the knowledge gained during SMAP Commissioning, it is intended that this paper provide guidance for making future System Fault Protection designs more robust and supportive of operations.

Clark, Jessica↗

Inverse Solution to the Electronic Crosstalk Correction of Bands 27-30 in Terra MODIS

In the Terra MODIS Collection 6.1 (C6.1) Level-1B (L1B) product, an electronic crosstalk correction is implemented for bands 27 30 using a linear algorithm. In this algorithm, the measured (contaminated) signal from the detectors in the bands was used as a reference signal for deriving the correction coefficients from lunar images and for applying the correction to the calibration and L1B data. As the mission progressed, the level of contamination steadily increased in each detector, with an additional large increase associated with the Terra MODIS safe-mode anomaly in February of 2016. In this work, we developed a modified algorithm for deriving the crosstalk coefficients and applying the correction which uses the inverse crosstalk coefficient matrix in order to remove the contamination from the reference signal. We apply the coefficients using this modified algorithm to calibration and Earth-view data in order to assess the difference with the data in C6.1. We also perform calculations using simulated contamination to show the difference in the recovery of the corrected signal between the C6.1 algorithm and the modified algorithm. We will show, that although the current levels of contamination are much higher than early in the mission, the overall impact of having contamination on the reference signal for the correction is small. However, this impact is non-linear as a function of the magnitude of the contamination level, so it should be monitored as the mission continues.

Truman Wilson↗

MODIS TEB Calibration Algorithm Improvements for Future L1B Collection

Terra and Aqua MODIS have provided continuous global observations for scientific applications for more than 20 and 18 years, respectively. The radiometric calibration of the MODIS thermal emissive bands (TEB) is based on a quadratic approximation of the instrument response. The calibration coefficients look-up tables (LUTs) are updated using the response of the MODIS on-board blackbody (BB)with the response background subtracted by space view. The quarterly on-board BB warm-up and cool-down activity temperature ranges from 270 K to 315 K, and the derived offset has a relatively large uncertainty. Electronic cross-talk, an artifact that affects both instrument calibration and Earth view (EV) radiance retrievals, is corrected based on lunar observations. Calibration assessments using EV observations (e.g. ocean, desert, Antarctic Dome Concordia, and deep convective clouds) provide useful information to evaluate the impact of the Terra safe mode (February 2016) and Aqua MODIS formatter reset (January 2018) events on both MODIS instruments. This study focuses on the TEB radiometric calibration algorithm improvements for future collections based on calibration assessments using EV measurements and analytical modeling. Measurement stability and consistency over specific Earth scenes with a wide temperature range, as well as their brightness temperature (BT) dependency, are used for bias estimations in the calibration coefficients. Calibration coefficients are derived and updated after adjusting the current fitting algorithm. Thereafter, using the test LUTs, their impact on the Level 1B (L1B) data for different EV scenes is analyzed.

MODIS↗

Response Versus Scan-Angle Assessment of MODIS Reflective Solar Bands in Collection 6.1 Calibration

The Moderate Resolution Imaging Spectroradiometer (MODIS) instruments onboard the Aqua and Terra satellites have been operated for nearly two decades, producing high-quality earth observation data sets suitable for a broad range of scientific studies regarding the earth’s land, ocean, and atmospheric processes. The high radiometric accuracy of MODIS reflective solar band (RSB) calibration has also served as benchmark measurements for on-orbit cross-calibration studies. As the two MODIS instruments have operated well beyond their design lifespan of six years, the measurements from the onboard calibrators alone become inadequate to characterize the sensor’s response at all scan angles, as evinced by long-term drifts observed at certain scan positions of the Aqua-MODIS 0.64- and 0.86-μm bands in Collection 6 (C6) data set. The latest MODIS Level 1B C6.1 data set incorporates earth-view response trending from invariant desert sites as supplemental inputs to characterize the scan-angle calibration dependencies for all RSB. This article presents a deep convective cloud (DCC)-based calibration approach for an independent evaluation of the MODIS RSB response versus scan-angle (RVS) performance in C6.1. The long-term calibration stability and RVS differences in C6.1 have been significantly improved for Aqua-MODIS RSB. The observed RVS differences of more than 2% in Aqua-MODIS C6 bands 1 and 2 have been reduced to within 1% in C6.1. Some RSBs of Terra-MODIS have suffered temporal drifts up to ~2% and calibration shifts up to 3%, particularly around 2016 when the Terra satellite entered into safe mode. The DCC approach has been found very effective in tracking the on-orbit RVS changes over time.

Clouds and the Earth’s Radiant Energy System (CERE↗

Voyager and its Team—A Journey to The Outer Planets and Beyond

The Voyager Program and the twin Voyager 1 and Voyager 2 spacecraft are leg-endary, and the mission they continue to fly achieved significant milestones in the history of solar system exploration. NASA launched the two spacecraft in separate months in the summer of 1977. Eventually, between them, Voyager 1 and 2 would explore all four giant outer planets of our solar system, 48 of their moons, and their unique systems of rings and magnetic fields. To achieve this great success, the Voyager team had to work through a series of anomalies, start-ing with safe mode entries shortly after launch and telecommunications issues in early operations. The Voyager team pioneered deep-space exploration as they learned to solve these and many other problems in the mission’s 40-plus years.

Wolf, Aron A.↗

Using Reinforcement Learning to Design Missed Thrust Resilient Trajectories

From ion thrusters to solar sails, spacecraft continue to adopt new and more efficient forms of propulsion. As these low-thrust propulsion meth- ods have become more prevalent, new challenges have arisen. Depending on the mission, low-thrust propulsion elements may need to thrust con- tinuously for days/months. During these thrusting periods, external fac- tors, such as a micro-meteoroid impact or a software glitch, may cause the spacecraft to prematurely cease its thrust stage. Half of all deep space missions enter a safe mode where they cannot thrust every four months. These missed thrust events can result in the complete loss of a space- craft for time-dependent trajectories like planetary rendezvous. This paper demonstrates how neural networks, trained using reinforcement learning, can autonomously correct for missed thrust events during an interplanetary trajectory.

Laipert, Frank E.↗

Navigation Performance of the BioSentinel Deep Space CubeSat Mission

The BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis- 1 campaign. The BioSentinel navigation team successfully tracked and guided the spacecraft through a lunar gravity assist to its destination Earth-trailing heliocentric orbit. This 6U CubeSat carries live yeast cells to analyze the effects of radiation at large distances from Earth, becoming the first biological payload in Deep Space. Prelaunch activities included mission design updates, orbit determination rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS), the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also an uncertainty in the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact, which was evaluated for various potential launch dates. We present the results of Monte Carlo analyses and compute the pertinent maneuvers to avoid it. In addition, we present a comparison with the actual deployment once the mission launched by reconstructing our trajectory with tracking data. On November 16th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to receive 2-way Doppler and Sequential Ranging data from the DSN. We processed early data to try to obtain a first ephemeris using Initial Orbit Determination (IOD) methods such as the least squares. Soon after deployment, the spacecraft was tumbling and entered safe mode, creating a period where the tracking data were sparse. The mission team recovered the spacecraft and after four tracking passes, we solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few hundred km from the lunar surface. More tracking data over the next few days (from DSN as well as ESA antennas) allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators aborted any correction maneuvers. This periselene altitude also gave us the necessary energy to achieve a heliocentric orbit. The next challenge was due to the necessary adjustments in our orbit determination method due to the large energy boost resulting from the lunar flyby. After a series of tracking passes we were able to get a nominal solution that resulted into a stable trajectory. This paper discusses in detail the navigation performance using the X-band IRIS transponder, as well as the challenges and lessons learned prior to and during this deep space, CubeSat mission.

Andres Dono Perez↗

BioSentinel Deep Space CubeSat Mission

The BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis-1 campaign. This 6U CubeSat carries yeast cells to analyze the effects of radiation at large distances from Earth, becoming the first biological payload in Deep Space. Prelaunch activities included mission design updates, orbit determination rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS), the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also uncertainty in the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact, which was evaluated for various potential launch dates. On November 16 th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to receive tracking data from the DSN and ESA antennas. Soon after deployment, the spacecraft was tumbling and entered safe mode. The mission team recovered the spacecraft and after four tracking passes, we solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few hundred km from the lunar surface. More tracking data over the next few days allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators avoided any correction maneuvers on the trajectory and successfully tracked and guide the spacecraft. The spacecraft performed a nominal lunar flyby which provided the pertinent energy to achieve a final Earth-trailing heliocentric orbit. Over the course of two weeks, the mission operators corroborated that the subsystems were functioning as expected after the lunar eclipse and the large ΔV incurred. Science operations started once the mission achieved the nominal orbit in Deep Space. This paper discusses in detail the BioSentinel flight performance, as well as the challenges and lessons learned prior to and during this CubeSat mission.

Andres Dono Perez↗

TESS Data Release Notes: Sector 60, DR85

TESS Sector 60 observations include physical orbits 127 and 128 of the spacecraft around the Earth. Data collection was paused for a total of 0.63 days to download data. Data were downloaded approximately every seven days, once near apogee of each orbit and once near perigee. At TJD 2949.99, the spacecraft entered into safe mode, resulting in instrument turn-off until TJD 2955.04. There are no FFIs, target pixel file data, or light curve data during this time. During these times (as well as when the spacecraft is transmitting data to ground systems) the data and timestamps in target-pixel files and light curve files are set to NULL. One FFI from Camera 1 in orbit 127 was corrupted prior to downlink from the spacecraft and could not be recovered. The FFIINDEX number is 00738895 (timestamp 2022358084201), and no FFI file for Camera 1 was produced for this cadence. In total, there are 20.01 days of science data collected in Sector 60.

TESS↗

Establishment of design criteria for acceptable failure modes and fail safe considerations for the space shuttle structural system

The application of general design approaches for preventing failures due to repeated load cycles is briefly discussed. Program objective, mission requirements, and structural design criteria are summarized. Discrete structural elements and associated sections were selected for detailed strength, fatigue, and fracture mechanics investigations.

Westrup, R. W.↗

Establishment of design criteria for acceptable failure modes and fail safe considerations for the space shuttle structural system

Investigations of fatigue life, and safe-life and fail-safe design concepts as applied to space shuttle structure are summarized. The results are evaluated to select recommended structural design criteria to provide assurance that premature failure due to propagation of undetected crack-like defects will not occur during shuttle operational service. The space shuttle booster, GDC configuration B-9U, is selected as the reference vehicle. Structural elements used as basis of detail analyses include wing spar caps, vertical stabilizer skins, crew compartment skin, orbiter support frame, and propellant tank shell structure. Fatigue life analyses of structural elements are performed to define potential problem areas and establish upper limits of operating stresses. Flaw growth analyses are summarized in parametric form over a range of initial flaw types and sizes, operating stresses and service life requirements. Service life of 100 to 500 missions is considered.

Westrup, R. W.↗

Flight Test of an Intelligent Flight-Control System

The F-15 Advanced Controls Technology for Integrated Vehicles (ACTIVE) airplane (see figure) was the test bed for a flight test of an intelligent flight control system (IFCS). This IFCS utilizes a neural network to determine critical stability and control derivatives for a control law, the real-time gains of which are computed by an algorithm that solves the Riccati equation. These derivatives are also used to identify the parameters of a dynamic model of the airplane. The model is used in a model-following portion of the control law, in order to provide specific vehicle handling characteristics. The flight test of the IFCS marks the initiation of the Intelligent Flight Control System Advanced Concept Program (IFCS ACP), which is a collaboration between NASA and Boeing Phantom Works. The goals of the IFCS ACP are to (1) develop the concept of a flight-control system that uses neural-network technology to identify aircraft characteristics to provide optimal aircraft performance, (2) develop a self-training neural network to update estimates of aircraft properties in flight, and (3) demonstrate the aforementioned concepts on the F-15 ACTIVE airplane in flight. The activities of the initial IFCS ACP were divided into three Phases, each devoted to the attainment of a different objective. The objective of Phase I was to develop a pre-trained neural network to store and recall the wind-tunnel-based stability and control derivatives of the vehicle. The objective of Phase II was to develop a neural network that can learn how to adjust the stability and control derivatives to account for failures or modeling deficiencies. The objective of Phase III was to develop a flight control system that uses the neural network outputs as a basis for controlling the aircraft. The flight test of the IFCS was performed in stages. In the first stage, the Phase I version of the pre-trained neural network was flown in a passive mode. The neural network software was running using flight data inputs with the outputs provided to instrumentation only. The IFCS was not used to control the airplane. In another stage of the flight test, the Phase I pre-trained neural network was integrated into a Phase III version of the flight control system. The Phase I pretrained neural network provided realtime stability and control derivatives to a Phase III controller that was based on a stochastic optimal feedforward and feedback technique (SOFFT). This combined Phase I/III system was operated together with the research flight-control system (RFCS) of the F-15 ACTIVE during the flight test. The RFCS enables the pilot to switch quickly from the experimental- research flight mode back to the safe conventional mode. These initial IFCS ACP flight tests were completed in April 1999. The Phase I/III flight test milestone was to demonstrate, across a range of subsonic and supersonic flight conditions, that the pre-trained neural network could be used to supply real-time aerodynamic stability and control derivatives to the closed-loop optimal SOFFT flight controller. Additional objectives attained in the flight test included (1) flight qualification of a neural-network-based control system; (2) the use of a combined neural-network/closed-loop optimal flight-control system to obtain level-one handling qualities; and (3) demonstration, through variation of control gains, that different handling qualities can be achieved by setting new target parameters. In addition, data for the Phase-II (on-line-learning) neural network were collected, during the use of stacked-frequency- sweep excitation, for post-flight analysis. Initial analysis of these data showed the potential for future flight tests that will incorporate the real-time identification and on-line learning aspects of the IFCS.

Davidson, Ron↗

Simultaneous Spectral and Timing Observations of Accreting Neutron Stars

All six Rossi Timing Explorer (RXTE) observations approved for this proposal were car- ried out. Four of the observations were simultaneous with BeppoSAX (two of the source 4Ul820-30, and one each of 4U1636-536 and 4U0614+091) and two were simultaneous with ASCA (of 4Ul636-536 and of 4U0614+091). RXTE experienced a single event upset and went into a safe hold mode during the first 4U0614+091 observation and remained in safe hold until after the scheduled start of the second 4U0614+091 observation. An additional observation of 4U0614+091 was performed with RXTE to make up for the lost time. However, it was not possible to arrange for simultaneous observations with either BeppoSAX or ASCA. Our work has led to three papers directly related to observations made - one paper for each source observed - and one additional paper summarizing our progress in this field. In addition, several reports on these results were made at various conferences.

Kaaret, P.↗

Smart Power Supply for Battery-Powered Systems

A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have differing power needs, this supply also has a secondary power bus, which can be programmed a priori or on-the-fly to boost the primary battery voltage level from 24 to 50 V to accommodate various loads as they are brought on line. Through voltage and current monitoring, the device can also shield the charging source from overloads, keep it within safe operating modes, and can meter available power to the application and maintain safe operations.

Krasowski, Michael J.↗