Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “robotic construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A Real2Sim Digital Twin Pipeline for Photorealistic Robot Simulation: Evaluating VLA Policy Deployment on a Bimanual Mobile Robot

Digital twins that are automatically constructed from robot sensor data offer a promising pathway for scalable Real2Sim and Sim2Real transfer. However, it remains an open question whether photorealistic reconstruction alone is sufficient to support reliable deployment of vision-language-action (VLA) policies. We present a generative-AI-assisted Real2Sim pipeline that generates simulation-ready digital twins from real-world RGB observations with minimal manual intervention. The pipeline uses prompted segmentation to isolate scene components and a generative 3D model to directly produce simulation assets, eliminating the need for traditional multi-view reconstruction or manual 3D modeling.\r\nTo evaluate simulation fidelity, we deploy and compare policies from two VLA models in both the real robot and the reconstructed\r\nsimulation under identical tasks and initial conditions. We compare joint-level action trajectories and analyze how divergence evolves over time in closed-loop execution. Although the reconstructed environments are visually accurate, we observe increasing trajectory divergence during closedloop operation. These results indicate that photorealistic reconstruction alone is insufficient to preserve closed-loop control behavior\r\nin VLA policies, particularly in contact-rich manipulation settings where small perceptual errors compound over time.

97 MATHEMATICS AND COMPUTING↗

Cable-Driven Parallel Robot (CDPR) for Panelized Envelope Retrofits: Feasible Workspace Analysis

Recent decades have seen remarkable progress in the field of robotic-assisted construction. Cable-driven parallel robots (CDPRs) emerge as promising tools for automating construction processes, due to their advantageous features such as scalability, reconfigurability, compact design, and high payload-to-weight ratio. This paper uses a simple static model to determine the feasibility of a CDPR for overclad panel installation in building envelope retrofits. Given that the building facade needs to be a subset of the CDPR’s wrench-feasible workspace, we focus on the sensitivity of the workspace concerning various cable arrangements and CDPR frame sizes (e.g., height and width extensions). Our analysis indicates that no cable arrangement satisfies the requirement of complete facade coverage and avoids cable-to-panel collisions. Thus, frame extension is needed to enhance coverage. However, in densely populated areas where width extension is limited by space constraints, height extension alone is insufficient to guarantee full facade coverage. This paper pioneers the investigation of CDPRs for panelized envelope retrofits, showcasing their advantages and limitations and paving the way for further research and development.

Liu, Yifang↗

Robotic influence in the conceptual design of mechanical systems in space and vice versa - A survey

A survey of methods using robotic devices to construct structural elements in space is presented. Two approaches to robotic construction are considered: one in which the structural elements are designed using conventional aerospace techniques which tend to constrain the function aspects of robotics and one in which the structural elements are designed from the conceptual stage with built-in robotic features. Examples are presented of structural building concepts using robotics, including the construction of the SP-100 nuclear reactor power system, a multimirror large aperture IR space telescope concept, retrieval and repair in space, and the Flight Telerobotic Servicer.

Sanger, George F.↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction - 18493

Additive manufacturing (AM), in both polymer and metal, has advanced to the point where it can significantly facilitate robot and remote system design and implementation. Properly used AM creates features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been commercially available for quite some time and is regularly used for prototyping and test fitting parts before they are fabricated from metal or produced in low production quantity parts that do not require high structural strength. Metal printing processes are more diverse than polymer print processes. Both polymer and metal printing systems can be used to make parts or complete systems for robotics. Two implementation examples that illustrate the possibilities and identify issues that remain in metal printing are: a dual arm hydraulic manipulator and a distal link of an excavator arm. The dual arm hydraulic manipulator was printed in titanium using an e-beam fusing process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire-fed metal inert gas process. The excavator was then used for digging as part of an equipment exposition validating the structural integrity of the printed part. (authors)

3D PRINTING↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction

Additive manufacturing (AM) in both polymer and metal has advanced to the point where it can substantially facilitate robot and remote system design and implementation. While AM is not a panacea to fix bad design concepts, properly used AM can create features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been available commercially for quite some time and is regularly used to facilitate prototyping and test fitting of parts later to be fabricated in metal or to produce low production quantity parts that do not require high structural strength. However Oak Ridge National Laboratory (ORNL) has pioneered large scale polymer additive manufacturing with sufficient strength to print a car and frame, a small house, a “wet” submarine, and tooling to mold wind generator blades. While polymer processes use a variety of materials, all polymer printers basically lay down a heated extruded bead of a certain width and height. Print resolution is based on the deposition rate of the printer. The larger the deposition rate, the lower the print resolution. Large scale polymer builds often rely on post processing (machining) to provide a smooth finish to the part surface.Metal printing processes are much more diverse than polymer print processes. Electron beam (ebeam), laser, and binder jet are common methods to fuse metal powder-based systems. Metal powder spray can be done with laser or plasma. While metal powder systems produce high definition parts, part size is limited. Larger parts are currently done with wire feed systems based on laser or arc (metal inert gas (MIG) or tungsten inert gas (TIG)) processes. Part definition decreases, but part size can be on the order of tens of cubic feet and hundreds of pounds.Two implementation examples are presented in this paper to illustrate the possibilities and to identify issues that remain. A dual arm hydraulic manipulator was printed in titanium using the ebeam process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire feed metal inert gas (MIG) process. The excavator was then used for digging as part of an equipment exposition validating the metallurgy of the printed part.

Nycz, Andrzej↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction

Additive manufacturing (AM), in both polymer and metal, has advanced to the point where it can substantially facilitates robot and remote system design and implementation. While AM is not a panacea to fix bad design concepts, properly used AM can creates features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been commercially available commercially for quite some time and is regularly used to facilitatefor prototyping and test fitting of parts later to be before they are fabricated fromin metal or to produced in low production quantity parts that do not require high structural strength. Metal printing processes are more diverse than polymer print processes. Both polymer and metal printing systems can be used to make parts or complete systems for robotics. Two implementation examples thato illustrate the possibilities and to identify issues that remain in metal printing are: a dual arm hydraulic manipulator and a distal link of an excavator arm. The dual arm hydraulic manipulator was printed in titanium using an e-beam fusing process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire-fed metal inert gas process. The excavator was then used for digging as part of an equipment exposition validating the structural integrity of the printed part.

Noakes, Mark↗

A hardware investigation of robotic SPECT for functional and molecular imaging onboard radiation therapy systems

Purpose: To construct a robotic SPECT system and to demonstrate its capability to image a thorax phantom on a radiation therapy flat-top couch, as a step toward onboard functional and molecular imaging in radiation therapy. Methods: A robotic SPECT imaging system was constructed utilizing a gamma camera detector (Digirad 2020tc) and a robot (KUKA KR150 L110 robot). An imaging study was performed with a phantom (PET CT Phantom{sup TM}), which includes five spheres of 10, 13, 17, 22, and 28 mm diameters. The phantom was placed on a flat-top couch. SPECT projections were acquired either with a parallel-hole collimator or a single-pinhole collimator, both without background in the phantom and with background at 1/10th the sphere activity concentration. The imaging trajectories of parallel-hole and pinhole collimated detectors spanned 180° and 228°, respectively. The pinhole detector viewed an off-centered spherical common volume which encompassed the 28 and 22 mm spheres. The common volume for parallel-hole system was centered at the phantom which encompassed all five spheres in the phantom. The maneuverability of the robotic system was tested by navigating the detector to trace the phantom and flat-top table while avoiding collision and maintaining the closest possible proximity to the common volume. The robot base and tool coordinates were used for image reconstruction. Results: The robotic SPECT system was able to maneuver parallel-hole and pinhole collimated SPECT detectors in close proximity to the phantom, minimizing impact of the flat-top couch on detector radius of rotation. Without background, all five spheres were visible in the reconstructed parallel-hole image, while four spheres, all except the smallest one, were visible in the reconstructed pinhole image. With background, three spheres of 17, 22, and 28 mm diameters were readily observed with the parallel-hole imaging, and the targeted spheres (22 and 28 mm diameters) were readily observed in the pinhole region-of-interest imaging. Conclusions: Onboard SPECT could be achieved by a robot maneuvering a SPECT detector about patients in position for radiation therapy on a flat-top couch. The robot inherent coordinate frames could be an effective means to estimate detector pose for use in SPECT image reconstruction.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

An Autonomous Vault-Building Robot System for Creating Spanning Structures

Research in autonomous robots for construction has largely focused on ground-based robots whose reach constrains the size of what they can build, or on climbing or aerial robots that build solid or unroofed structures. Autonomous construction of larger, multistory buildings, or bridges spanning unsupported distances, would require robots that build sturdy structures supporting their own weight. In this paper, we present VaultBot, a system of autonomous robots that build a load-bearing spanning vault using identical modular blocks. The custom blocks employ mechanical and other features to facilitate robotic manipulation and locomotion, and can be removed from and replaced in an assembled structure as a way of repairing damage. We characterize the system's performance and failure modes, and demonstrate reliable autonomous assembly for a structure composed of 46 blocks. Blocks can be made collapsible and deployable as a way of reducing mass and volume that must be transported to a construction site. Such a system could be used to help enable construction of protective shelters in challenging environments, such as disaster relief scenarios, arctic settings, or extraterrestrial habitats.

Nathan Melenbrink↗

TH-C-17A-06: A Hardware Implementation and Evaluation of Robotic SPECT: Toward Molecular Imaging Onboard Radiation Therapy Machines

Purpose: To construct a robotic SPECT system and demonstrate its capability to image a thorax phantom on a radiation therapy flat-top couch. The system has potential for on-board functional and molecular imaging in radiation therapy. Methods: A robotic SPECT imaging system was developed utilizing a Digirad 2020tc detector and a KUKA KR150-L110 robot. An imaging study was performed with the PET CT Phantom, which includes 5 spheres: 10, 13, 17, 22 and 28 mm in diameter. Sphere-tobackground concentration ratio was 6:1 of Tc99m. The phantom was placed on a flat-top couch. SPECT projections were acquired with a parallel-hole collimator and a single pinhole collimator. The robotic system navigated the detector tracing the flat-top table to maintain the closest possible proximity to the phantom. For image reconstruction, detector trajectories were described by six parameters: radius-of-rotation, x and z detector shifts, and detector rotation θ, tilt ϕ and twist γ. These six parameters were obtained from the robotic system by calibrating the robot base and tool coordinates. Results: The robotic SPECT system was able to maneuver parallel-hole and pinhole collimated SPECT detectors in close proximity to the phantom, minimizing impact of the flat-top couch on detector-to-COR (center-ofrotation) distance. In acquisitions with background at 1/6th sphere activity concentration, photopeak contamination was heavy, yet the 17, 22, and 28 mm diameter spheres were readily observed with the parallel hole imaging, and the single, targeted sphere (28 mm diameter) was readily observed in the pinhole region-of-interest (ROI) imaging. Conclusion: Onboard SPECT could be achieved by a robot maneuvering a SPECT detector about patients in position for radiation therapy on a flat-top couch. The robot inherent coordinate frame could be an effective means to estimate detector pose for use in SPECT image reconstruction. PHS/NIH/NCI grant R21-CA156390-01A1.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The 1991-1992 walking robot design

The University of Maryland Walking Machine team designed and constructed a robot. This robot was completed in two phases with supervision and suggestions from three professors and one graduate teaching assistant. Bob was designed during the Fall Semester 1991, then machined, assembled, and debugged in the Spring Semester 1992. The project required a total of 4,300 student hours and cost under $8,000. Mechanically, Bob was an exercise in optimization. The robot was designed to test several diverse aspects of robotic potential, including speed, agility, and stability, with simplicity and reliability holding equal importance. For speed and smooth walking motion, the footpath contained a long horizontal component; a vertical aspect was included to allow clearance of obstacles. These challenges were met with a leg design that utilized a unique multi-link mechanism which traveled a modified tear-drop footpath. The electrical requirements included motor, encoder, and voice control circuitry selection, manual controller manufacture, and creation of sensors for guidance. Further, there was also a need for selection of the computer, completion of a preliminary program, and testing of the robot.

Azarm, Shapour↗

Development of High Throughput Process for Constructing 454 Titanium and Illumina Libraries

We have developed two processes with the Biomek FX robot to construct 454 titanium and Illumina libraries in order to meet the increasing library demands. All modifications in the library construction steps were made to enable the adaptation of the entire processes to work with the 96-well plate format. The key modifications include the shearing of DNA with Covaris E210 and the enzymatic reaction cleaning and fragment size selection with SPRI beads and magnetic plate holders. The construction of 96 Titanium libraries takes about 8 hours from sheared DNA to ssDNA recovery. The processing of 96 Illumina libraries takes less time than that of the Titanium library process. Although both processes still require manual transfer of plates from robot to other work stations such as thermocyclers, these robotic processes represent about 12- to 24-folds increase of library capacity comparing to the manual processes. To enable the sequencing of many libraries in parallel, we have also developed sets of molecular barcodes for both library types. The requirements for the 454 library barcodes include 10 bases, 40-60percent GC, no consecutive same base, and no less than 3 bases difference between barcodes. We have used 96 of the resulted 270 barcodes to construct libraries and pool to test the ability of accurately assigning reads to the right samples. When allowing 1 base error occurred in the 10 base barcodes, we could assign 99.6percent of the total reads and 100percent of them were uniquely assigned. As for the Illumina barcodes, the requirements include 4 bases, balanced GC, and at least 2 bases difference between barcodes. We have begun to assess the ability to assign reads after pooling different number of libraries. We will discuss the progress and the challenges of these scale-up processes.

59 BASIC BIOLOGICAL SCIENCES↗

A Biologically Inspired Cooperative Multi-Robot Control Architecture

A prototype cooperative multi-robot control architecture suitable for the eventual construction of large space structures has been developed. In nature, there are numerous examples of complex architectures constructed by relatively simple insects, such as termites and wasps, which cooperatively assemble their nests. The prototype control architecture emulates this biological model. Actions of each of the autonomous robotic construction agents are only indirectly coordinated, thus mimicking the distributed construction processes of various social insects. The robotic construction agents perform their primary duties stigmergically i.e., without direct inter-agent communication and without a preprogrammed global blueprint of the final design. Communication and coordination between individual agents occurs indirectly through the sensed modifications that each agent makes to the structure. The global stigmergic building algorithm prototyped during the initial research assumes that the robotic builders only perceive the current state of the structure under construction. Simulation studies have established that an idealized form of the proposed architecture was indeed capable of producing representative large space structures with autonomous robots. This paper will explore the construction simulations in order to illustrate the multi-robot control architecture.

Howsman, Tom↗

Modeling and Control of the Automated Radiator Inspection Device

Many of the operations performed at the Kennedy Space Center (KSC) are dangerous and repetitive tasks which make them ideal candidates for robotic applications. For one specific application, KSC is currently in the process of designing and constructing a robot called the Automated Radiator Inspection Device (ARID), to inspect the radiator panels on the orbiter. The following aspects of the ARID project are discussed: modeling of the ARID; design of control algorithms; and nonlinear based simulation of the ARID. Recommendations to assist KSC personnel in the successful completion of the ARID project are given.

Dawson, Darren↗

Experiments in thrusterless robot locomotion control for space applications

While performing complex assembly tasks or moving about in space, a space robot should minimize the amount of propellant consumed. A study is presented of space robot locomotion and orientation without the use of thrusters. The goal was to design a robot control paradigm that will perform thrusterless locomotion between two points on a structure, and to implement this paradigm on an experimental robot. A two arm free flying robot was constructed which floats on a cushion of air to simulate in 2-D the drag free, zero-g environment of space. The robot can impart momentum to itself by pushing off from an external structure in a coordinated two arm maneuver, and can then reorient itself by activating a momentum wheel. The controller design consists of two parts: a high level strategic controller and a low level dynamic controller. The control paradigm was verified experimentally by commanding the robot to push off from a structure with both arms, rotate 180 degs while translating freely, and then to catch itself on another structure. This method, based on the computed torque, provides a linear feedback law in momentum and its derivatives for a system of rigid bodies.

Jasper, Warren Joseph↗

The Challenge of Space Infrastructure Construction

This paper reviews the range of technologies that will contribute to the construction of space infrastructure that will both enable and, in some cases, provide the motivation for space exploration. Five parts are addressed: Managing complexity, robotics based construction, materials acquisition, manufacturing, and self-sustaining systems.

Howe, A. Scott↗

Androids: application of EAP as artificial muscles to entertainment industry

The classic movie Metropolis (1926), which is nowadays considered a cinema milestone, has shown the possibility to build robots called androids that are science and fiction run together to realize a dream: the human-like robot. In that movie, Dr. Rotwang transforms a simple and cold calculating robot into the body of a beautiful woman. Robots have often been depicted as metal creatures with cold steel bodies, but there is no reason why metals should be the only kind of material for construction of robots. The authors examined the issues related to applying electroactive polymers materials (EAP) to the entertainment industry. EAP are offering attractive characteristics with the potential to produce more realistic models of living creatures at significantly lower cost. This paper seeks to elucidate how EAP might infiltrate and ultimately revolutionize entertainment, showing some applicative examples.

Animatronics↗

Goddard Robotic Telescope

We are constructing the 14'' fully automated optical robotic telescope, Goddard Robotic Telescope (GRT), at the Goddard Geophysical and Astronomical Observatory. The aims of our robotic telescope are 1) to follow-up the Swift/Fermi Gamma-Ray Bursts (GRBs) and 2) to perform the coordinated optical observations of the Fermi/Large Area Telescope (LAT) Active Galactic Nuclei (AGN). Our telescope system consists of the 14'' Celestron Optical Telescope Assembly (OTA), the Astro-Physics 1200GTO mount, the Apogee U47 CCD camera, the JMI's electronic focuser, and the Finger Lake Instrumentation's color filter wheel with U, B, V, R and I filters. With the focal reducer, 20'x20' field of view has been achieved. The observatory dome is the Astro Haven's 7 ft clam-shell dome. We started the scientific observations on mid-November 2008. While not observing our primary targets (GRBs and AGNs), we are planning to open our telescope time to the public for having a wider use of our telescope in both a different research field and an educational purpose.

79 ASTRONOMY AND ASTROPHYSICS↗