Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk-based assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Plant Disease Detection Technology Assessment

Visual inspections by US Customs and Border Protection agriculture specialists have identified approximately 20,000 regulated, quarantined pests each year in agricultural products entering the United States. Most of these pests identified in the Agriculture Quarantine and Inspection (AQI) program are insects. Many pathogens are difficult to detect in agricultural products, particularly in early stages of infection. New technologies can help to detect plant pathogens and the diseases that they cause. This technology assessment was performed for the US Department of Homeland Security Science and Technology Directorate (DHS S&T) through the Food, Agriculture, and Veterinary Defense (FAV-D) program to identify emerging technologies that could address this hard problem. These emerging technologies differ in their diagnostic sensitivities and specificities, as well as in their measurement time and training requirements. New instruments that detect volatile organic compounds characteristic of plant disease or pathogens could provide a less invasive inspection method. Dogs, which can successfully detect many concealed agricultural products, have also been trained to detect some plant pests and pathogens. Simple immunological tests offer sensitive and specific detection of many pathogens at the point of use. Advanced imaging methods that use AI to sort fruits and vegetables and recognize anomalies at high speeds could be used in cooperation with exporters to improve food quality and reduce pests. Advances in nucleic acid–based detection methods that have become gold standards for confirmatory diagnostics are now making those methods available for faster, point-of-use detection. These new methods should be developed in the context of AQI operational requirements, which apply risk-based sampling protocols to protect agriculture and facilitate commerce and passenger transit.

59 BASIC BIOLOGICAL SCIENCES↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Risk-Based Fire Safety Experiment Definition for Manned Spacecraft

Risk methodology is used to define experiments to be conducted in space which will help to construct and test the models required for accident sequence identification. The development of accident scenarios is based on the realization that whether damage occurs depends on the time competition of two processes: the ignition and creation of an adverse environment, and the detection and suppression activities. If the fire grows and causes damage faster than it is detected and suppressed, then an accident occurred. The proposed integrated experiments will provide information on individual models that apply to each of the above processes, as well as previously unidentified interactions and processes, if any. Initially, models that are used in terrestrial fire risk assessments are considered. These include heat and smoke release models, detection and suppression models, as well as damage models. In cases where the absence of gravity substantially invalidates a model, alternate models will be developed. Models that depend on buoyancy effects, such as the multizone compartment fire models, are included in these cases. The experiments will be performed in a variety of geometries simulating habitable areas, racks, and other spaces. These simulations will necessitate theoretical studies of scaling effects. Sensitivity studies will also be carried out including the effects of varying oxygen concentrations, pressures, fuel orientation and geometry, and air flow rates. The experimental apparatus described herein includes three major modules: the combustion, the fluids, and the command and power modules.

Apostolakis, G. E.↗

Risk-based Spacecraft Fire Safety Experiments

Viewgraphs on risk-based spacecraft fire safety experiments are presented. Spacecraft fire risk can never be reduced to a zero probability. Probabilistic risk assessment is a tool to reduce risk to an acceptable level.

Apostolakis, G.↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation, volume 1

This document is the Executive Summary of a technical report on a probabilistic risk assessment (PRA) of the Space Shuttle vehicle performed under the sponsorship of the Office of Space Flight of the US National Aeronautics and Space Administration. It briefly summarizes the methodology and results of the Shuttle PRA. The primary objective of this project was to support management and engineering decision-making with respect to the Shuttle program by producing (1) a quantitative probabilistic risk model of the Space Shuttle during flight, (2) a quantitative assessment of in-flight safety risk, (3) an identification and prioritization of the design and operations that principally contribute to in-flight safety risk, and (4) a mechanism for risk-based evaluation proposed modifications to the Shuttle System. Secondary objectives were to provide a vehicle for introducing and transferring PRA technology to the NASA community, and to demonstrate the value of PRA by applying it beneficially to a real program of great international importance.

Fragola, Joseph R.↗

A Corrosion Risk Assessment Model for Underground Piping

The Pressure Systems Manager at NASA Ames Research Center (ARC) has embarked on a project to collect data and develop risk assessment models to support risk-informed decision making regarding future inspections of underground pipes at ARC. This paper shows progress in one area of this project - a corrosion risk assessment model for the underground high-pressure air distribution piping system at ARC. It consists of a Corrosion Model of pipe-segments, a Pipe Wrap Protection Model; and a Pipe Stress Model for a pipe segment. A Monte Carlo simulation of the combined models provides a distribution of the failure probabilities. Sensitivity study results show that the model uncertainty, or lack of knowledge, is the dominant contributor to the calculated unreliability of the underground piping system. As a result, the Pressure Systems Manager may consider investing resources specifically focused on reducing these uncertainties. Future work includes completing the data collection effort for the existing ground based pressure systems and applying the risk models to risk-based inspection strategies of the underground pipes at ARC.

Datta, Koushik↗

Rapid Response Risk Assessment in New Project Development

A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

Graber, Robert R.↗

Heritage and Advanced Technology Systems Engineering Lessons Learned from NASA Space Missions

Use of heritage and new technology is necessary/enabling to implementing small, low cost missions, yet overruns decrease the ability to sustain future mission flight rates The majority of the cost growth drivers seen in the D&NF study were embedded early during formulation phase and later realized during the development and I&T phases Cost drivers can be avoided or significantly decreased by project management and SE emphasis on early identification of risks and realistic analyses SE processes that emphasize an assessment of technology within the mission system to identify technical issues in the design or operational use of the technology. Realistic assessment of new and heritage spacecraft technology assumptions , identification of risks and mitigation strategies. Realistic estimates of effort required to inherit existing or qualify new technology, identification of risks to estimates and develop mitigation strategies. Allocation of project reserves for risk-based mitigation strategies of each individual area of heritage or new technology. Careful tailoring of inheritance processes to ensure due diligence.

Barley, Bryan↗

An Assessment of Environmental Health Needs

Environmental health fundamentally addresses the physical, chemical, and biological risks external to the human body that can impact the health of a person by assessing and controlling these risks in order to generate and maintain a health-supportive environment. In manned spacecraft, environmental health risks are mitigated by a multi-disciplinary effort, employing several measures including active and passive controls, by establishing environmental standards (SMACs, SWEGs, microbial and acoustics limits), and through environmental monitoring. Human Health and Performance (HHP) scientists and Environmental Control and Life Support (ECLS) engineers consider environmental monitoring a vital component to an environmental health management strategy for maintaining a healthy crew and achieving mission success. ECLS engineers use environmental monitoring data to monitor and confirm the health of ECLS systems, whereas HHP scientists use the data to manage the health of the human system. Because risks can vary between missions and change over time, environmental monitoring is critical. Crew health risks associated with the environment were reviewed by agency experts with the goal of determining risk-based environmental monitoring needs for future NASA manned missions. Once determined, gaps in environmental health knowledge and technology, required to address those risks, were identified for various types of exploration missions. This agency-wide assessment of environmental health needs will help guide the activities/hardware development efforts to close those gaps and advance the knowledge required to meet NASA manned space exploration objectives. Details of the roadmap development and findings are presented in this paper.

Macatangay, Ariel V.↗

An Assessment of Environmental Health Needs for Manned Spacecraft

Environmental health fundamentally addresses the physical, chemical, and biological risks external to the human body that can impact the health of a person by assessing and controlling these risks in order to generate and maintain a health‐supportive environment. Environmental monitoring coupled with other measures including active and passive controls and the implementation of environmental standards (SMACs, SWEGs, microbial and acoustics limits) are used to ensure environmental health in manned spacecraft. NASA scientists and engineers consider environmental monitoring a vital component to an environmental health management strategy for maintaining a healthy crew and achieving mission success. Environmental monitoring data confirms the health of ECLS systems, in addition to contributing to the management of the health of human systems. Crew health risks associated with the environment were reviewed by agency experts with the goal of determining risk-based environmental monitoring needs for future NASA manned missions. Once determined, gaps in knowledge and technology, required to address those risks, were identified for various types of Exploration missions. This agency‐wide assessment of environmental health needs will help guide the activities/hardware development efforts to close those gaps and advance the knowledge required to meet NASA manned space exploration objectives. Details of this assessment and findings are presented in this paper.

Macatangay, Ariel V.↗

A Probabilistic Asteroid Impact Risk Model

Asteroid threat assessment requires the quantification of both the impact likelihood and resulting consequence across the range of possible events. This paper presents a probabilistic asteroid impact risk (PAIR) assessment model developed for this purpose. The model incorporates published impact frequency rates with state-of-the-art consequence assessment tools, applied within a Monte Carlo framework that generates sets of impact scenarios from uncertain parameter distributions. Explicit treatment of atmospheric entry is included to produce energy deposition rates that account for the effects of thermal ablation and object fragmentation. These energy deposition rates are used to model the resulting ground damage, and affected populations are computed for the sampled impact locations. The results for each scenario are aggregated into a distribution of potential outcomes that reflect the range of uncertain impact parameters, population densities, and strike probabilities. As an illustration of the utility of the PAIR model, the results are used to address the question of what minimum size asteroid constitutes a threat to the population. To answer this question, complete distributions of results are combined with a hypothetical risk tolerance posture to provide the minimum size, given sets of initial assumptions. Model outputs demonstrate how such questions can be answered and provide a means for interpreting the effect that input assumptions and uncertainty can have on final risk-based decisions. Model results can be used to prioritize investments to gain knowledge in critical areas or, conversely, to identify areas where additional data has little effect on the metrics of interest.

Asteroid↗

Introduction to Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT)

A key component in the development of NASA Human Research Programs (HRP) next generation risk model, the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) intends to deliver a means to quantify how HRP products impact astronaut medical and health risks. MEDPRAT is extensible to the majority of exploration missions. Similar to other risk models, the tool utilizes the available space and terrestrial medical data. MEDPRAT is designed to be extended with additional human health research information, medical equipment, space and terrestrial standards and practices to assess space flight medical risk in a manner consistent with other risk measures used in spacecraft and mission design. This tool provides risk-based medical system design information necessary to evaluate new technologies, procedures, research insights and mission plans.

physiological response↗

An Integrated Reliability and Physics-Based Risk Modeling Approach for Assessing Human Spaceflight Systems

This paper presents an integrated reliability and physics-based risk modeling approach for assessing human spaceflight systems. The approach is demonstrated using an example, end-to-end risk assessment of a generic-crewed space transportation system during a reference mission to the International Space Station. The behavior of the system is modeled using analysis techniques from multiple disciplines in order to properly capture the dynamic time- and state- dependent consequences of failures encountered in different mission phases. We discuss how to combine traditional reliability analyses with Monte Carlo simulation methods and physics-based engineering models to produce loss-of- mission and loss-of-crew risk estimates supporting risk-based decision-making and requirement verification. This approach facilitates risk-informed design by providing more realistic representation of system failures and interactions; identifying key risk-driving sensitivities, dependencies, and assumptions; and tracking multiple figures of merit within a single, responsive assessment framework that can readily incorporate evolving design information throughout system development.

Risk assessment↗

CHP-PRA Proof-of-Concept [Simulation] Sensitivity Assessment

An effort is underway to establish a Crew Health and Performance system (CHP) tradespace tool using a Probabilistic Risk Assessment (PRA) modeling and simulation system. The goal of the CHP-PRA effort is to provide a means of quantifying the integrated influence of CHP functions and capabilities on risk outcome metrics associated with health, performance, and long-term health. These metrics can then be used to establish potential risk-based trades on CHP system designed functionality and capabilities. Previously, our team demonstrated a proof-of-concept PRA approach that estimated the integrated influence of exercise countermeasures on 8 human system risks (Figure 1a) with outcomes associated with health and medical risk metrics. We reported that the change in the integrated relative health risk was small (Figure 1b) and that the small change in overall risk resulted from compounding and competing contribution levels of the individual risks. This interesting observation illustrates the emergent complexity of even straightforward representations of the human health and performance risk space and the ability of PRA models to capture this balance of global risk concerns. A key question that is not addressed in the initial analysis is “even though the global risk is relatively nominal, do any of the local risks become unacceptable?” In essence, we seek to determine what relative change in the human system risks are contributing to the relatively muted sensitivity of the proof-of-concept model combined risk assessments. Evaluations at the component risk level should elucidate if any individual risk reaches a high level that is subsequentially balanced by reductions in other areas. To further understand the relative changes in the component risks in the proof-of-concept model, and to elucidate how future refinements can be targeted, a means of establishing the contributions of the robustness of the proof-of-concept approach will be demonstrated.

astronaut health↗