Method and Prediction of Transition Velocities in a Circulating Fluidized Bed's Riser
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
2024 AIChE Annual Meeting conference presentation detailing the analysis of legacy solids concentration measure data taken via optical fiber probe in NETL's 12-inch Cold Flow Circulating Fluidized Bed (CFCFB), including discussion of the variation in statistical and chaotic parameters as a function of different fluidization regimes.
Presentation of experimental results of solids volume fraction data measurements in a 12-inch diameter cold flow circulating fluidized bed in relation to a dimensionless fluidization regime map. Statistical and chaotic system analysis results are shown to illustrate differences in hydrodynamic behavior at different operating conditions. Presentation was made at the ASTFE 10th Thermal and Fluids Engineering Conference, March 09-12, 2025.
This study evaluates and identifies a construction method for cutting a hole in a single-shell tank dome. This study also identifies and evaluates vendors for performing the cut.
This study evaluates and identifies a construction method for cutting a hole in a single-shell tank dome. This study also identifies and evaluates vendors for performing the cut.
Explore the source record for details and available documents.
Presented by NETL at NETL Multiphase Flow Workshop, 08/16
Presented by NETL at 8th World Congress on Particle Technology, 04/18
Presented by NETL at Clearwater Clean Energy Conference 06/19
In one aspect, a system for estimating fatigue damage in a riser string is provided. The system includes a plurality of accelerometers which can be deployed along a riser string and a communications link to transmit accelerometer data from the plurality of accelerometers to one or more data processors in real time. With data from a limited number of accelerometers located at sensor locations, the system estimates an optimized current profile along the entire length of the riser including riser locations where no accelerometer is present. The optimized current profile is then used to estimate damage rates to individual riser components and to update a total accumulated damage to individual riser components. The number of sensor locations is small relative to the length of a deepwater riser string, and a riser string several miles long can be reliably monitored along its entire length by fewer than twenty sensor locations.
Details of numerical simulations of two-phase gas-solid turbulent flow in the riser section of Circulating Fluidized Bed Reactor (CFBR) using Computational Fluid Dynamics (CFD) technique are reported. Two CFBR riser configurations are considered and modeled. Each of these two riser models consist of inlet, exit, connecting elbows and a main pipe. Both riser configurations are cylindrical and have the same diameter but differ in their inlet lengths and main pipe height to enable investigation of riser geometrical scaling effects. In addition, two types of solid particles are exploited in the solid phase of the two-phase gas-solid riser flow simulations to study the influence of solid loading ratio on flow patterns. The gaseous phase in the two-phase flow is represented by standard atmospheric air. The CFD-based FLUENT software is employed to obtain steady state and transient solutions for flow modulations in the riser. The physical dimensions, types and numbers of computation meshes, and solution methodology utilized in the present work are stated. Flow parameters, such as static and dynamic pressure, species velocity, and volume fractions are monitored and analyzed. The differences in the computational results between the two models, under steady and transient conditions, are compared, contrasted, and discussed.
The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)
The overall objective of the project was to verify the applicability of the FCMOM approach to the kinetic equations describing the particle flow dynamics. For monodispersed systems the fundamental equation governing the particle flow dynamics is the Boltzmann equation. During the project, the FCMOM was successfully applied to several homogeneous and in-homogeneous problems in different flow regimes, demonstrating that the FCMOM has the potential to be used to solve efficiently the Boltzmann equation. However, some relevant issues still need to be resolved, i.e. the homogeneous cooling problem (inelastic particles cases) and the transition between different regimes. In this report, the results obtained in homogeneous conditions are discussed first. Then a discussion of the validation results for in-homogeneous conditions is provided. And finally, a discussion will be provided about the transition between different regimes. Alongside the work on development of FCMOM approach studies were undertaken in order to provide insights into anisotropy or particles kinetics in riser hydrodynamics. This report includes results of studies of multiphase flow with unequal granular temperatures and analysis of momentum re-distribution in risers due to particle-particle and fluid-particle interactions. The study of multiphase flow with unequal granular temperatures entailed both simulation and experimental studies of two particles sizes in a riser and, a brief discussion of what was accomplished will be provided. And finally, a discussion of the analysis done on momentum re-distribution of gas-particles flow in risers will be provided. In particular a discussion of the remaining work needed in order to improve accuracy and predictability of riser hydrodynamics based on two-fluid models and how they can be used to model segregation in risers.
On the basis of the lowest observed smoothed monthly mean sunspot number, cycle 23 appears to have conventionally begun in May 1996, in conjunction with the first appearance of a new cycle, high-latitude spot-group. Such behavior, however, is considered rather unusual, since, previously (based upon the data- available cycles 12-22), the first appearance of a new cycle, high-latitude spot- group has always preceded conventional onset by at least 3 months. Furthermore, accepting May 1996 as the official start for cycle 23 poses a dilemma regarding its projected size and timing of maximum amplitude. Specifically, from the max-min and amplitude-period relationships we infer that cycle 23 should be above average in size and a fast riser, with maximum amplitude occurring before May 2000 (being in agreement with projections for cycle 23 based on precursor information), yet from its initial languid rate of rise (during the first 6 months of the cycle) we infer that it should be below average in size and a slow riser, with maximum amplitude occurring after May 2000. The dilemma vanishes, however, when we use a slightly later-occurring onset. For example, using August 1996, a date associated with a local secondary minimum prior to the rapid rise that began shortly thereafter (in early 1997), we infer that cycle 23's rate of rise is above that for the mean of cycles 1-22, the mean of cycles 10-22 (the modern era cycles), the mean of the modern era'fast risers,' and the largest of the modern era 'slow risers' (i.e., cycle 20), thereby, suggesting that cycle 23 will be both fast-rising and above average in size, peaking before August 2000. Additionally, presuming cycle 23 to be a well- behaved fast-rising cycle (regardless of whichever onset date is used), we also infer that its maximum amplitude likely will measure about 144.0 q+/- 28.8 (from the general behavior found for the bulk of modern era fast risers; i.e., 5 of 7 have had their maximum amplitude to lie within 20% of the mean curve for modern era fast risers). It is apparent, then, that sunspot number growth during 1998 will prove crucial for correctly establishing the size and shape of cycle 23.
Full text - Long Abstract. A routine video inspection of the annulus region of double-shell tank 241-A Y-102 in August of 2012 indicated the presence material in the annulus space between the primary and secondary liners. A comparison was made to previous inspections performed in 2006 and 2007. which indicated that a change had occurred. The material was observed at two locations on the floor of the annulus and one location at the top of the annulus region where the primary and secondary top knuckles meet (RPP-ASMT-53793). Subsequent inspections were performed. leading to additional material observed on the floor of the annulus space in a region that had not previously been inspected (WRPS-PER-2012-1363). The annulus Continuous Air Monitor (CAM) was still operational and was not indicating elevated radiation levels in the annulus region. When the camera from the inspections was recovered. it also did not indicate increased radiation above minimum contamination levels (WRPS-PER-2012-1363). A formal leak assessment team was established August 10, 2012 to review tank 241-AY-102 construction and operating histories and to determine whether the material observed in the annulus had resulted from a leak in the primary tank. The team consisted of individuals from Engineering. Base Operations and Environmental Protection. As this was a first-of-its-kind task. a method for obtaining a sample of the material in the annulus was needed. The consistency of the material was unknown.and the location of a majority of the material was not conducive to using the sampling devices that were currently available at Hanford. A subcontractor was tasked with the development fabrication.and testing of a sampling device that would be able to obtain multiple samples from the material on the annulus floor. as well as the material originating from a refractory air-slot near the floor of the annulus space. This sampler would need to be able to collect and dispense the material it collected into a sample jar retrieval device for transportation of the material to the 222-S laboratory on the Hanford site for analysis. The subcontractor agency fabricated a remote underground sampler by modifying off-the-shelf robotics and parts. Limited testing of the sampler was conducted using a mock-up of the tank annulus and one simulated material type -a salt block. The mock-up testing indicated that the sampler would be able to maneuver within the confined space and that the device worked with full functionality. A total of six weeks had passed from initiation to implementation of the new sampler in the 241-AY-102 tank annulus. Initial sample material was obtained from the annulus floor using the Off-Riser Sampler System that has been used at Hanford tor years to obtain material from the primary tanks. This could be used at the location near Riser 83 since the material was collected directly from the annulus floor and not from a location on the wall or behind a pipe, as was needed from the two locations near Riser 90. After obtaining a small sample of the material on the annulus floor.this sampler sustained terminal damage due to conduit pipes it had to transverse in order to collect and recover material from this location. Several issues were also encountered during deployment of the new sampler into the annulus near Riser 90. These included: Difficulty fitting the sampler down the 12-inch riser into the annulus due to a small tolerance in the size of the sampler; Failure of sampler components and functions during deployment including the camera. pneumatics.and bearing seals; Delays in the field due to supporting equipment issues including cables. cameras. and scaffolding; and, Low recovery of sample material obtained for analysis. The complications that occurred during deployment and use of the new sampler during the sampling event ultimately resulted in lower recovery of material from these locations in the annulus than was obtained using the Off-Riser Sampler System and limited the analyses that could be performed for determining the origin of the material. Following completion of the sample analyses and the assessment of its construction history and use. there was a consensus among the leak assessment team members that two of the three materials sampled from the annulus floor region were the result of waste leaking from a breach in the primary tank. The probable leak cause was identified as corrosion at high temperatures in a tank whose containment margins had been reduced due to construction difficulties (RPP-ASMT-53793). A formal Lessons Learned was created concerning designing equipment tor unique purposes under time constraints. This document was published in OPEXShare on May 20. 2013. It highlighted some of the issues that arose with the subcontractor sampler development and provided recommendations to prevent a recurrence should this task need to be performed again in the future. The document can be found at http://msa.hanford.gov/opex/lesson.cfm/2013/5/20/3481/AY-102-Annulus-Sampler-Designing-Equipment-for-Unique-Purposes-under-Time-Constraints/.
A method and system for manufacturing a cast iron crankshaft for a vehicle are provided. The system comprises a molding unit arranged to form a negative sand cast mold of the cast iron crankshaft. The mold comprising at least one molded cavity having a pattern with dimensions of the cast iron crankshaft. The system further comprises a feeding mechanism comprising a riser having a connector through which molten metallic material flows to the cast mold. The feeding mechanism feeds the molten metallic material at a riser connection angle in the at least one mold cavity. The riser connection angle corresponds to a connector modulus. The connector modulus is 20% greater than a cast modulus. The riser geometry corresponds to a riser modulus. The riser modulus is 20% greater than the connector modulus. The system further comprises a furnace, a cooling area, a separation unit, a controller and a power source.
This paper describes the ongoing development of robotic solutions for accessing and retrieving high-level radioactive waste from underground storage bins as part of the Calcine Retrieval Project at the INL Site. The waste is in the form of a solid powder, referred to as calcine, stored in a set of stainless steel bins within an underground concrete vault. Due to the radiation field produced by the calcine, all operations must be performed remotely. The Calcine Retrieval Project is currently carrying out proof-of-concept testing of methods for the various stages of calcine retrieval. The bins were designed with no means for access, so retrieval operations will require welding access riser pipes to the bins, followed by cutting through the bin walls from within the risers. These tasks are complicated by the fact that four of the risers must be placed off center on a domed surface, resulting in a weld joint that is curved and tilted relative to the riser axis. The Access Riser Connection robot is being developed to perform these operations using interchangeable welding and plasma cutting attachments. The majority of the calcine will be removed using a vacuum system and pneumatically transferred to storage. This system is not described in this paper. However, the bins contain several internal features that are expected to retain calcine, most notably circumferential stiffening rings on the walls and radial ribs on the floors. One of the solutions being developed for the task of retrieving this residual calcine is a vacuum crawler, a wheeled robot using vacuum to adhere to the interior walls of the bins. The vacuum crawler would use a separate vacuum system to remove residual calcine or would use compressed air to move calcine to a location from which it can be retrieved more easily. While comparable welding and wall-climbing robots have been developed before, this particular application has several constraints that are not satisfied by existing systems. For this reason, both the access riser welder and the vacuum crawler, although still under development, may be of interest to other projects faced with similar constraints. (author)
The full-scale, room-temperature Hanford Tank Waste Treatment and Immobilization Plant (WTP) High-Level Waste (HLW) melter riser test system was successfully operated with silicone oil and magnetite particles at a loading of 0.1 vol %. Design and construction of the system and instrumentation, and the selection and preparation of simulant materials, are briefly reviewed. Three experiments were completed. A prototypic pour rate was maintained, based on the volumetric flow rate. Settling and accumulation of magnetite particles were observed at the bottom of the riser and along the bottom of the throat after each experiment. The height of the accumulated layer at the bottom of the riser, after the first pouring experiment, approximated the expected level given the solids loading of 0.1 vol %. More detailed observations of particle resuspension and settling were made during and after the third pouring experiment. The accumulated layer of particles at the bottom of the riser appeared to be unaffected after a pouring cycle of approximately 15 minutes at the prototypic flow rate. The accumulated layer of particles along the bottom of the throat was somewhat reduced after the same pouring cycle. Review of the time-lapse recording showed that some of the settling particles flow from the riser into the throat. This may result in a thicker than expected settled layer in the throat.