Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Resource and environmental surveys from space with the thematic mapper in the 1980's

The selection of observation of vegetation is the primary optimization objective of the thematic mapper. The following are aspects of plans for the thematic mapper: (1) to include an appropriately modified first generation MSS in the thematic mapper mission; (2) to provide assured coverage for a minimum of six years to give agencies and other users an opportunity to justify the necessary commitment of resources for the transition into a completely valid operational phase; (3) to provide for global, direct data read-out, without the necessity for on-board data storage or dependence on foreign receiving stations; (4) to recognize the operational character of the thematic mapper after successful completion of its experimental evaluation; and (5) to combine future experimental packages with compatible orbits as part of the operational LANDSAT follow-on payloads.

Source record↗

A Two-Stage Approach for PV Inverter Engagement in Power Factor Correction and Voltage Regulation

The rapid integration of distributed energy resources, like solar photovoltaics (PVs), can lead to overvolt-age challenges due to reverse power flow and a noticeable decrease in power factor at the substation interface. While existing literature extensively explores utilizing smart inverter capabilities for reactive power flexibility using a volt-var curve (VVC), obtaining time-varying operating points of such curves in real-time is challenging due to computational demands and communication requirements. Similarly, employing optimization-based approaches for reactive power control and active voltage regulation in large-scale distribution feeders is difficult due to the complexity of the problem and the challenges in effectively engaging customer-owned resources. This paper proposes a two-stage strategy to harness smart inverters for reactive power support. The first stage formulates short-term planning by optimally designing VVCs (on a daily or hourly basis) for large-scale solar PVs based on projected system needs and communicating optimal curves to smart inverters in advance. Subsequently, the second stage employs a transactive-based method to involve customer-owned PVs for reactive power support, effectively enhancing overall system performance and addressing real-time demands. In conclusion, the efficacy of this approach will be demonstrated using real-world distribution circuits provided by Vermont Electric Power Company (VELCO) and Vermont Electric Cooperative (VEC).

Poudel, Shiva [Pacific Northwest National Laborato↗

A Framework for Dimensioning VDL-2 Air-Ground Networks

This paper describes a framework developed at MITRE for dimensioning a Very High Frequency (VHF) Digital Link Mode 2 (VDL-2) Air-to-Ground network. This framework was developed to support the FAA's Data Communications (Data Comm) program by providing estimates of expected capacity required for the air-ground network services that will support Controller-Pilot-Data-Link Communications (CPDLC), as well as the spectrum needed to operate the system at required levels of performance. The Data Comm program is part of the FAA's NextGen initiative to implement advanced communication capabilities in the National Airspace System (NAS). The first component of the framework is the radio-frequency (RF) coverage design for the network ground stations. Then we proceed to describe the approach used to assess the aircraft geographical distribution and the data traffic demand expected in the network. The next step is the resource allocation utilizing optimization algorithms developed in MITRE's Spectrum ProspectorTM tool to propose frequency assignment solutions, and a NASA-developed VDL-2 tool to perform simulations and determine whether a proposed plan meets the desired performance requirements. The framework presented is capable of providing quantitative estimates of multiple variables related to the air-ground network, in order to satisfy established coverage, capacity and latency performance requirements. Outputs include: coverage provided at different altitudes; data capacity required in the network, aggregated or on a per ground station basis; spectrum (pool of frequencies) needed for the system to meet a target performance; optimized frequency plan for a given scenario; expected performance given spectrum available; and, estimates of throughput distributions for a given scenario. We conclude with a discussion aimed at providing insight into the tradeoffs and challenges identified with respect to radio resource management for VDL-2 air-ground networks.

Aviation↗

Electronic Neural Networks

Viewgraphs on electronic neural networks for space station are presented. Topics covered include: electronic neural networks; electronic implementations; VLSI/thin film hybrid hardware for neurocomputing; computations with analog parallel processing; features of neuroprocessors; applications of neuroprocessors; neural network hardware for terrain trafficability determination; a dedicated processor for path planning; neural network system interface; neural network for robotic control; error backpropagation algorithm for learning; resource allocation matrix; global optimization neuroprocessor; and electrically programmable read only thin-film synaptic array.

Thakoor, Anil↗

SPASIM: A Spacecraft Simulator

The SPAcecraft SIMulator (SPASIM) simulates the functions and resources of a spacecraft to quickly perform conceptual design (Phase A) trade-off and sensitivity analyses and uncover any operational bottlenecks during any part of the mission. Failure modes and operational contingencies can be evaluated allowing operational planning (what-if scenarios) and optimization for a range of mission scenarios. The payloads and subsystems are simulated, using a hierarchy of graphical models, in terms of how their functions affect resources such as propellant, power, and data. Any of the inputs and outputs of the payloads and subsystems can be plotted during the simulation or stored in a file so they can be used by other programs. Most trade-off analyses, including those that compare current versus advanced technology, can be performed by changing values in the parameter menus. However, when a component is replaced by one with a different functional architecture, its graphical model can also be modified or replaced by drawing from a component library. SPASIM has been validated using several spacecraft designs that were at least at the Critical Design Review level. The user and programmer guide, including figures, is available on line as a hypertext document. This is an easy-to-use and expandable tool which is based on MATLAB(R) and SIMULINK(R). It runs on Silicon Graphics Inc. workstations and personal computers with Windows 95(TM) or NT(TM).

Liceaga, Carlos A.↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Distribution Substation Planning Toolkit (dsp-toolkit) v1.0

The Distribution Substation Planning Toolkit (DSP Toolkit) is a software suite designed to streamline the planning and optimization of distribution substations. This toolkit offers a comprehensive set of tools and APIs for data curation, short-term electric load forecasting, and weather-sensitive load adjustment, making it an essential resource for utility companies, engineers, and researchers. Features • Data Preprocessing and Curation: Efficiently manage and preprocess large datasets to ensure high-quality input for analysis. • Short-Term Load Forecasting: Utilize data-driven models to predict short-term electric loads accurately. • Weather-Sensitive Modeling: Automatically adjust load forecasts based on weather data to predict future peak demands more precisely. Uses The DSP Toolkit is ideal for planning and optimizing distribution substations, providing a user-friendly interface and comprehensive documentation. It is suitable for both novice and experienced users, facilitating efficient and accurate planning processes. Advantages • Efficiency: Automates complex planning tasks, reducing manual effort and minimizing errors. • Scalability: Handles large datasets and complex models, making it suitable for large-scale projects. • Community and Support: Open-source with active community contributions, ensuring continuous improvement and support. • Extensibility: Easily extendable with custom modules and plugins, allowing users to tailor the toolkit to their specific needs. The DSP Toolkit stands out by offering a robust, flexible, and user-friendly solution for distribution substation planning. Public Abstract

Li, Han [Lawrence Berkeley National Laboratory (LB↗

HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler

HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.

Hua, Hook↗

Optimal CO 2 storage management considering safety constraints in multi-stakeholder multi-site GCS projects: A Markov game perspective

Geological carbon storage (GCS) projects could involve a diverse array of stakeholders or players from public, private, and regulatory sectors, each with different objectives and responsibilities. Given the complexity, scale, and long-term nature of GCS operations, determining whether individual stakeholders can independently optimize their interests — or whether collaborative coalition agreements are needed — remains a central question for effective GCS project planning and management. To access large, high-quality storage resources, future GCS deployment may increasingly occur in geologically connected sites, where shared geological features such as pressure space and reservoir pore capacity can lead to competitive behavior among stakeholders. In this work, we propose a paradigm based on Markov games to quantitatively investigate how different coalition structures affect the goals of stakeholders. We frame this multi-stakeholder multi-site problem as a multi-agent reinforcement learning problem with safety constraints. Our approach enables agents to learn optimal strategies while complying with safety regulations. We present an example where multiple operators are injecting CO 2 into their respective project areas in a geologically connected basin. To address the high computational cost of repeated simulations of high fidelity models, a previously developed surrogate model based on the Embed-to-Control (E2C) framework is employed. Our results demonstrate the effectiveness of the proposed framework in addressing optimal management of CO 2 storage when multiple stakeholders with different objectives and goals are involved.

58 GEOSCIENCES↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

A Hierarchical Optimization Method for Electric Vertical Takeoff and Landing Aircraft Network Design

Electric vertical takeoff and landing aircraft (eVTOLs) are expected to serve urban air mobility in a station-to-station configuration, which makes the optimal network design of eVTOL stations a critical question to explore. Existing approaches often face limitations, such as the inability to interact station locations with demand or difficulty in finding the optimal solution for large study regions. Here, this paper first proposes a mathematical model to generate optimal eVTOL station locations while considering associated potential eVTOL demand, and then proposes a heuristic algorithm, Hierarchical Optimization MEthod (HOME), to efficiently solve the model. With a case study of Southern California, HOME was compared to 1) directly solving the original integer linear programming-based network design problem, and 2) employing the widely used genetic algorithm. Results suggest that HOME can find optimal solutions with limited computational resources. The proposed framework powered by HOME provides a computationally efficient way to support urban air mobility planning.

97 MATHEMATICS AND COMPUTING↗

Recent results in Mars Relay Network planning and scheduing

At different time periods in the future, Mars missions will overlap and previous studies indicate that during such periods existing deep space communication infrastructure will not be able to handle all Mars communication needs. A plausible solution is to perform optimal resource allocation for the Mars relay communication network; a network consisting of multiple surface units and orbiters on Mars and the Deep Space Stations. Unlike direct-to-earth, a relay communication, either in real-time or store-and-forward, can increase network science data return, reduce surface unit's direct-to-earth communication demands, and enable communication even when the surface unit is not facing Earth. It is the objective of this paper to take advantage of the relay operation to efficiently plan and schedule the network communications.

Relay Network planning and scheduling constrained ↗

Maintaining Situation Awareness with Autonomous Airborne Observation Platforms

Unmanned Aerial Vehicles (UAVs) offer tremendous potential as intelligence, surveillance and reconnaissance (ISR) platforms for early detection of security threats and for acquisition and maintenance of situation awareness in crisis conditions. However, using their capabilities effectively requires addressing a range of practical and theoretical problems. The paper will describe progress by the "Autonomous Rotorcraft Project," a collaborative effort between NASA and the U.S. Army to develop a practical, flexible capability for UAV-based ISR. Important facets of the project include optimization methods for allocating scarce aircraft resources to observe numerous, distinct sites of interest; intelligent flight automation software than integrates high-level plan generation capabilities with executive control, failure response and flight control functions; a system architecture supporting reconfiguration of onboard sensors to address different kinds of threats; and an advanced prototype vehicle designed to allow large-scale production at low cost. The paper will also address human interaction issues including an empirical method for determining how to allocate roles and responsibilities between flight automation and human operations.

Freed, Michael↗

Electrochemical Solutions for Advanced Life Support

The Oxygen Generating Assembly (OGA) on-board the International Space Station (ISS) employs a polymer electrolyte membrane (PEM) water electrolysis cell stack to electrochemically dissociate water into its two components – oxygen and hydrogen. Oxygen is provided to the cabin atmosphere for crew respiration while the hydrogen is delivered to a carbon dioxide reduction system to recover oxygen as water. The design of the OGA evolved over a number of years to arrive at the system solution that is currently operational on ISS. Future manned missions to space will require advanced technologies that eliminate the need for resupply from earth and feature in-situ resource utilization to sustain crew life and to provide useful materials to the crew. The architects planning such missions should consider all potential solutions at their disposal to arrive at an optimal vehicle solution that minimizes crew maintenance time, launch weight, installed volume and energy consumption demands. Skyre is developing new technologies through funding from NASA, the Department of Energy, and internal investment based on PEM technology that could become an integral part of these new vehicle solutions. At varying stages of Technology Readiness Level (TRL) are: an oxygen concentrator and compressor that can separate oxygen from an air stream and provide an enriched oxygen resource for crew medical use and space suit recharge without any moving parts in the pure oxygen stream; a regenerative carbon dioxide removal system featuring a PEM-based sorbent regenerator; a carbon dioxide reduction system that electrochemically produces organic compounds that could serve as fuels or as a useful intermediary to more beneficial compounds; and an electrochemical hydrogen separator and compressor for hydrogen recycle. The technical maturity of these projects is presented along with pertinent performance test data that could be beneficial in future study efforts.

Roy, Robert J.↗