Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “request for proposals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The Impacts on California of Expanded Regional Cooperation to Operate the Western Grid (Final Report)

Policy makers in California and other western states are exploring options for greater regional cooperation in managing the western power grid to better achieve public policy goals. This report, requested by the California State Assembly and commissioned by the California Independent System Operator (CAISO), reviews and summarizes recent proposals, studies, and papers addressing various modes of regional cooperation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Network Capacity Market Design: Marginal Distribution Capacity Pricing Mechanism for Efficient Investment and Cost Allocation

As electricity markets begin to shift from reliance on large, centralized power plants and towards distributed energy resources (DERs), there is a growing acknowledgement that more efficient planning, operations, and oversight is needed in the distribution system. This paper addresses one step in that direction by proposing an auction mechanism that uses a detailed distribution system planning model that allocates permits to end-used customers who request capacity to install new devices at their location and network upgrade contracts to utilities or 3rd-party companies who offer to upgrade system components. The resulting plan maximizes market surplus, that is, maximizes the total benefit to consumers minus the cost of network upgrades. We apply a marginal pricing scheme to the auction’s results such that the cost of each permits or contracts is differentiated by time and location, based on the Lagrangian multipliers of binding network constraints. These prices are shown to be no greater than the bid price of any awarded contract and no less than the offered cost of any awarded upgrade contract. Furthermore, the nonlinearity of power flows in the planning model result in an additional surplus that would be collected by the entity that hosts the auction, which could then be refunded to market participants or used to cover overhead costs of running the market. We provide four example auction results in a simple three-node distribution feeder to demonstrate the properties of the design. Results suggest that larger or more realistic case studies could be a promising next step.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Design and Testing of Candidate Coating Materials Applied to Inconel Bubblers for Improved Corrosion Resistance

The US Department of Energy (DOE) Office of Environmental Management Technology Development (EM-TD) has requested Savannah River National Laboratory (SRNL) evaluate ceramic coating materials that can extend the service life of Hanford melter bubblers. The proposed Task will focus on the development of ceramic coating materials for Inconel bubblers to reduce corrosion and increase the service life of the bubblers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HAM: Hotspot-Aware Manager for Improving Communications with 3D-Stacked Memory

merging High-Performance Computing (HPC) workloads, such as graph analytics, machine learning, and big data science, are data-intensive. Data-intensive workloads usually present fine-grained memory accesses with limited or no data locality, and thus incur frequent cache misses and low utilization of memory bandwidth. 3D-stacked memory devices such as Hybrid Memory Cube (HMC) and High Bandwidth Memory (HBM) can provide significantly higher bandwidth than conventional memory modules. However, the traditional interfaces and optimization methods for JEDEC DDR devices do not allow to fully exploit the potential performance of 3D-stacked memory with the massive amount of irregular memory accesses of data-intensive applications. In this paper, we propose a novel Hotspot-Aware Manager (HAM) infrastructure for 3D-stacked memory devices capable of optimizing memory access streams via request aggregation, hotspot detection, and in-memory prefetching. %and an associated hotspot-aware page policy. We present the HAM design and implementation, and simulate it on a system using RISC-V embedded cores with attached HMC devices. We extensively evaluate HAM with over 12 benchmarks and applications representing diverse irregular memory access patterns. The results show that, on average, HAM reduces redundant requests by 37.51\% and increases the prefetch buffer hit rate by 4.2 times, compared to a baseline streaming prefetcher. On the selected benchmark set, HAM provides performance gains of 21.81\% in average (up to 34.28\%) and power savings of 35.07\% over a standard 3D-stacked memory.

Wang, Xi↗

Secure Storage: Historical Documentation of TA-08-0032, TA-11-0036, TA-22-0016, TA-22-0023, TA-22-0025, TA-22-0035, TA-37-0006, TA-37-0009, and TA-37-0020

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (NA-LA), is pursuing the decommissioning and demolition (D&D) of facilities contaminated with high-explosives residues at the Los Alamos National Laboratory (Laboratory or LANL). This effort affects nine facilities associated with high-explosives and detonator research, development, and storage: Technical Area (TA) 8 Facility 32 (TA-08-0032), TA-11-0036, TA-22-0016, TA-22-0023, TA-22-0025, TA-22-0035, TA-37-0006, TA-37-0009, and TA-37-0020. All nine facilities proposed for D&D have been evaluated for listing in the National Register of Historic Places (NRHP) and determined eligible. NA-LA previously requested the State Historic Preservation Officer (SHPO) to concur with the NRHP-eligibility determinations of these nine properties presented in four reports: (1) TA-08-0032 was determined eligible for listing in the NRHP in the report, From Ranching to Radiography: An Assessment of Historic Buildings at Anchor West Site (TA-8), Vol. 1 (McGehee et al. 2008a). The SHPO concurred with this eligibility determination on November 26, 2008. (2) TA-11-0036 was determined eligible for listing in the NRHP in the report, ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16, Vol. 1) (McGehee et al. 2003). The SHPO concurred with this eligibility assessment on June 22, 2003. (3) TA-22-0016, TA-22-0023, TA-22-0025, and TA-22-0035 were determined eligible for listing in the NRHP in the report, DX Division’s Facility Strategic Plan: Consolidation and Revitalization at Technical Areas 6, 8, 9, 14, 15, 22, 36, 39, 40, 60, and 69, Vol. 1 (McGehee et al. 2005a). The SHPO concurred with these eligibility determinations on April 18, 2006. (4) TA-37-0006, TA-37-0009, and TA-37-0020 were determined eligible for listing in the NRHP in the report, High Explosives and the Nuclear Stockpile: An Assessment of Historic Buildings at Magazine Area C (TA-37), Vol. 1 (McGehee et al. 2008b). The SHPO concurred with these eligibility determinations on April 17, 2008. In a letter dated January 24, 2020, NA-LA acknowledged that the D&D of these nine NRHP-eligible facilities was an adverse effect that requires resolution through mitigation. NA-LA proposed the use of standard mitigation practices as defined in the Programmatic Agreement (PA) among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office, and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos, New Mexico. The PA states that adverse effects to NRHP-eligible buildings and structures will be resolved according to the standard practices defined in Part II, Section 10, of the Laboratory’s Cultural Resources Management Plan, A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (Purtzer et al. 2019), and Section 2.B of Appendix D of the PA itself. The standard practice documentation package includes the following components: (1) Interior and exterior photography and production of archival-quality digital photographs; (2) Documentation and curation of historically significant equipment and artifacts; (3) A list of all known drawings for the property; (4) Reduced-scale reproductions of selected drawings for the property; (5) A location map that shows the location of the property relative to the entire Laboratory property; (6) Reproduction of historical TA maps; (7) A TA map that depicts the footprint of each eligible and non-eligible facility; and (8) An expanded historic context that uses oral-history interviews, if available. On March 3, 2020, the SHPO concurred with the adverse effect determination and the mitigation plan. The documentation package, as previously described, is provided in Volumes 1 and 2 of this report.

99 GENERAL AND MISCELLANEOUS↗

Enabling DER Participation in Frequency Regulation Markets

Distributed energy resources (DERs) are playing an increasing role in ancillary services for the bulk grid, particularly in frequency regulation. In this article, we propose a framework for collections of DERs, combined to form microgrids and controlled by aggregators, to participate in frequency regulation markets. Our approach covers both the identification of bids for the market clearing stage and the mechanisms for the real-time allocation of the regulation signal. The proposed framework is hierarchical, consisting of a top layer and a bottom layer. The top layer consists of the aggregators communicating in a distributed fashion to optimally disaggregate the regulation signal requested by the system operator. The bottom layer consists of the DERs inside each microgrid whose power levels are adjusted so that the tie line power matches the output of the corresponding aggregator in the top layer. The coordination at the top layer requires the knowledge of cost functions, ramp rates, and capacity bounds of the aggregators. We develop meaningful abstractions for these quantities respecting the power flow constraints and taking into account the load uncertainties and propose a provably correct distributed algorithm for optimal disaggregation of regulation signals among the microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Applications of biomass-derived solvents in biomass pretreatment – Strategies, challenges, and prospects

We report biomass pretreatment is considered a key step in the 2nd generation biofuel production from lignocellulosic biomass. Research on conventional biomass pretreatment solvents has mainly been focused on carbohydrate conversion efficiency, while their hazardousness and/or carbon intensity were not comprehensively considered. Recent sustainability issues request further consideration for eco-friendly and sustainable alternatives like biomass-derived solvents. Carbohydrate and lignin-derived solvents have been proposed and investigated as green alternatives in many biomass processes. In this review, the applications of different types of biomass pretreatment solvents, including organic, ionic liquid, and deep eutectic solvents, are thoroughly discussed. The role of water as a co-solvent in these pretreatment processes is also reviewed. Finally, current research challenges and prospects of utilizing biomass-derived pretreatment solvents for pretreatment are discussed. Given bioethanol's market potential and increasing public awareness about environmental concerns, it will be a priority adopting sustainable and green biomass pretreatment solvents in biorefinery.

09 BIOMASS FUELS↗

Examining Thermolytic Production of Hydrogen from Lubrication Oil

Savannah River National Laboratory (SRNL) was requested by Savannah River Remediation (SRR) to conduct testing via Technical Task Request (HR) to determine the thermolytic HGR of Mobil SHC™ 630, a lubrication oil. Currently, 35 gallons of contaminated Mobil SHC 630 is proposed for release into the recycle stream from the Defense Waste Processing Facility (DWPF) to Tank 22 and then to the 242-16H (2H) Evaporator system. Inhibited recycle waste in the Recycle Collection Tank (RCT) is transferred to Recycle Pump Tank (RPT) in the Low Point Pump Pit (LPPP) and then to the Concentration, Storage and Transfer Facilities (CSTF) H-area. The lubrication oil would be added directly to the RPT, bypassing the RCT. The current DWPF waste compliance plan for liquid transfers from the RCT to the CSTF limits the concentration of Mobil SHC 630 to <1,100 ppm which is equal to <9.3 gallons of Mobil SHC 630 when considering a 7,500 gal RCT batch with an initial Mobil SHC 630 concentration of 42 mg/L. Mobil SHC 630 is expected to be largely immiscible in the caustic aqueous waste stream. It is a blend of base oils including polyalphaolefin (PAO) base oil and additives such as triphenylphosphate and cresyl diphenyl phosphate at various concentrations (<0.25 wt%). While the base oils are expected to be largely unreactive in CSTF waste, the triarylphosphates additives would be expected to hydrolyze in the caustic waste, forming diarylphosphates and phenol. The tests described herein were governed by a single Run Plan and will determine thermolytic HGR from the caustic aqueous solution, as well as from any organic phases present.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Probe Campaign FY23 Omega EP Shot Request [Slides]

The goal of the Multi-Probe experimental campaign is to assess the feasibility of using multiple probe types (x ray, proton, neutron, and electron) in future LANL radiographic facilities. The experiments proposed for FY23 will begin developing a neutron source for radiography at Omega EP.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Investigation into Scalable and Detection-Enhanced Satellite Conjunction Assessment

Imaging opportunities (viewable conjunctions) of Resident Space Objects (RSOs) by satellites are not continuously discovered. We propose to continuously produce and report viewable conjunctions among objects in orbit. Viewable conjunctions are events in space and time when a satellite may favorably view a Resident Space Object (RSO). Favorability is defined by a set of constraints, e.g., solar illumination, distance between observer and target, orbital location for viewable event. Computing viewable conjunctions requires calculation of orbital propagation while considering constraints based on the state vectors of position, velocity, with covariance for both satellite and RSO. We propose two parallel lanes of effort: acceleration and research. The objective of acceleration is to avoid missed opportunities and reduce latency for satellite maneuver requests through continuous prediction and reporting of viewable conjunctions. The effort will begin by deploying currently available software on dedicated systems and continue with optimizing the code for high performance computing hardware. The research lane aims to expand RSO inspection and modeling capabilities. Among our current research ideas are spectral characterization of RSO materials and planning multiple observations to recover RSO 3D form. Computing resources at Oak Ridge National Laboratory (ORNL) are available for the acceleration work. Laika, Maxar conjunction prediction dashboard software, and Bluesim, Maxar orbital propagation software, are expected to be the first software in the acceleration lane. Laike and Bluesim are to be provided by the sponsor, and output will be made accessible through its dashboard. Deliverables will follow a gated schedule to the sponsor. ORNL will provide progressively more robust viewable conjunction assessments from both modelled and actual ephemerides.

97 MATHEMATICS AND COMPUTING↗

Pedestrian-Involved Traffic Signal Optimization Using Decentralized Graph-based Multi-Agent Reinforcement Learning

Incorporating pedestrian movements in traffic signal timing optimization is essential for ensuring smooth and safe urban transportation systems. To develop an effective signal timing plan, it is crucial to comprehend how various pedestrian accommodation strategies impact both vehicle and pedestrian flow. This study explores the application of the Decentralized Graph-based Multi-Agent Reinforcement Learning (DGMARL) method for signal timing optimization. It considers both pedestrian and vehicle traffic state and assesses the effects of fixed and adaptive pedestrian request response on traffic and signal timing. The evaluation of DGMARL encompasses vehicles Eco_PI which is fuel consumption impact related to vehicle stops and stop delay, and pedestrian waiting time to ensure overall system efficiency. The proposed approach was evaluated using a Digital Twin microscopic traffic simulation model of MLK Smart Corridor in Chattanooga, Tennessee. The evaluation outcomes of vehicles Eco_PI, pedestrian waiting time and serving time are compared with the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall to determine the most suitable approaches for various traffic conditions. The results indicated that, on average, the strategy of Signal timing optimization with adaptive pedestrian request response improved the Eco_PI by 32.43%, and Signal timing optimization with both automated pedestrian traffic demand and adaptive pedestrian request response improved the Eco_PI by 31.62% compared to the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall.

K Kumarasamy, Vijayalakshmi↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

Selvakumar, Balaji [ORNL]↗

The Muon Collider

Muons offer a unique opportunity to build a compact high-energy electroweak collider at the 10 TeV scale. A Muon Collider enables direct access to the underlying simplicity of the Standard Model and unparalleled reach beyond it. It will be a paradigm-shifting tool for particle physics representing the first collider to combine the high-energy reach of a proton collider and the high precision of an electron-positron collider, yielding a physics potential significantly greater than the sum of its individual parts. A high-energy muon collider is the natural next step in the exploration of fundamental physics after the HL-LHC and a natural complement to a future low-energy Higgs factory. Such a facility would significantly broaden the scope of particle colliders, engaging the many frontiers of the high energy community. The last European Strategy for Particle Physics Update and later the Particle Physics Project Prioritisation Panel in the US requested a study of the muon collider, which is being carried on by the International Muon Collider Collaboration. In this comprehensive document we present the physics case, the state of the work on accelerator design and technology, and propose an R\&D project that can make the muon collider a reality.

Accelerator Physics (physics.acc-ph)↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Exact Algorithm for the Linear Tape Scheduling Problem

Magnetic tapes are often considered as an outdated storage technology, yet they are still used to store huge amounts of data. Their main interests are a large capacity and a low price per gigabyte, which come at the cost of a much larger file access time than on disks. With tapes, finding the right ordering of multiple file accesses is thus key to performance. Moving the reading head back and forth along a kilometer long tape has a non-negligible cost and unnecessary movements thus have to be avoided. However, the optimization of tape request ordering has rarely been studied in the scheduling literature, much less than I/O scheduling on disks. For instance, minimizing the average service time for several read requests on a linear tape remains an open question. Therefore, in this paper, we aim at improving the quality of service experienced by users of tape storage systems, and not only the peak performance of such systems. To this end, we propose a reasonable polynomial-time exact algorithm while this problem and simpler variants have been conjectured NP-hard. We also refine the proposed model by considering U-turn penalty costs accounting for inherent mechanical accelerations. Then, we propose a low-cost variant of our optimal algorithm by restricting the solution space, yet still yielding an accurate suboptimal solution. Finally, we compare our algorithms to existing solutions from the literature on logs of the mass storage management system of a major datacenter. This allows us to assess the quality of previous solutions and the improvement achieved by our low-cost algorithm. Aiming for reproducibility, we make available the complete implementation of the algorithms used in our evaluation, alongside the dataset of tape requests that is, to the best of our knowledge, the first of its kind to be publicly released.

Honoré, Valentin↗

Hierarchical Flexibility Offering Strategy for Integrated Hybrid Resources in Real-time Energy Markets

This paper proposes a hierarchical model for determining the energy flexibility offering strategy of integrated hybrid resources (IHRs) in power distribution systems to participate in real-time energy markets. The proposed model utilizes the scalability, fast response time, and uncertainty observation of deep reinforcement learning (DRL) to overcome the scalability issue of operating numerous flexible resources and deliverability of energy flexibility to the real-time markets in the presence of the network constraints. To that end, the power distribution system is divided into multiple IHRs, where different types of flexible loads, energy storage systems, and solar plants with controllable inverters are operated through local IHR controllers, trained by deep deterministic policy gradient (DDPG) algorithm. Active power request and reactive power capacity of IHRs are then transmitted to a central flexibility controller, where a quadratic optimization model ensures the deliverability of the energy flexibility to the real-time energy market by satisfying the distribution network constraints. The proposed model is implemented on the 123-bus test power distribution system, demonstrating the capability of DRL-based hierarchical model for scalable operation of IHRs in order to offer deliverable energy flexibility to the real-time energy market.

Majidi, Majid↗

SYMBIOSYS: A Methodology for Performance Analysis of Composable HPC Data Services

Microservices are a powerful new way of building, customizing, and deploying distributed services owing to their flexibility and maintainability. Several large-scale distributed platforms have emerged to serve the growing needs of data-centric workloads and services in commercial computing. Concurrently, high-performance computing (HPC) systems and software are rapidly evolving to meet the demands of diversified applications and heterogeneity. The interplay of hardware factors, software configuration parameters, and the flexibility offered with a microservice architecture makes it nontrivial to estimate the optimal service instantiation for a given application workload. Further, this problem is exacerbated when considering that these services operate in a dynamic and heterogeneous HPC environment. An optimally integrated service can be vastly more performant than a haphazardly integrated one. Existing performance tools for HPC either fail to understand the request-response model of communication inherent to microservices or they operate within a narrow scope, limiting the insight that can be gleaned from employing them in isolation. We propose a methodology for integrated performance analysis of HPC microservices frameworks and applications called SYMBIOSYS. We describe its design and implementation within the context of the Mochi framework. This integration is achieved by combining distributed callpath profiling and tracing with a performance data exchange strategy that collects fine-grained, low-level metrics from the RPC communication library and network layers. The result is a portable, low-overhead performance analysis setup that provides a holistic profile of the dependencies among microservices and how they interact with the Mochi RPC software stack. Using HEPnOS, a production-quality Mochi data service, we demonstrate the low-overhead operation of SYMBIOSYS at scale and use it to identify the root causes of poorly performing service configurations.

microservices↗