Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ramp forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The Wind Forecast Improvement Project (WFIP). A Public/Private Partnership for Improving Short Term Wind Energy Forecasts and Quantifying the Benefits of Utility Operations -- the Northern Study Area

This report contains the results from research aimed at improving short-range (0-6 hour) hub-height wind forecasts in the NOAA weather forecast models through additional data assimilation and model physics improvements for use in wind energy forecasting. Additional meteorological observing platforms including wind profilers, sodars, and surface stations were deployed for this study by NOAA and DOE, and additional meteorological data at or near wind turbine hub height were provided by South Dakota State University and WindLogics/NextEra Energy Resources over a large geographical area in the U.S. Northern Plains for assimilation into NOAA research weather forecast models. The resulting improvements in wind energy forecasts based on the research weather forecast models (with the additional data assimilation and model physics improvements) were examined in many different ways and compared with wind energy forecasts based on the current operational weather forecast models to quantify the forecast improvements important to power grid system operators and wind plant owners/operators participating in energy markets. Two operational weather forecast models (OP_RUC, OP_RAP) and two research weather forecast models (ESRL_RAP, HRRR) were used as the base wind forecasts for generating several different wind power forecasts for the NextEra Energy wind plants in the study area. Power forecasts were generated from the wind forecasts in a variety of ways, from very simple to quite sophisticated, as they might be used by a wide range of both general users and commercial wind energy forecast vendors. The error characteristics of each of these types of forecasts were examined and quantified using bulk error statistics for both the local wind plant and the system aggregate forecasts. The wind power forecast accuracy was also evaluated separately for high-impact wind energy ramp events. The overall bulk error statistics calculated over the first six hours of the forecasts at both the individual wind plant and at the system-wide aggregate level over the one year study period showed that the research weather model-based power forecasts (all types) had lower overall error rates than the current operational weather model-based power forecasts, both at the individual wind plant level and at the system aggregate level. The bulk error statistics of the various model-based power forecasts were also calculated by season and model runtime/forecast hour as power system operations are more sensitive to wind energy forecast errors during certain times of year and certain times of day. The results showed that there were significant differences in seasonal forecast errors between the various model-based power forecasts. The results from the analysis of the various wind power forecast errors by model runtime and forecast hour showed that the forecast errors were largest during the times of day that have increased significance to power system operators (the overnight hours and the morning/evening boundary layer transition periods), but the research weather model-based power forecasts showed improvement over the operational weather model-based power forecasts at these times.

17 WIND ENERGY↗

Mesoscale Simulations of a Wind Ramping Event for Wind Energy Prediction

Ramping events, or rapid changes of wind speed and wind direction over a short period of time, present challenges to power grid operators in regions with significant penetrations of wind energy in the power grid portfolio. Improved predictions of wind power availability require adequate predictions of the timing of ramping events. For the ramping event investigated here, the Weather Research and Forecasting (WRF) model was run at three horizontal resolutions in 'mesoscale' mode: 8100m, 2700m, and 900m. Two Planetary Boundary Layer (PBL) schemes, the Yonsei University (YSU) and Mellor-Yamada-Janjic (MYJ) schemes, were run at each resolution as well. Simulations were not 'tuned' with nuanced choices of vertical resolution or tuning parameters so that these simulations may be considered 'out-of-the-box' tests of a numerical weather prediction code. Simulations are compared with sodar observations during a wind ramping event at a 'West Coast North America' wind farm. Despite differences in the boundary-layer schemes, no significant differences were observed in the abilities of the schemes to capture the timing of the ramping event. As collaborators have identified, the boundary conditions of these simulations probably dominate the physics of the simulations. They suggest that future investigations into characterization of ramping events employ ensembles of simulations, and that the ensembles include variations of boundary conditions. Furthermore, the failure of these simulations to capture not only the timing of the ramping event but the shape of the wind profile during the ramping event (regardless of its timing) indicates that the set-up and execution of such simulations for wind power forecasting requires skill and tuning of the simulations for a specific site.

17 WIND ENERGY↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use Probabilistic Forecasts in Reliable and Economic Electricity Market Scheduling and Operations

The value of probabilistic forecasts in electricity market operations is being increasingly recognized lately, however, the use is still limited. This study demonstrates two cases of using probabilistic forecasts in scheduling and operations of the California electricity market. We first develop a data-driven method to give weather-informed estimates of ramping reserves based on short-term probabilistic solar irradiance forecasts. By using forecasts across multiple sites, our proposed method presents advantages over the real-world baseline in terms of system reliability and economics. Our second case uses probabilistic hydro power forecasts in the scheduling of a hydro power plant under economic and environmental constraints. By optimizing the bids into both the day-ahead and real-time markets, our results demonstrate considerable economic benefits.

13 HYDRO ENERGY↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Uncertainty-based Estimation of the Secure Range for ISO New England Dynamic Interchange Adjustment

The paper proposes an approach to estimate the secure range for dynamic interchange adjustment, which assists system operators in scheduling the interchange with neighboring control areas. Uncertainties associated with various sources are incorporated. The proposed method is implemented in the dynamic interchange adjustment (DINA) tool developed by Pacific Northwest National Laboratory (PNNL) for ISO New England. Simulation results are used to validate the effectiveness of the proposed method.

forecast errors↗

Probabilistic Day-Ahead Forecasting Using an Analog Ensemble Approach for Wind Farm Grid Services

Wind resource assessment and wind power forecasting are used in research and industry to anticipate future power output at scales ranging from individual wind turbines to entire wind farms. Probabilistic day-ahead wind forecasting is useful for anticipating how a wind farm could potentially participate in the day-ahead market by providing upper and lower bounds for expected power generation, thus informing grid operators of its uncertainty. Understanding this uncertainty is part of a larger project focused on building a platform that combines efforts in weather forecasting, aerodynamic and economic modeling to create maximum value of a wind plant to better provide services to the grid. This effort is also known as the Atmosphere to Electrons to Grid (A2E2G) project. One method for producing a probabilistic forecast is through the analog ensemble approach (Delle Monache et al., 2011). This method leverages historical forecasts and their corresponding observations as a training data set from which future forecasts can be made. For some future forecast, the most similar historical forecasts (analogs) are identified on a regular time basis such as once per a 3-hour window. The most similar analogs, based on a metric such as root mean square error (RMSE), are recorded and their corresponding verifying observations are used as an ensemble member for this future forecast. Prior work in this area demonstrates improvements over raw Numerical Weather Prediction (NWP) forecasts and shows skill similar to techniques such as logistic regression and machine learning (Delle Monache et al., 2013; Alessandrini et al., 2015). Here, we take the High-Resolution Rapid Refresh model (HRRR) day-ahead forecast (0-36 hours) to create a probabilistic day-ahead forecast using an analog ensemble approach. The HRRR has an hourly temporal resolution, with a spatial resolution of 3 km. The 12 UTC HRRR model run is downloaded every day for one year from August 2019 - July 2020, with the first 11 months serving as a bank of analogs from which the forecasting algorithm can create a probabilistic forecast. Once downloaded, the original HRRR forecast is temporally interpolated to 5-minutes, aligning with both the temporal resolution of the observations as well as the timescale relevant for day-ahead power forecasts. The forecast is validated at the M2 tower at the Flatirons Campus of the National Renewable Energy Laboratory (NREL) at a typical wind turbine height of 80 m. Variables such as wind speed, wind direction, and turbulence intensity are incorporated into the probabilistic forecast model and weighted according to their relative importance to the forecast. Based on metrics such as mean bias error (MBE), mean absolute error (MAE), and root mean square error, the analog ensemble forecast outperforms the raw HRRR forecast during the testing period of July 2020. Figure 1 illustrates an example day-ahead forecast compared against the verifying observations. The general variability and ramps are captured throughout the day, with potential to further improve the analog ensemble model through machine learning techniques.

numerical weather prediction↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Balancing Authority Cooperation Concepts to Reduce Variable Generation Integration Costs in the Western Interconnection: Consolidating Balancing Authorities and Sharing Balancing Reserves

The study described in this chapter demonstrates the benefits of BA consolidation with the help of a detailed WECC system model and advanced methodology, which is also described in this chapter. The study aims to determine the potential savings in production cost and reduction in balancing reserve requirements in the WECC system. The study has found that effective use of the diversity in load and variable generation over a wide area can indeed help to achieve significant savings. The implementation cost for the consolidation was beyond the scope of this study. The analysis was performed for two different scenarios of VG penetration: 11% (8% wind and 3% solar) and 33% (24% wind and 9% solar) of WECC projected energy demand in 2020. In analysis of balancing reserves, the objective was to determine the reduction in balancing reserve requirements due to BA consolidation, in terms of required capacity and ramp-rates. Hour-ahead and 10-minute ahead forecast errors for load, wind, and solar were simulated. In addition, 1-minute resolution load, wind and solar data were used to derive balancing reserve requirements i.e. load-following and regulation requirements for each individual BA and for the consolidated BA (CBA). The reduction in balancing reserves was determined by calculating the difference between total reserve requirements that need to be carried by different BAs if they operate individually, and reserve requirements that need to be carried by the CBA. The study results show that the consolidated WECC system would have about a 50% overall reduction in balancing reserves for the 11% penetration scenario and a 65% reduction for the 33% penetration scenario in comparison with total reserve requirements that need to be carried by different BAs if they operate individually.

balancing authorities consolidation↗

A Two-Level Model Predictive Control-Based Approach for Building Energy Management including Photovoltaics, Energy Storage, Solar Forecasting and Building Loads

This paper uses a two-level model predictive control-based approach for the coordinated control and energy management of an integrated system that includes photovoltaic (PV) generation, energy storage, and building loads. Novel features of the proposed local controller include (1) the ability to simultaneously manage building loads and energy storage to achieve different operational objectives such as energy efficiency, economic cost efficiency, demand response and grid optimization through the design of specific power trajectory tracking performance functionals, (2) an energy trim function that minimizes the impact of solar forecasting errors on system performance, and (3) the design of a state of charge controller that uses day-ahead forecast of solar power and building loads to intialize energy storage at the start of each day. The local controller is tested in simulation using an exemplary system with PV generation, energy storage and dispatchable building loads. Two sample days with different PV forecasts and multiple case scenarios are considered, and the performance of the algorithm in managing the real and reactive net building load trajectories and the ramp rate of PV injections into the utility network are evaluated. The simulations are based on actual forecasted and measured PV data, and the results show that the local controller meets the tracking requirements for real and reactive power within the operating constraints of the building.

14 SOLAR ENERGY↗

Energy Storage Sizing Taking Into Account Forecast Uncertainties and Receding Horizon Operation

Energy storage systems (ESS) have the potential to be very beneficial for applications such as reducing the ramping of generators, peak shaving, and balancing not only the variability introduced by renewable energy sources, but also the uncertainty introduced by errors in their forecasts. Optimal usage of storage may result in reduced generation costs and an increased use of renewable energy. However, optimally sizing these devices is a challenging problem. This paper aims to provide the tools to optimally size an ESS under the assumption that it will be operated under a model predictive control scheme and that the forecast of the renewable energy resources include prediction errors. A two-stage stochastic model predictive control is formulated and solved, where the optimal usage of the storage is simultaneously determined along with the optimal generation outputs and size of the storage. Wind forecast errors are taken into account in the optimization problem via probabilistic constraints for which an analytical form is derived. This allows for the stochastic optimization problem to be solved directly, without using sampling-based approaches, and sizing the storage to account not only for a wide range of potential scenarios, but also for a wide range of potential forecast errors. In the proposed formulation, we account for the fact that errors in the forecast affect how the device is operated later in the horizon and that a receding horizon scheme is used in operation to optimally use the available storage.

25 ENERGY STORAGE↗

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task One Report

This is a report for task one of the tail event analysis project for BPA. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, the imbalance between generation and load becomes very significant. This type of events occurs infrequently and appears on the tails of the distribution of system power imbalance; therefore, is referred to as tail events. This report analyzes what happened during the Electric Reliability Council of Texas (ERCOT) reliability event on February 26, 2008, which was widely reported because of the involvement of wind generation. The objective is to identify sources of the problem, solutions to it and potential improvements that can be made to the system. Lessons learned from the analysis include the following: (1) Large mismatch between generation and load can be caused by load forecast error, wind forecast error and generation scheduling control error on traditional generators, or a combination of all of the above; (2) The capability of system balancing resources should be evaluated both in capacity (MW) and in ramp rate (MW/min), and be procured accordingly to meet both requirements. The resources need to be able to cover a range corresponding to the variability of load and wind in the system, additional to other uncertainties; (3) Unexpected ramps caused by load and wind can both become the cause leading to serious issues; (4) A look-ahead tool evaluating system balancing requirement during real-time operations and comparing that with available system resources should be very helpful to system operators in predicting the forthcoming of similar events and planning ahead; and (5) Demand response (only load reduction in ERCOT event) can effectively reduce load-generation mismatch and terminate frequency deviation in an emergency situation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Balancing Needs Assessment Using Advanced Probabilistic Forecasts

This paper presents a comprehensive approach to predict Balancing Authority (BA) regulation and load following requirements in order to improve BA control performance. In this paper the Pacific Northwest National Laboratory’s (PNNL) “ramp and uncertainty prediction tool (RUT) and day-ahead regulation prediction (DARP) tool” were upgraded to incorporate advanced probabilistic forecast information provided by AWS Truepower. The proposed methodology has been tested and validated using actual California Independent System Operator (CAISO) data. Simulation confirmed that integration probabilistic forecast information can reduce the predicted regulation range by about 12-31%. This means that BAs can procure fewer balancing resources without compromising their reliability and control performance requirements.

Regulation, Solar Generation, Wind Generation, Con↗

Integration of Wind Generation and Load Forecast Uncertainties into Power Grid Operations

In this paper, a new approach to evaluate the uncertainty ranges for the required generation performance envelope, including the balancing capacity, ramping capability and ramp duration is presented. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (CAISO) real life data have shown the effectiveness and efficiency of the proposed approach.

17 WIND ENERGY↗

Mesoscale to Microscale Coupling for a Wind Ramp Case over Complex Terrain

Within the wind energy community, it has become increasingly important to simulate realistic weather events at high fidelity in order to improve wind turbine design, wind farm efficiency, and power forecasting. One of the major difficulties in simulating atmospheric events with numerical models at high fidelity is in accurately transitioning from the mesoscale to the microscale. The mesoscale flow, when input into the large-eddy simulation (LES) domain, will be free of resolved turbulence; needing sufficient time and space (known as fetch) for resolved-scale turbulence to develop. In order to reduce this fetch, several methods exist in which the temperature field, wind field, or both, are stochastically perturbed in order to accelerate the generation of turbulence. However, for cases involving complex terrain, it remains unclear if these perturbation processes are necessary, and if the interaction of the flow over the terrain, alone, is sufficient to generate adequate turbulence. In this study, a wind ramp event observed at the National Wind Technology Center (NWTC) outside of Boulder, CO is simulated first with a mesoscale model and then, using the simulated mesoscale solution as initial and boundary conditions, within a microscale LES solver. The mesoscale solution generated by the Weather Research and Forecasting (WRF) model accurately captures the wind ramp event with only a slight temporal shift and a small temperature bias when compared to the meteorological towers in the NWTC site. This information is then taken as the initial and boundary conditions within the Simulator for Wind Farm Applications (SOWFA) microscale LES model with varying terrain inputs. These inputs include the high-resolution (roughly 30 m grid spacing) terrain data from the Shuttle Radar Topography Mission (SRTM) (Figure 1a), as well as, three intermediate terrain resolution data sets produced by applying a uniform convolution window to the SRTM data with varying window sizes (Figure 1b-d). These are compared to the WRF terrain data interpolated to the high-resolution microscale grid (Figure 1e) in order to determine the impact of low-resolution (about 1 km grid spacing) terrain data on turbulence generation. The wind field is compared at several heights and distances along the dominant wind flow axis between each of the terrain cases. It is found that the development of turbulence across the domain is accelerated as terrain information increases in fidelity. Further, because this ramp event at the location of interest is largely influenced by the interaction of the short-wave trough with the terrain, as the topographic information decreases in fidelity the accuracy of the ramp event is decreased. To make generalizations and describe the benefits and shortcomings of this approach, several of the existing perturbation techniques are employed and compared to that of turbulence generation through topographic features.

17 WIND ENERGY↗

Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid (Spanish Version)

This document is the Spanish version of 'Greening the Grid- Forecasting Wind and Solar Generation Improving System Operations'. It discusses improving system operations with forecasting with and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗