Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “quantitative risk assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Compressed Natural Gas Component Leak Frequency Estimation

The frequency of unintended releases in a compressed natural gas system is an important aspect of the system quantitative risk assessment. The frequencies for possible release scenarios, along with engineering models, are utilized to quantify the risks for compressed natural gas facilities. This report documents component leakage frequencies representative of compressed natural gas components that were estimated as a function of the normalized leak size. A Bayesian statistical method was used which results in leak frequency distributions for each component which represent variation and uncertainty in the leak frequency. The analysis shows that there is high uncertainty in the estimated leak frequencies due to sparsity in compressed natural gas data. These leak frequencies may still be useful in compressed natural gas system risk assessments, as long as this high uncertainty is acknowledged and considered appropriately.

03 NATURAL GAS↗

Facilitating Data Collection of Maintenance Events to Populate the Hydrogen Component Reliability Database (HyCReD)

The Hydrogen Component Reliability Database (HyCReD) is a collaborative project between the National Renewable Energy Laboratory, the University of Maryland, and hydrogen stakeholders to improve safety and reliability for hydrogen facilities by implementing component reliability data taxonomies that support hydrogen infrastructure failure rate analysis. The project aims to quantify failure rates of hydrogen components through high-quality data collection and analysis on root causes and maintenance needed. HyCReD provides a common database for cataloging hydrogen component failures which exists for reliability research in many other mature industries [2]. The database fills a gap for the hydrogen community by providing a scientifically rigorous approach to quantitative risk assessment (QRA), prognostic health management (PHM), and reliability-centered maintenance (RCM) analysis. High level results will be aggregated and anonymized to protect company sensitive information; detailed results will be used to help address issues of hydrogen components. These advanced analytics will support accelerated deployment of hydrogen infrastructure by enabling better: design and safety of projects (safety codes and standards development), infrastructure reliability and cost (component failure rates, maintenance protocols), and component R&D needs (robust supply chain). A key to a successful HyCReD implementation is facilitating the ease of reporting and data quality in the database that can be used for analysis. Maintenance data was a previously identified gap in initial efforts to populate and validate the database taxonomies [3]. Collection of maintenance data will be instrumental in identifying failure modes and rates, identifying incipient component failures or reduced performance, cataloging best practices for maintenance routines and methods for prognostic health management, and quantifying the risk and effect of different failure modes. Several key priorities are identified for streamlined data collection to achieve quality and detailed failure data: Applicability, Ease of Use, Accessibility, and Information Security. The HyCReD team has now begun deployment of the database to several companies and groups that have signed non-disclosure agreements to facilitate the data collection of failures in industry hydrogen refueling station infrastructure. This paper will provide an update into the process of HyCReD deployment including the development of a coding guide for facility personnel to reference and ensure data quality and consistency from one station to another as well as implementation of contextually dependent data fields of system taxonomy and formatted entries to provide ease of use. The goal is to communicate the lessons learned from the roll-out to technicians and engineers in the field, and the addition of need for high level of security to protect all stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Overview of International Activities in Hydrogen System Safety in IEA Hydrogen TCP Task 43

Safety and reliability have long been recognized as key issues for the development, commercialization, and implementation of new technologies and infrastructure, and hydrogen systems are no exception to this rule. Reliability engineering, quantitative risk assessment (QRA), and knowledge exchange each play a key role in proactive addressing safety - before problems happen - and help us learn from problems if they happen. Many international research activities are focusing on both reliability and risk assessment for hydrogen systems. However, the element of knowledge exchange is sometimes less visible. To support international collaboration and knowledge exchange, the International Energy Agency (IEA) convened a new Technology Collaboration Program, "Task 43: Safety and Regulatory Aspects of Emerging Large Scale Hydrogen Energy Applications" started in June 2022. Within Task 43, Subtask E focuses on Hydrogen Systems Safety. This paper discusses the structure of the Hydrogen Systems Safety subtask and the aligned activities and introduces opportunities for future work.

HYDROGEN↗

Physics-informed machine learning for fault-leakage reduced-order modeling

Geologic carbon storage (GCS) is a promising technology for mitigating CO 2 emissions. The overall success of GCS depends on safe operations that are informed by risk assessment and have proper mitigation plans in place. Performing quantitative probabilistic risk assessment for a GCS site using traditional reservoir simulators can be challenging due to the high computational costs. To overcome this challenge, the US Department of Energy’s National Risk Assessment Partnership (NRAP) project has developed an integrated assessment modeling approach that utilizes computationally efficient reduced-order models (ROM) for simulating various parts of a GCS storage site to quantify uncertainty. Here, in this study, we develop a reduced-order model for fault leakage risk assessment. We use a deep learning approach to build the reduced-order model. We perform a sensitivity analysis and find that the deep learning model yields high accuracy with a much smaller computational cost than full-physics simulation. We also evaluate the performance of the model in scenarios where simulations are not possible to run, providing analysis not previously performed in fault-leakage ROM analyses. Based on a sensitivity analysis of the model, we suggest a simplified conceptual model for fault leakage and site monitoring.

58 GEOSCIENCES↗

Quantitative assessment of distant recurrence risk in early stage breast cancer using a nonlinear combination of pathological, clinical and imaging variables

Abstract Use of genomic assays to determine distant recurrence risk in patients with early stage breast cancer has expanded and is now included in the American Joint Committee on Cancer staging manual. Algorithmic alternatives using standard clinical and pathology information may provide equivalent benefit in settings where genomic tests, such as OncotypeDx, are unavailable. We developed an artificial neural network (ANN) model to nonlinearly estimate risk of distant cancer recurrence. In addition to clinical and pathological variables, we enhanced our model using intraoperatively determined global mammographic breast density (MBD) and local breast density (LBD). LBD was measured with optical spectral imaging capable of sensing regional concentrations of tissue constituents. A cohort of 56 ER+ patients with an OncotypeDx score was evaluated. We demonstrated that combining MBD/LBD measurements with clinical and pathological variables improves distant recurrence risk prediction accuracy, with high correlation ( r = 0.98) to the OncotypeDx recurrence score.

Nichols, Brandon S.↗

Metagenomic Methods for Addressing NASA's Planetary Protection Policy Requirements on Future Missions: A Workshop Report

Molecular biology methods and technologies have advanced substantially over the past decade. These new molecular methods should be incorporated among the standard tools of planetary protection (PP) and could be validated for incorporation by 2026. To address the feasibility of applying modern molecular techniques to such an application, NASA conducted a technology workshop with private industry partners, academics, and government agency stakeholders, along with NASA staff and contractors. The technical discussions and presentations of the Multi-Mission Metagenomics Technology Development Workshop focused on modernizing and supplementing the current PP assays. The goals of the workshop were to assess the state of metagenomics and other advanced molecular techniques in the context of providing a validated framework to supplement the bacterial endospore-based NASA Standard Assay and to identify knowledge and technology gaps. In particular, workshop participants were tasked with discussing metagenomics as a stand-alone technology to provide rapid and comprehensive analysis of total nucleic acids and viable microorganisms on spacecraft surfaces, thereby allowing for the development of tailored and cost-effective microbial reduction plans for each hardware item on a spacecraft. Workshop participants recommended metagenomics approaches as the only data source that can adequately feed into quantitative microbial risk assessment models for evaluating the risk of forward (exploring extraterrestrial planet) and back (Earth harmful biological) contamination. Participants were unanimous that a metagenomics workflow, in tandem with rapid targeted quantitative (digital) PCR, represents a revolutionary advance over existing methods for the assessment of microbial bioburden on spacecraft surfaces. The workshop highlighted low biomass sampling, reagent contamination, and inconsistent bioinformatics data analysis as key areas for technology development. Finally, it was concluded that implementing metagenomics as an additional workflow for addressing concerns of NASA's robotic mission will represent a dramatic improvement in technology advancement for PP and will benefit future missions where mission success is affected by backward and forward contamination.

59 BASIC BIOLOGICAL SCIENCES↗

Cyber risk assessment and investment optimization using game theory and ML-based anomaly detection and mitigation for wide-area control in smart grids

The electric power grid is increasingly becoming susceptible to cyber attacks that exploit vulnerabilities in the smart grid control, information, and physical layers. Successful cyber attacks can have catastrophic impacts on the social and economic well-being of any nation all over the globe. It has, thus, become imperative to secure the smart grid against such adversarial actions to ensure stable, secure, and reliable operation of the grid. The existing research and industry practices prove to be inadequate in terms of providing pragmatic and effective defense methodologies and measures for long-term cybersecurity planning and real-time cybersecurity for grid operation. For example, existing works lack models that incorporate uncertain behavior of cyber-attackers and pragmatic defense measures for cyber risk assessment and cybersecurity investment optimization which often provide unreliable and strictly qualitative solutions to these problems. At the same time, with the growing number of cyber incidents in the grid, there still exists a need to develop attack-resilient algorithms for wide-area monitoring, protection, and control (WAMPAC) applications like the wide-area voltage control systems (WAVCS) for Flexible AC Transmissions Systems (FACTS) that lack in scalable and feasible solutions from the cybersecurity perspective. This dissertation proposes novel models and methodologies for: (1) Cybersecurity planning, and (2) Cybersecurity for system operation. The cybersecurity planning is achieved through cyber risk assessment and cybersecurity resource investment optimization for long-term cybersecurity of the grid using game theory and attack-defense trees. Cybersecurity for system operation consists of development of cyber anomaly detection and mitigation algorithms for flexible AC transmission system (FACTS) controller-based wide-area voltage control systems (WAVCS) using machine learning (ML), and software defined networking-based moving target defense network routing for achieving real-time cyber-physical security for grid operations. This is followed by hardware-in-the-loop (HIL) implementation and evaluation of these attack prevention, detection, and mitigation algorithms and methodologies showcasing their feasibility in a close to real-world environment. For cybersecurity planning, a novel approach involving a combination of game theory and attack defense trees (ADT) for optimal cybersecurity resource allocation in the smart grid is proposed. This methodology involves modeling of the cyber-physical smart grid substations as ADTs, defining attacker costs, defense costs, and attack probabilities for attack access points. Using game theoretical formulation, optimal defense strategies for the defender of the system to invest cybersecurity resources in the grid are obtained. Additionally, a game-theoretic framework is developed for quantitative cyber-physical risk assessment of the grid under a dynamically changing cyber threat space and uncertain behavior of cyber attackers which is further used to optimize investments in the smart grid's cybersecurity resources. The attacker, defender, and the smart grid system are modeled while incorporating attacker-stochasticity and federal guidelines for smart grid cybersecurity. This allows quantification of threat, vulnerabilities, and attack impact of the grid for quantitative risk assessment. The defender's budget to invest in the security resources in the grid is optimized based on the strategies leading to minimum system risk. The evaluation of the proposed solutions highlight the feasibility for practical implementation of these methodologies and algorithms in the smart grid, while taking the federal requirements and guidelines for smart grid security into consideration. For achieving cybersecurity for system operation, attack prevention, detection, and mitigation algorithms and methodologies are developed specifically for FACTS-based WAVCS. Anomaly detection and mitigation in the WAVCS are achieved using algorithms based on machine learning which involves offline training and testing of ML models with CPS datasets incorporating physics-based features that allow accurate distinction between system faults and cyber attacks. For attack prevention, a methodology based on software defined network (SDN)-based moving target defense (MTD) network routing is proposed that enables prevention of Denial of Service (DoS) type attacks on the smart grid communication system. Subsequently, these methodologies and algorithms are implemented and evaluated on an HIL testbed that allows for real-time attack prevention, detection, and mitigation of emulated cyber attacks on the WAVCS in a close to real-world environment. The results show highly accurate and efficient performance of the implemented algorithms and methodologies with the smart grid system operating within the NERC's system operation limits even in the presence of DoS and data integrity cyber attacks. This work opens up future research opportunities in other directions such as (1) Expanding cybersecurity planning methodologies to real-time cyber contingency analysis with different game formulations; and (2) Applying the cybersecurity for system operation algorithms to broader categories of wide-area control applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

Component Reliability

An overview of the National Renewable Energy Laboratories Component Reliability Project including the accomplishments for the previous year.

component reliability↗

Milestone Report for MS8: Extend Quantitative Brine and CO 2 Leakage Calculations

This report summarizes results of the risk analysis and characterization of CO 2 and brine leakage potential of Farnsworth Unit (FWU) wells. U.S. DOE’s National Risk Assessment Partnership (NRAP) program works on quantitatively assess long-term environmental risks amidst significant geologic uncertainty and variability. NRAP risk assessment and computational tools are developed to quantify uncertainties and calculate risk associated with geologic sequestration of carbon dioxide (CO 2 ). For this study, we have developed a workflow from University of Utah’s physics-based reservoir simulators to performing leakage calculations using NRAP Tools. NRAP tools (NRAP-IAM-CS, RROM-Gen) are used to conduct leakage risk analysis based on Eclipse simulation results, and characterize wellbore leakage at the Farnworth Site. This report summarizes results of the risk analysis and characterization of CO 2 and brine leakage potential of Farnsworth Unit (FWU) wells.

54 ENVIRONMENTAL SCIENCES↗

Sustaining On-going Risk Communication at the Riverton, Wyoming, Processing Site - 20310

An environmental risk assessment report has been completed to provide an updated assessment regarding current site conditions for the Riverton, Wyoming, Processing site. Argonne National Laboratory conducted the assessment in collaboration with the U.S Department of Energy (DOE) Office of Legacy Management (LM) and the Northern Arapaho Natural Resources Office (NANRO). The data quality objectives process conducted confirmed that data from plants growing on the Riverton site would be useful and would address an outstanding concern. Data available from site soil, groundwater, and surface water were also used in the assessment in conjunction with the new plant data. A plant survey was then conducted in 2018 to identify the plants at the Riverton site with known traditional Native American cultural uses for sampling and analysis. Laboratory analysis was conducted on the plant samples for the contaminants of concern. Samples were collected from plants growing on the groundwater plume area of the site, and the same was done for eight other areas not affected by the groundwater plume but still within the institutional control boundary. These eight areas served as reference areas for this study. This human health and ecological assessment update provide the quantitative risk information that was qualitatively addressed in a 1995 Risk Assessment Report on plants, livestock, and surface water exposures at the Riverton site [1]. The conditions at the Riverton site are protective of human health and the environment given the results of the update, in combination with past completed remedial action and ongoing monitoring activities and IC implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydropower Cybersecurity Risk Management and Valuation

Advancements to DOE WPTO funded Hydropower Cybersecurity Value-at-Risk Framework application allows stakeholder to translate risk-based assessments to quantitative scores allowing to better decision making for cybersecurity investments.

13 HYDRO ENERGY↗

Bio-project “derisking” through development of systematic methodologies and frameworks for risk assessment

One of the primary hindrances to producing a viable, sustainable domestic biomass industry for renewable biofuels, bio-products and bio-power is the lack of understanding and quantification of the risks associated with both the biomass supply chain and preprocessing and conversion technologies. Currently a consistent method for assessing, comparing, and quantifying risks in biomass supply chains does not exist, creating a major investment barrier to bioenergy projects in the U.S. The lack of a standardized approach has resulted in bioenergy stakeholders independently using inconsistent approaches and evaluation criteria, leading to unreliable and incomparable assessments of risks and financing barriers to bio-project development. Along with the challenges of inconsistent risk assessment for supply chain risk, technology specific risks based on variability in biomass properties are not fully understood and can pose significant unforeseen challenges for bioenergy projects. In many cases these properties have not yet been identified and the impacts on the proposed technology and products unquantified. This is particularly challenging for emerging preprocessing and conversion technologies. Without a firm understanding of the preprocessing/conversion technology-specific critical properties, the risk of a proposed bio-project cannot be fully evaluated. To address inconsistent risk evaluation in the biomass supply chain supporting project financing, a Biomass Supply Chain Risk Standards (BSCRS) framework was developed. The BSCRS framework includes a comprehensive list of known and perceived risks (Risk Indicators) to the supply chain developed through 100’s of interviews with bioenergy industry experts spanning from feedstock growers and suppliers to representatives from the financial sector. These risks have been organized into a manageable hierarchy of Risk Categories and Risk Factors that can be practically assessed. This BSCRS framework also provides mitigation strategies for multiple Risk Indicators from best available industry practices and research findings. Additionally, a risk quantification methodology for each Risk Factor, Risk Category, and the bio-project as a whole was developed to enable capital markets to assess feedstock risk more efficiently and more accurately. Multiple case studies representing existing bio-projects have been used to evaluate and verify the BSCRS framework and scoring methodology. To address technological risk along with the supply chain risk captured in the developed BSCRS framework, this work also focuses on development of a systematic criticality assessment tool using well-accepted, quantitative risk analysis methods to evaluate bioenergy feedstock critical properties impacting system unit operations. The proposed Failure Mode and Effect Analysis (FMEA) approach uses a team of subject area experts (SAEs) for each targeted unit operation within a system. Collectively, the team will develop and use a quantitative scoring system to assess the material attributes, process parameters, and quality attributes for key unit operations that have already been identified. The FMEA process generates Risk Priority Numbers (RPNs) for the various failures and predominant causes for each material/process unit/product combination resulting in a semi-quantitative, standardized methodology for assessing technological risk and biomass properties contributing to that risk.

09 BIOMASS FUELS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Integrating Qualitative and Quantitative Aspects of Risk Management

This topical report summarizes the integration of qualitative and quantitative aspects of the risk management workflow for the Southwest Regional Partnership on Carbon Sequestration (SWP) Phase III Demonstration Project, located near the community of Farnsworth in northernmost Texas. Detail on some aspects of this subject has been previously provided in internal project reports on qualitative risk assessment processes, in a published paper summarizing quantitative risk modeling, and in many other published papers on specific risk modeling efforts. These prior documents are cited but the details are not repeated here. The report documents work undertaken for Task 7.4.1 of U.S. Department of Energy award number DE- FC26-05NT42591.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantitative evaluation of common cause failures in high safety-significant safety-related digital instrumentation and control systems in nuclear power plants

Digital instrumentation and control (DI&C) systems at nuclear power plants (NPPs) have many advantages over analog systems. They are proven to be more reliable, cheaper, and easier to maintain given obsolescence of analog components. However, they also pose new engineering and technical challenges, such as possibility of common cause failures (CCFs) unique to digital systems. Here this paper proposes a Platform for Risk Assessment of DI&C (PRADIC) that is developed by Idaho National Laboratory (INL). A methodology for evaluation of software CCFs in high safety-significant safety-related DI&C systems of NPPs was developed as part of the framework. The framework integrates three stages of a typical risk assessment—qualitative hazard analysis and quantitative reliability and consequence analyses. The quantified risks compared with respective acceptance criteria provide valuable insights for system architecture alternatives allowing design optimization in terms of risk reduction and cost savings. A comprehensive case study performed to demonstrate the framework's capabilities is documented here in this paper. Results show that the PRADIC is a powerful tool capable to identify potential digital-based CCFs, estimate their probabilities, and evaluate their impacts on system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Legacy Well Leakage Risk Analysis at the Farnsworth Unit Site

This paper summarizes the results of the risk analysis and characterization of the CO 2 and brine leakage potential of Farnsworth Unit (FWU) site wells. The study is part of the U.S. DOE’s National Risk Assessment Partnership (NRAP) program, which aims to quantitatively evaluate long-term environmental risks under conditions of significant geologic uncertainty and variability. To achieve this, NRAP utilizes risk assessment and computational tools specifically designed to quantify uncertainties and calculate the risk associated with geologic carbon dioxide (CO 2 ) sequestration. For this study, we have developed a workflow that utilizes physics-based reservoir simulation results as input to perform leakage calculations using NRAP Tools, specifically NRAP-IAM-CS and RROM-Gen. These tools enable us to conduct leakage risk analysis based on ECLIPSE reservoir simulation results and to characterize wellbore leakage at the Farnsworth Unit Site. We analyze the risk of leakage from both individual wells and the entire field under various wellbore integrity distribution scenarios. The results of the risk analysis for the leakage potential of FWU wells indicate that, when compared to the total amount of CO 2 injected, the highest cemented well integrity distribution scenario (FutureGen high flow rate) exhibits approximately 0.01% cumulative CO 2 leakage for a 25-year CO 2 injection duration at the end of a 50-year post-injection monitoring period. In contrast, the highest possible leakage scenario (open well) shows approximately 0.1% cumulative CO 2 leakage over the same time frame.

54 ENVIRONMENTAL SCIENCES↗