Control Co-Design Framework for Joint Optimization of PID Governor and Hydraulic Dynamics for a Hydropower Plant

This paper presents a control co-design (CCD) framework tailored to the hydraulic and mechanical subsystems of hydropower systems, aimed at enhancing their dynamic performance and responsiveness to grid demands. Conventional sequential design approaches often fall short in capturing the coupled interactions between plant dynamics and control objectives. The proposed CCD methodology enables simultaneous optimization of key hydro plant parameters - such as governor settings, penstock characteristics, and valve control - with the control system architecture. Results indicate that both CCD and sequential design approaches achieve comparable transient and steady-state performance, with minor discrepancies arising from differences in their optimized parameters. However, CCD demonstrates a distinct advantage by tripling the water time constant (Tw) while maintaining similar dynamic performance to the sequential approach. This increase in Tw enables optimization of penstock dimensions, as it is directly influenced by penstock design, thereby contributing to overall cost optimization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges and Opportunities for Basic Efficiency Measures in Low-Income Homes: A Southeast Alaska Case Study

Juneau, Alaska, is the state's capital city and aims to reach 80% renewable energy for the space heating and transportation sectors by 2045. This goal highlights a need to electrify both sectors to take advantage of the inexpensive hydropower available from the local electric utility, Alaska Electric Light and Power. To that end, researchers examined the feasibility of deploying storm windows via a case study of installing storm windows in two local low-income homes. Newer models of storm windows provide an extra layer of insulation over existing windows while preserving operability and views. They can also improve comfort and reduce noise. In addition to conducting pre- and post-installation air leakage tests, energy monitoring, and occupant interviews, researchers worked with the regional housing authority and a local builder to install the storm windows and replace inoperable windows in the two houses in 2021. The team encountered several challenges, including a lack of egress windows, energy data from a wide variety of heating systems, extremely leaky homes, and installation issues, such as windows that were not square. These results point to several barriers to the widespread deployment of window upgrades in the area and open the door to opportunities to design deployment programs that improve safety and efficiency.

cold climate↗

Challenges and Opportunities for Basic Efficiency Measures in Low-Income Homes: A Southeast Alaska Case Study

Juneau, Alaska is the state's capital city and has a renewable energy goal to reach 80% renewable energy for the space heating and transportation sectors by 2045. In practical terms, this indicates a need to electrify both sectors, to take advantage of the inexpensive hydropower available from the local electric utility, Alaska Energy Light & Power. In an effort to complement and enable electrification, researchers examined the feasibility to deploy storm windows via a case study of installing storm windows in two local low-income homes. Newer models of storm windows provide an extra layer of insulation over existing windows, while preserving operability and views. They can also improve comfort and reduce noise. Researchers worked with the regional housing authority and a local builder to install the storm windows and replace inoperable windows in the two houses in 2021, in addition to conducting pre- and post-installation air leakage tests, energy monitoring, and occupant interviews. The team encountered several challenges, including a lack of egress windows, energy data from a wide variety of heating systems, extremely leaky homes, and installation issues such as windows that were not square. These results point to several barriers to widespread deployment of storm windows in the area, but also open the door to opportunities to design deployment programs that improve safety as well as efficiency.

cold climate↗