Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pumped, storage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Secured Reserve Scheduling of Pumped-Storage Hydropower Plants in ISO Day-ahead Market

Due to the fast response ability and high ramping rates, pumped-storage hydropower (PSH) plants are playing an increasingly critical role in mitigating power generation fluctuations induced by the growing proliferation of renewable energy resources. However, because they are energy-limited resources, actual reserve deployment from PSHs would cause the deviation of state-of-charge (SOC) from the scheduled value, which, once accumulated over time, could induce potential violations on SOC limits and cause non-dispatchability of PSHs. In recognizing this potential issue, it can become important to securing the reserve schedule of PSHs and other energy limited resources preventively in the day-ahead market clearing. To ensure reserve dispatchability of PSHs despite SOC deviations, this paper proposes the reserve secure constraints, which are cast as a distributionally robust chance-constrained formulation by judiciously introducing random parameters to describe deployment ratios of scheduled regulation reserve from PSHs. Furthermore, these constraints are converted into tractable second-order cone constraints, and further approximated as linear constraints to be compatible with the current ISO day-ahead market clearing model. A modified IEEE 118-bus system with multiple PSHs is adopted to verify the proposed approach.

13 HYDRO ENERGY↗

Large Scale Pumped Storage to Support Renewable Deployment; PSH Resource Assessment and Complementary Analysis for Alaska

The State of Alaska has a rather unique electric power system, as it has two larger transmission grids (Railbelt and Southeast Alaska) and over 150 islanded stand-alone power systems that are serving remote rural communities. In 2010, the Alaska legislature enacted a non-binding goal for 50% of renewable electricity generation by 2025. With the expected increase in wind and solar generation in the future, the role of energy storage becomes increasingly important. Considering the specific power system characteristics in Alaska, energy storage technologies that can supply electricity over an extended period of time, such as pumped storage hydropower (PSH), may play a key role in enabling the reliability and resiliency of both integrated and rural power systems. The overarching objective of the subject study of this presentation is to investigate the prospects and opportunities for PSH in Alaska.

Alaska↗

Opportunities for Pumped Storage Hydropower under the Inflation Reduction Act [Slides]

The Inflation Reduction Act (IRA) creates significant incentives for clean energy technologies including pumped storage hydropower (PSH). The investment tax credit (ITC) is expected to sunset in 2033 (or later). This decade-long window of opportunity can accommodate the lead times typically necessary for developing PSH. The ITC for PSH likely ranges from 6%-50%. Portions of the ITC are spatially dependent. 22 states have the potential for deployment of PSH at a feasible site with the maximum ITC of 50%, based on currently defined areas under the energy community tax credit bonus. Regions including the central Rockies, Appalachia and the California-Nevada border have especially high combined potential for site feasibility and ITC.

13 HYDRO ENERGY↗

Nonexhaustive Taxonomy of Hydropower and Pumped Storage Hydro Facilities [Slides]

The National Renewable Energy Laboratory (NREL) has published benchmark technical reports and presentations that disaggregate major product components for a variety of technologies, including land-based and offshore wind, photovoltaic, and battery energy storage systems. NREL has partnered with staff from the Pacific Northwest National Laboratory (PNNL) and members of the U.S. Department of Energy's Water Power Technology Office (WPTO) to create a non-exhaustive taxonomy of the major products and components of hydropower and pumped storage systems.

13 HYDRO ENERGY↗

Cost Estimation of a Permanent Magnet Synchronous Machine for Use in Adjustable Speed-Pumped Storage Hydropower

Electric machine design has become an easier process with the availability of computers in recent decades. However, the interest in electric machine design among students has declined. University-level design courses must compete with courses perceived as more desirable by the potential job market. Hence, the power system engineers with this expertise are very few and are nearing retirement. Contrarily, renewable energy has been picking up in the past few decades. The indeterminacy and variation of renewable energy sources require a balancing mechanism to maintain the constant voltage and frequency of the grid. Adjustable-Speed Pumped-Storage Hydropower plants are considered the contender for future energy storage, providing large capacity and fast-acting response. Large-scale hydropower applications depend on the natural characteristics of each project site, making less expensive, off-the-shelf generators unfeasible. This work gives a shortcut to estimate the cost of constructing a permanent magnet generator for low-volume manufacturing.

13 HYDRO ENERGY↗

Challenges and Opportunities for Electric Utility Modeling and Asset Valuation Frameworks: Case Study on Valuing New Pumped Storage Hydropower

Asset valuation by electric utilities is becoming increasingly difficult in the rapidly changing electric sector. Rapid deployment of variable generation and inverter-based storage systems along with uncertain demand growth, climate, policies, and other factors create a challenging environment for understanding the value proposition of a new potential asset. This report describes an effort between the Tennessee Valley Authority (TVA) and three U.S. Department of Energy laboratories to perform a detailed review of utility modeling and analysis practices for asset valuation and identify challenges and opportunities for advancing its methods into the future. It focuses on a case study of new potential pumped storage hydropower (PSH) because of growing interest in new PSH capacity to provide energy balancing, firm capacity, and a range of ancillary services. Staff from the DOE labs conducted systematic interviews about current practices in capacity expansion modeling, production-cost modeling, hydrological modeling, and transmission stability modeling while also discussing how scenario analysis is conducted and how models and data are integrated. The effort resulted in a set of model, integration, and scenario recommendations that could be valuable to TVA, other utilities, system operators, and other stakeholders conducting integrated grid analysis. Individual model recommendations suggest exploring computational tradeoffs with detail and resolution across spatiotemporal structure, supply- and demand-side details, transmission overlays, market interactions, and ancillary services. Automated processes to pass data between models and conduct larger scenario suites could also enhance valuation practices by enabling a more consistent study of asset value across a broader range of uncertain future grid conditions where PSH could be particularly valuable. TVA and other industry stakeholders can learn from and adapt applied research-grade methods developed by DOE laboratories and other research institutions to improve decision making and accelerate progress towards a reliable, economic, sustainable energy system.

13 HYDRO ENERGY↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report was developed in tandem with the Furthering Advancements to Shorten Time (FAST) to Commissioning PSH Challenge and represents the underlying technical analysis that informed the competition. Lead by Oak Ridge National Laboratory, the report is designed to address barriers and solutions to PSH development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. The document’s scope includes post-licensing activities and excludes factors related to permitting or licensing.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (CRADA Final Report)

NREL initiated a prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, Southwest Research Institute (SWRI) was chosen as one of nine finalists to develop their concept in advance of the FAST Prize Pitch Contest held on October 27, 2021. The National Labs provided technical and business advisement to SWRI in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (Penn State-PNNL): Cooperative Research and Development Final Report, CRADA Number CRD-19-00842

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development, CRADA Number CRD-19-00837 (Final Report)

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

Update on Model Specification Development of Ternary Pumped Storage Technologies [Slides]

T-PSH is an innovative structure of C-PSH that features two turbines, one for pumping and one for generation, replacing the single turbine in C-PSH. These turbines are housed in separate chambers, with an additional set of penstocks connecting the pump turbine to the hydraulic system. This structure enables T-PSH to operate in an HSC mode, allowing for simultaneous pumping and generation, which provides greater operational flexibility compared to C-PSH. To model T-PSH's HSC mode, a user defined turbine and governor system model is required, including the shared penstock model and additional pump turbine model. This specification will focus on the details of the user-defined turbine and governor model, which leverages the HYGOV model.

16 TIDAL AND WAVE POWER↗