Direct Feed Low Activity Waste (DFLAW) Program: Development, Progression and Risk Management - 16476

This Direct Feed Low-Activity Waste (DFLAW) Program paper describes the key programmatic elements to enable the startup of treatment and disposal of Hanford tank waste through a phased startup of the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Specifically the DFLAW Program consists of the Low- Activity Waste (LAW) vitrification facility, and the direct feed to LAW of treated tank farm supernatant from the Low-Activity Waste Pretreatment System (LAWPS). This document identifies the overall strategy, objectives, and processes of the U.S. Department of Energy (DOE), Office of River Protection (ORP) and all supporting DOE subcontractors, and describes the scope of the program elements. In addition gaps, risks, and opportunities to successful integration for commissioning of all needed systems and facilities to produce immobilized LAW product (ILAW) are described. The scope of the DFLAW Program extends up to the point that LAW Facility hot commissioning is complete and all DFLAW systems are fully operational. The DFLAW Program coordinates, integrates, and monitors all the activities necessary to successfully commission and start up the WTP LAW facility. This involves integrating the readiness of all the plant, personnel and program/procedures that support startup of hot commissioning of tank farms systems, WTP systems, waste treatment and disposal systems, and site utility, infrastructure and services. Multiple Hanford contractors have responsibilities to execute and perform scope under the umbrella of the DFLAW Program. The primary focus of the One System organization, comprised of WTP Project and Tank Operations Contract (TOC) personnel, is to manage the coordination and integration across the interfaces of the work scope described above. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Plug-and-Play Interchangeable Components for Unmanned Aerial System with Mobile Manipulation Capability

The safe cleanup of the environmental legacy brought about from decades of nuclear weapons development and government-sponsored nuclear energy research is of vital importance. The sites of U.S. Department of Energy hold 6.5 trillion liters of contaminated groundwater and 40 million cubic meters of soil and debris contaminated with radionuclides, metals, and organics. The deactivation and decommissioning process (D and D) involves conversion of active, excess, and/or abandoned facilities to a final disposition. Because of residual radioactivity and dangerous chemicals, and the physical condition of these facilities, D and D presents unique hazards that must be addressed from safety, environmental, programmatic, and technological standpoints. This problem calls for development of informed D and D strategies including in-situ decommissioning, efficacy of D and D operations, productivity and personnel safety of D and D operation, facilitation of acceptable facility end-states, and independent verification. To identify and address D and D risks and challenges, innovative applications and timely insertion of existing commercially available technologies, processes and robotics or remote hardware are necessary. Aerial robotic unmanned autonomous systems (UAS) enable remote sensing operations. To address the needs of UAS-based sensing and sampling applications, we are developing plug-and-play interchangeable components for integration into the UAS: a neutron/gamma radiation sensor, a gas sensor for detection of vapors in air, and a miniature manipulator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Carbon Capture and Sequestration (via Enhanced Oil Recovery) from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE’s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.

03 NATURAL GAS↗

Metal Additive Manufacturing for Rocket Engines: Successes and Failures

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

L-PBF↗

Successes and Failures of Metal Additive Manufacturing for Rocket Engines

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

Additive Manufacturing↗

Dexterity test data contribute to proper glovebox over-glove use

Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA-55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through the use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). The glovebox gloves are the weakest part of this engineering control. The Glovebox Glove Integrity Program, which controls glovebox gloves from procurement to disposal at TA-55, manages this vulnerability. A key element of this program is to consider measures that lower the overall risk of glovebox operations. Proper selection of over-gloves is one of these measures. Line management owning glovebox processes have the responsibility to approve the appropriate personal protective equipment/glovebox glove/over-glove combination. As low as reasonably achievable (ALARA) considerations to prevent unplanned glovebox glove openings must be balanced with glove durability and worker dexterity, both of which affect the final overall risk to the worker. In this study, the causes of unplanned glovebox glove openings, the benefits of over-glove features, the effect of over-gloves on task performance using standard dexterity tests, the pollution prevention benefits, and the recommended over-gloves for a task are presented.

57↗

Integrated Risk and Knowledge Management Program -- IRKM-P

The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

Lengyel, David M.↗

James Webb Space Telescope - Applying Lessons Learned to I&T

The James Webb Space Telescope (JWST) is part of a new generation of spacecraft acquiring large data volumes from remote regions in space. To support a mission such as the JWST, it is imperative that lessons learned from the development of previous missions such as the Hubble Space Telescope and the Earth Observing System mission set be applied throughout the development and operational lifecycles. One example of a key lesson that should be applied is that core components, such as the command and telemetry system and the project database, should be developed early, used throughout development and testing, and evolved into the operational system. The purpose of applying lessons learned is to reap benefits in programmatic or technical parameters such as risk reduction, end product quality, cost efficiency, and schedule optimization. In the cited example, the early development and use of the operational command and telemetry system as well as the establishment of the intended operational database will allow these components to be used by the developers of various spacecraft components such that development, testing, and operations will all use the same core components. This will reduce risk through the elimination of transitions between development and operational components and improve end product quality by extending the verification of those components through continual use. This paper will discuss key lessons learned that have been or are being applied to the JWST Ground Segment integration and test program.

Johns, Alan↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems

In late fiscal year 2020, the Space Nuclear Propulsion (SNP) project began the process of formulating an investment strategy to support development of the technologies required for a high-power (megawatt-class) nuclear electric propulsion (NEP) system capable of performing human-scale missions. This activity was initiated concurrent with several high-level studies and assessments were either under way or had just concluded. Studies of human-scale Mars missions have been performed several times over the past two decades. One of the most recent studies examined opposition-class human Mars missions to occur in the late 2030s timeframe [1,2]. The mission architecture assumed a hybrid NEP/chem-propelled vehicle that used a high specific impulse (Isp) NEP-system and a liquid oxygen (LOx)-liquid methane high thrust chemical stage (two 110 kN (25 klbf) thrust, 365 s Isp engines) for maneuvers performed to enter and exit gravity wells. Trajectory analyses performed in this study showed that such a mission could be performed with 2-4 MWe directed into the electric propulsion system (operating for 20,000+ hours), with the large range representing different opposition-class Mars mission opportunities and permutations on the trajectory design, concept of operations, and technology choices. In 2020, the NASA Engineering and Safety Center (NESC) performed a study to evaluate the maturity of the different technologies required for nuclear propulsion systems [3]. The executive summary of this report provided the following top-level conclusions: • “The majority of critical technologies for… NEP/Chem… systems are relatively immature” • “TRLs [technology readiness levels] in the literature are often overestimated” • “The majority of critical technologies… for NEP/Chem… systems are at a relatively high level of advancement degree of difficulty (AD2 > 4) for maturation, requiring a dual development approach” • “The proper assessment of baseline TRL and AD2 values and the estimation of requirements and resources required for advancement have been consistent issues for NEP,” • “Non-advocate reviews should occur at the start of a technology program and at all key milestones.” In 2021, the National Academies of Science, Engineering, and Medicine (NASEM) issued a separate report [4] identifying the “primary technical and programmatic challenges, merits, and risks for maturing space nuclear propulsion technologies of interest to a future human Mars exploration mission.” That work contained several important findings, including: • “Developing a MWe-class NEP system for the baseline mission would require increasing power by orders of magnitude relative to NEP system flight- or ground-based technology demonstrations completed to date.” • “Subscale in-space flight testing of NEP systems cannot address many of the risks and potential failure modes associated with the baseline mission NEP system. With sufficient M&S [modeling & simulation] and ground testing, including modular subsystem tests at full scale and power, flight qualification requirements can be met by the cargo missions that will precede the first crewed mission to Mars. Fully integrated ground testing may not be required.” • “As a result of low and intermittent investment over the past several decades, it is unclear if even an aggressive program would be able to develop an NEP system capable of executing the baseline mission in 2039.” These efforts motivated the SNP project to investigate the technologies available for a megawatt-class high power nuclear electric propulsion system. That system is illustrated schematically in Figure 1 and is comprised of five separate top-level critical technology elements (CTEs). 1. Nuclear Reactor – Thermal power source for the system, utilizing high-assay low enriched uranium (HALEU) as the nuclear fuel. Reactor radiation shielding is also included in this CTE. 2. Power Conversion – Operates as a thermodynamic cycle, accepting nuclear reactor thermal power as an input and converting it to mechanical power. 3. Power Management and Distribution (PMAD) – Accepts as an input mechanical power from the power conversion system, which is used to generate electrical power. The PMAD system also distributes the generated electrical power to all other parts of the spacecraft, including the high-power EP system. The PMAD system may also perform duties such as isolation, fault detection, and power transformation/rectification for different spacecraft systems, including the thrusters. 4. Electric Propulsion (EP) – Accepts as an input electrical power, which is used to accelerate a propellant to high speeds to produce thrust. This system includes the power processing unit (PPU), which converts the power it receives to the correct current and voltage required by the thrusters, and the propellant storage and feed systems, which contain and meter the flow of propellant to the thrusters. 5. Thermal Management (Radiators/Heat Rejection) – The cold side of the thermodynamic power conversion cycle, accepts thermal power from the power conversion system and radiatively rejects that heat to space. In this paper, we describe the SNP project formulation and investment strategy that aims to accomplish the research and development required to advance the technology readiness for each CTE. The strategy relies heavily upon experimental testing supported by modeling and simulation to yield realistic assessments of the technologies, which in turn will be used to inform future NEP system-level design decisions and any potential technology downselects.

Kurt A Polzin↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

2019 Wireless Test Bed Range Manual

Idaho National Laboratory (INL), Next Generation Wireless Test Bed (NGWTB) program, is part of the Critical Infrastructure Protection (CIP) initiative. Our nation’s reliance on wireless and Internet technology is rapidly evolving as more corporations and government agencies, employees, and handheld devices include mobile connectivity for both voice and data. The competitive advantage offered by a mobile workforce is leading many corporations to make wireless integration and convergence a top business priority. Similarly, military systems worldwide are rapidly embracing next-generation commercial technologies to accelerate network-centric capabilities and provide enhanced situational awareness. While handheld devices such as laptops, BlackBerrys, and cell phones once had limited mobility and range, they are rapidly incorporating new and multiple protocols such as Bluetooth, Wi-Fi, Satellite, and broadband cellular (3G/4G) on a single platform to increase their effectiveness and agility. Worldwide there is exponential growth in public Wi-Fi and/or Satellite connectivity access nodes, and 3G/4G cellular continues to evolve and expand the range and speed of these devices. Additionally, critical infrastructure networks, previously isolated or connected with dedicated wireline circuits, are incorporating Zigbee for wireless sensor networks, wireless LANs for maintenance functions, and cellular or Internet based backhaul to manage control centers. Yet with all the build-up surrounding wireless technology, few understand the complexities surrounding wireless protocols and security, the risks of converged network infrastructures, need for interoperability of communication systems, or mitigation measures to safely use and improve new technologies in both commercial and military environments. With no single vendor source for all the telecommunications equipment needed for wireless infrastructure upgrades, and no one entity providing end-to-end testing or independent validation, the INL's NGWTB program fulfills a niche for facilitating integrated testing of multiple technologies, across multiple wireless domains, of next generation wireless telecommunications systems. NGWTB engineers and technicians have constructed and operate domain infrastructure in the Wireless Personal Area Network (WPAN), Wireless Local Area Network (WLAN), Wireless Metropolitan Area Networks (WMAN), and Wireless Wide Area Networks (WWAN). Advantages that make the INL's NGWTB the place to conduct project and programmatic testing include: • NTIA Experimental Station authority • Geographically isolated and low-noise radio frequency (RF) test areas located on a 890 sm DOE reservation • Access to isolated high-speed LAN and FOT networks The rollout of next-generation networks will involve deploying new technologies at every level including new: handsets, frequencies, antenna arrays, cell configurations that are optimized for both data and voice, massive upgrade of cell controllers’ “land-line” phone links from low bandwidth connections to higher capacity fiber or wireless backhaul, and integration of voice switching and Internet/data network protocols (Voice-Over-IP, Web phones). These systems are expected to greatly transform our nation's communications infrastructure and the types of services it provides.

2G↗

Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance. There is currently a premium on processing and storage space in the radioactive liquid waste tank system. To enable continuation of risk reduction initiatives, the Plan establishes a processing strategy that provides tank space required to meet, or minimizes the impacts to meeting, programmatic objectives. The Plan also addresses perturbations in funding and schedule impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESTIMATING HIGH LEVEL WASTE MIXING PERFORMANCE IN HANFORD DOUBLE SHELL TANKS

The ability to effectively mix, sample, certify, and deliver consistent batches of high level waste (HLW) feed from the Hanford double shell tanks (DSTs) to the Waste Treatment and Immobilization Plant (WTP) presents a significant mission risk with potential to impact mission length and the quantity of HLW glass produced. The Department of Energy's (DOE's) Tank Operations Contractor (TOC), Washington River Protection Solutions (WRPS) is currently demonstrating mixing, sampling, and batch transfer performance in two different sizes of small-scale DSTs. The results of these demonstrations will be used to estimate full-scale DST mixing performance and provide the key input to a programmatic decision on the need to build a dedicated feed certification facility. This paper discusses the results from initial mixing demonstration activities and presents data evaluation techniques that allow insight into the performance relationships of the two small tanks. The next steps, sampling and batch transfers, of the small scale demonstration activities are introduced. A discussion of the integration of results from the mixing, sampling, and batch transfer tests to allow estimating full-scale DST performance is presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioisotope Stirling Generator Options for Pluto Fast Flyby Mission

The preceding paper described conceptual designs and analytical results for five Radioisotope Thermoelectric Generator (RTG) options for the Pluto Fast Flyby (PFF) mission, and the present paper describes three Radioisotope Stirling Generator (RSG) options for the same mission. The RSG options are based on essentially the same radioisotope heat source modules used in previously flown RTGs and on designs and analyses of a 75-watt free-piston Stirling engine produced by Mechanical Technology Incorporated (MTI) for NASA's Lewis Research Center. The integrated system design options presented were generated in a Fairchild Space study sponsored by the Department of Energy's Office of Special Applications, in support of ongoing PFF mission and spacecraft studies that the Jet Propulsion Laboratory (JPL) is conducting for the National Aeronautics and Space Administration (NASA). That study's NASA-directed goal is to reduce the spacecraft mass from its baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for a power source able to deliver 69 watts(e) at the end of the 9.2-year mission. In general, the Stirling options were found to be lighter than the thermoelectric options described in the preceding paper. But they are less mature, requiring more development, and entailing greater programmatic risk. The Stirling power system mass ranged from 7.3 kg (well below the 10-kg goal) for a non-redundant system to 11.3 kg for a redundant system able to maintain full power if one of its engines fails. In fact, the latter system could deliver as much as 115 watts(e) if desired by the mission planners. There are 2 copies in the file.

Fast↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A lowcost, portable, and end-to-end photovoltaic-system test appropriate for NASA's new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metalhalide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, highfidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility. At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendor's panellevel data and periodic inspection, the method ensures system integrity from Integration and Test (I&T) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

power systems↗

Low-cost, Risk-Reduction Testing of Class D Spacecraft Photovoltaic Systems

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A low-cost, portable, and end-to-end photovoltaic-system test appropriate for NASAs new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metal-halide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, high-fidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility.At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendors panel-level data and periodic inspection, the method ensures system integrity from Integration and Test (IT) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

photovoltaic↗

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗