Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “problem reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Potential effects of the introduction of the discrete address beacon system data link on air/ground information transfer problems

This study of Aviation Safety Reporting System reports suggests that benefits should accure from implementation of discrete address beacon system data link. The phase enhanced terminal information system service is expected to provide better terminal information than present systems by improving currency and accuracy. In the exchange of air traffic control messages, discrete address insures that only the intended recipient receives and acts on a specific message. Visual displays and printer copy of messages should mitigate many of the reported problems associated with voice communications. The problems that remain unaffected include error in addressing the intended recipient and messages whose content is wrong but are otherwise correct as to format and reasonableness.

Grayson, R. L.↗

Putting the Power of Configuration in the Hands of the Users

Goal was to reduce the overall cost of human space flight while maintaining the most demanding standards for safety and mission success. In support of this goal, a project team was chartered to replace 18 legacy Space Shuttle nonconformance processes and systems with one fully integrated system Problem Reporting and Corrective Action (PRACA) processes provide a closed-loop system for the identification, disposition, resolution, closure, and reporting of all Space Shuttle hardware/software problems PRACA processes are integrated throughout the Space Shuttle organizational processes and are critical to assuring a safe and successful program Primary Project Objectives Develop a fully integrated system that provides an automated workflow with electronic signatures Support multiple NASA programs and contracts with a single "system" architecture Define standard processes, implement best practices, and minimize process variations

Al-Shihabi, Mary-Jo↗

Psychological Adaptation to Extreme Environments: Effects of Team Composition on Individual Adaptation

This study is part of an ongoing program of research examining the psychological effects of isolation and confinement on individual adaptation, productivity and group relations in Antarctic winter personnel. This environment is used as an analogue for long-duration space mission scenarios, such as a space station sojourn, or a mission to Mars. Earlier results from this and other environments have demonstrated that: (1) most changes in psychological well-being are event-related and of relatively short duration; and (2) the greatest problem facing most individuals is interpersonal conflict. Content analysis of responses to open-ended questions has identified the numerous enjoyable aspects of Antarctic living, and confirmed that many of the problems reported were interpersonal in nature, and that problems varied significantly by station. Current work is exploring the effects of team assignment on the self-reported psychological changes and self-evaluations of members of isolated teams. This work includes identifying the dimensions by which subjects determine how well they are functioning. These dimensions (e.g., work, social life, internal emotional state) appear to play an important role in how subjects evaluate many aspects of life in isolation.

Wood, J.↗

Improving operations: Metrics to Results

As a result of the mission failure of the Mars Climate Orbiter (MCO) spacecraft in 1999, the Jet Propulsion Laboratory (JPL) initiated the development of a Mission Operations Assurance (MOA) program to be implemented across all flight projects managed by JPL. One of the initiatives undertaken in 2001 was the collection of data on command file errors occurring in the operational phase of the mission. This paper defines command file errors and how and where they occur in the operations process. It also describes the problem reporting system (PRS) in use for mission operations at JPL. We examine the recent modifications to the PRS that enable the collection of metrics, specifically on command file errors. This paper discusses what the data show us since metrics have been collected for the operational missions conducted by JPL. We examine the evolution of an operational working group initiative to evaluate proximate, contributing, and root causes for the errors. As part of this discussion we see what the metrics have indicated over a decade. At the macro level, we can say that the aggregate command file error rate has been cut to roughly one third of the initial 2001 level by the end of 2011. Additionally, we explore efficient and innovative means to continually integrate the findings and recommendations from the working group back into the flight operations environment.

command file errors↗

Spacecraft Electrical Connector Selection and Application Processes

This assessment was initiated by the NASA Engineering & Safety Center (NESC) after a number of recent "high profile" connector problems, the most visible and publicized of these being the problem with the Space Shuttle's Engine Cut-Off System cryogenic feed-thru connector. The NESC commissioned a review of NASA's connector selection and application processes for space flight applications, including how lessons learned and past problem records are fed back into the processes to avoid recurring issues. Team members were primarily from the various NASA Centers and included connector and electrical parts specialists. The commissioned study was conducted on spacecraft connector selection and application processes at NASA Centers. The team also compared the NASA spacecraft connector selection and application process to the military process, identified recent high profile connector failures, and analyzed problem report data looking for trends and common occurrences. The team characterized NASA's connector problem experience into a list of top connector issues based on anecdotal evidence of a system's impact and commonality between Centers. These top issues are as follows, in no particular rank order: electrically shorted, bent and/or recessed contact pins, contact pin/socket contamination leading to electrically open or intermittencies, connector plating corrosion or corrosion of connector components, low or inadequate contact pin retention forces, contact crimp failures, unmated connectors and mis-wiring due to workmanship errors during installation or maintenance, loose connectors due to manufacturing defects such as wavy washer and worn bayonet retention, damaged connector elastomeric seals and cryogenic connector failure. A survey was also conducted of SAE Connector AE-8C1 committee members regarding their experience relative to the NASA concerns on connectors. The most common responses in order of occurrence were contact retention, plating issues, worn-out or damaged coupling mechanisms, bent pins, contact crimp barrel cracking and torn seals. In addition to these common themes, responses included issues with markings, dimensional errors on the build, contact/socket damage (handling), manufacturing defects and customer misapplication and mishandling. The NESC team concluded that considering the large quantity and wide variety of connectors successfully flown on human and robotic space applications, the number of failures is quite low. However, "high profile" failures with significant cost, schedule, safety, and/or mission success impacts continue to occur. It was also concluded that connector failures occur throughout a system's life-cycle with the majority of connector issues application related. A number of recommendations were identified for improving NASA connector selection processes and overall space connector reliability and performance.

Iannello, Chris↗

The Role of Independent V&V in Upstream Software Development Processes

This paper describes the role of Verification and Validation (V&V) during the requirements and high level design processes, and in particular the role of Independent V&V (IV&V). The job of IV&V during these phases is to ensure that the requirements are complete, consistent and valid, and to ensure that the high level design meets the requirements. This contrasts with the role of Quality Assurance (QA), which ensures that appropriate standards and process models are defined and applied. This paper describes the current state of practice for IV&V, concentrating on the process model used in NASA projects. We describe a case study, showing the processes by which problem reporting and tracking takes place, and how IV&V feeds into decision making by the development team. We then describe the problems faced in implementing IV&V. We conclude that despite a well defined process model, and tools to support it, IV&V is still beset by communication and coordination problems.

Easterbrook, Steve↗