At least 73 records · Page 4

Automated electric power management and control for Space Station Freedom

A comprehensive automation design is being developed for Space Station Freedom's electric power system. It strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. An integrated approach to the power system command and control problem is defined and used to direct technology development in: diagnosis, security monitoring and analysis, battery management, and cooperative problem-solving for resource allocation. The prototype automated power system is developed using simulations and test-beds.

Dolce, James L.↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

Dynamic Economic Dispatch Considering Transmission–Distribution Coordination and Automatic Regulation Effect

With the rapid increase of renewable energy sources, the variability and uncertainty in power systems are significantly increased, and the power system operation is facing more and more challenges. In the traditional dynamic economic dispatch (DED) of transmission systems, the frequency and voltage regulation effects are not actively utilized. In addition, the transmission systems and distribution systems are optimized separately; the transmission–distribution coordination effect is not considered. In this article, a new DED is proposed. The optimal scheduling results are obtained by making a balance between operating cost and reliability cost. Both the automatic regulation effect and transmission–distribution coordination effect are explored and exploited in terms of the equivalent reserve, which can reduce the reserve provided by generating units, and can further enhance the security and economics of power system operation. The validity and effectiveness of the proposed model are illustrated by case studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

TOPEX Electrical Power System - Autonomous Operation

The main objective of TOPEX/Poseidon Satellite is to monitor the world's oceans for scientific study of weather and climate prediction, coastal storm warning and maritime safety.

oceans climate predictions Electrical Power System↗

A review of active probing-based system identification techniques with applications in power systems

System identification is becoming a relevant research area for numerous applications in power grids due to the increasing complexity of the system. A paradigm shift in power system infrastructure driven by renewable energy resources, controllable loads, and new power electronics technologies have given rise to new challenges in power systems operation and control. This increased complexity of power systems and unavailability of physics-based models of most inverter-based resources requires that traditional modeling of power systems approaches be complemented by system identification-based black or grey box modeling techniques. In light of the importance of system identification and little attention paid to the applications of these techniques in transforming power systems, this paper provides a comprehensive review of active probing-based system identification methods in the context of power system applications. It reviews applications of both linear and nonlinear system identification with discussion on their potential and key takeaways. To motivate a further practical use in power systems, the paper provides an example of system identification, to develop a state space model of an unknown plant with step-by-step details. The paper highlights the advantages of using modern power electronics-based sources in the identification process and discusses the emerging research directions for future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PEGASUS - A multi-megawatt nuclear electric propulsion system

A propulsion system (The PEGASUS Drive) consisting of a magnetoplasmadynamic (MPD) thruster driven by a multimegawatt nuclear power system is proposed as the propulsion system for a manned Mars mission. The propulsion system described is based on a mission profile containing a 510-day burn time (for a mission time of approximately 1000 days). Electric propulsion systems have significant advantages over chemical systems, because of high specific impulse, lower propellant requirements, and lower system mass. The thermal power for the PEGASUS Drive is supplied by a boiling liquid-metal fast reactor. The system consists of the reactor, reactor shielding, power conditioning, heat rejection, and MPD thruster subsystems. It is capable of providing a maximum of 8.5 megawatts of electrical power of which 6 megawatts is needed for the thruster system, 1.5 megawatts is available for spacecraft system operations and inflight mission applications, leaving the balance for power system operation.

Coomes, E. P.↗

A Real-Time Operations Manual for the IEEE 118 Bus Transmission Model

This document presents a sample operations manual for the IEEE 118 Bus Model, which is a synthetic test case developed in 1962 from a section of the transmission grid operated by American Electric Power (AEP). The model is one of the most used synthetic test cases for development of power system applications and is referenced by over 9000 papers. However, the model lacks any context for use with real-time energy management system (EMS) applications, including common considerations, such as generator ramp rates, reactive capabilities, operating limits, and other information typically used by power system operators for real-time decision making. This manual divides the IEEE 118 Bus Model into three operating areas, defines various operating limits, and sets recommended operating procedures for responding to a few types of emergency operating conditions. The manual can be used in support of a wide variety of human-in-the-loop evaluation methodologies for new advanced power applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operator Insights and Usability Evaluation of Machine Learning Assistance for Power Grid Contingency Analysis

Introducing machine learning (ML) assistance into any established process comes with adoption barriers, including entrenched procedures, technological and human readiness levels, human-machine trust, and work culture resistance to change. These barriers are even greater in critical operations such as operating a national or regional power grid, in which both regulatory frameworks and the importance of maintaining reliability levels causes additional resistance to the adoption of new computational support. Developers of future systems and job aides must consider not only technical aspects, but also whether new systems are usable by power system operators. This work presents the methodology and results of a study to evaluate the usability and readiness of a prototype recommender system for power grid contingency analysis. We explore operator cognitive load and evaluate operator performance when solving a collection of scenarios both with and without recommender assistance. We also examine operator trust in the system. We report insights gained on the readiness of the system using a collection of evaluation techniques.

Human-Machine Teaming, Power Systems, usability ev↗

New Tool Evaluates the Financial Viability of Pumped Storage Hydropower

The rapidly evolving electricity system with increasing variable renewable energy (VRE) resources provides both opportunities and challenges for the power sector. With the significant ramps and intermittency associated with VRE resources, the requirements and need for additional flexible resources increase. Pumped storage hydropower (PSH) provides flexibility to the electricity grid to replace fossil fuel plants, which are responsible for 25% of U.S. emissions. PSH projects support various aspects of power system operations, including flexibility, ramping capability, energy, ancillary service, black start, and others. The significant potential of hydropower requires understanding the different value drivers to the electricity system specific to the location of a project and then optimizing the plant for the different system values. Thus, determining the value of PSH projects and their many services and contributions to the electricity system can be a challenge for potential developers, system owners, regulators, policy makers, and consultants.

13 HYDRO ENERGY↗

Managing Power Systems-Induced Wildfire Risks Using Optimal Scheduled Shutoffs

The increasing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electric grids. Often, this pressure leads to electrical component failures, which might ignite wildfires. This work develops a novel model to balance the reliability of power network operations and the risk of wildfire ignition by opti- mizing the operational schedule of power transmission networks considering time-varying risk measures that include exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfire risk. The results demonstrate the ability of the model to significantly reduce wildfire risk without considerable load shedding.

power systems operations↗

Using Synchrophasor Status Word as Data Quality Indicator: What to Expect in the Field?

Data quality plays a crucial role in successful applications of synchrophasor data in power system operation and control. This paper presents the results of a data quality analysis of a multi-year field-recorded synchrophasor dataset. The analysis has identified several typical data quality issues encountered in the field data. An examination of the PMU status words included with the dataset has revealed several inconsistent implementations and the lack of correlation between the PMU data quality and the status word, which impacts the usefulness of such information. Our investigation has concluded that the status word alone as found in the recorded field dataset could not be used as a reliable indicator of data quality for field-recorded data. Several recommendations are proposed to improve the usefulness of the PMU status word.

Cheng, Zheyuan↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Hydropower Modeling Gaps in Planning and Operational Studies

In the evolving power system, where new renewable resources displace continually conventional generation and hydro becomes a single traditional resource that is fully controllable, it is timely to examine hydrogeneration’s role in the power system of the future and its representation in power system operation and planning reliability studies. This paper identifies some of the gaps in hydro-based generation representation in steady-state and dynamic models and provides recommendations for their mitigation.

13 HYDRO ENERGY↗

Lessons Learned for Rapid Decarbonization Of Power Sectors: Key Messages for Energy Ministers

This report covers key lessons learned for the rapid decarbonization of power systems, emphasizing best practices in planning, building, and operating power systems. This report is the result of a collaborative effort among various Clean Energy Ministerial (CEM) workstreams and partner initiatives: 21st Century Power Partnership (21CPP); Carbon Capture, Utilization and Storage (CCUS); Global Power System Transformation Consortium (G-PST), a partner to CEM; Industrial Deep Decarbonization Initiative (IDDI); International Energy Agency Digital Demand-Driven Electricity Networks Initiative (IEA 3DEN), a partner to CEM; International Smart Grid Action Network (ISGAN); Long Term Scenarios for the Energy Transition (LTES); Nuclear Innovation: Clean Energy Future (NICE Future); Super-Efficient Equipment and Appliance Deployment (SEAD). The contents are not intended to be comprehensive of all power sector topics, and there may be overlap between content in each section due to the nature of this first-of-its-kind collaborative effort to deliver unified messaging on power sector decarbonization to energy ministers. This work is intended to complement other work at the Clean Energy Ministerial and offers options for consideration, not specific policy recommendations.

21CPP↗

Multi-spool CO2 aircraft power system for operating multiple generators

A CO 2 bottoming cycle system includes a first compressor operatively connected to a first turbine through a first shaft. A first generator is operatively connected to the first shaft. A second compressor is fluidically connected to the first compressor. The second compressor is operatively connected to a second turbine through a second shaft. A second generator is operatively connected to the second shaft. The first turbine is fluidically connected to the second turbine.

Taylor, Stephen H.↗

Probabilistic Hydropower Flexibility Valuation: Case Studies for Boating Flow Regime

The optimal scheduling of hydropower generation holds significant importance to power system operation. The unique requirements of environmental constraints and the power system, depending on their respective objectives, demand distinct flow patterns. While power system stakeholders strive to optimize revenue in electricity markets, stakeholders from boating recreation seeks to identify flow ranges that optimize the boating experience. In pursuit of a win-win solution, this study aims to reconcile the interests of various stakeholders in hydropower scheduling. The maximum revenue from day-ahead electricity market is explored through an optimization process considering both plant operation constraints, boating flow constraints, water availability, and market prices. Results of real world case studies at a river in California show that the proposed approach can achieve dual objectives: maximizing market revenue while addressing boating recreation necessities. In addition, as the accuracy of electricity price forecasting and flow forecasting increase, the optimal revenue becomes increasingly advantageous to hydropower plant operators.

13 HYDRO ENERGY↗

Field Measurement and Analysis of Frequency and RoCoF for Low-Inertia Power Systems

The frequency measurement and rate of change of frequency (RoCoF) calculations are important for active power, frequency control, and frequency-related protection in power system operations. With the rapid decrease in inertia under modern power systems, however, multiple power variations introduced by variable renewable energy bring large RoCoF and introduce oscillations in frequency measurements. To shed light on this issue, this article proposes a frequency measurement and RoCoF analysis technology, as well as the sensitivity analysis for the real low-inertia power grid. First, a real-world event in an island power grid is analyzed as an example, and an event numerical model is estimated considering four uncertainties, including event RoCoF, oscillation magnitude, oscillation frequency, and underfrequency load-shedding threshold. Then, a sensitivity analysis is performed using the Sobol indices method and quasi-Monte Carlo simulations to identify the dominant uncertainties based on the event model. Here, the dominant uncertainties are compared to provide a guideline for the frequency estimation algorithm selection under different event cases. This algorithm is compared with an enhanced zero-crossing algorithm and gives a 3.41% better RoCoF error rate. Finally, an experiment is conducted using universal grid analyzers to validate the simulation results and the theoretical analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗