Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power grid operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Operating Wind Turbine as Synchronous Generator: Modeling and Power-Hardware-in-the-Loop Demonstration

Grid-forming (GFM) control of Type 3 and Type 4 wind turbine generators (WTGs) has attracted substantial attention in power systems research; however, the limited overcurrent capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. Synchronous wind, also referred to as a Type 5 WTG, offers a unique GFM solution to address grid integration and grid strength issues by keeping the grid largely synchronous at very high integration levels of renewable generation. A Type 5 WTG interfaces with the electric grid via a synchronous generator driven by a variable speed hydraulic torque converter; hence, the wind rotor operates in variable-speed mode for maximum power generation, and the generator shaft remains synchronous to the grid. This paper develops and tests a high-fidelity model of a Type 5 WTG in a power-hardware-in-the-loop testing environment, and it presents its operation characteristics under different grid contingencies. The power-hardware-in-the-loop demonstration shows that a Type 5 WTG inherently behaves as a GFM unit and can obtain similar performance in terms of power response, wind rotor dynamics, and stability enhancement compared to a Type 3 WTG in GFM control mode. Furthermore, the paper provides further insight into how Type 5 WTGs can support the smooth transition to power systems with high integration levels of inverter-based resources.

17 - WIND ENERGY↗

Use of Hardware-in-the-Loop to De-Risk Field Deployment of Hydrogen Assets

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

08 HYDROGEN↗

Validation of Interconnection and Interoperability of Grid-Forming Inverters Sourced by Hydrogen Technologies in View of 100% Renewable Microgrids

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

controller hardware-in-the-loop↗

Lunar Microgrid Trade Studies to Define Interface Converter Requirements

The National Aeronautics and Space Administration (NASA) is interested in developing an incremental lunar power grid to support continuous human/robotic operations under the Artemis missions and can scale to global power utilization and industrial power levels. The initial lunar surface power system will be composed primarily of assets that contain their own power generation and energy storage. These assets can be connected to form a grid, which allows power to be shared between the system’s distributed energy resources. This grid can provide backup power to existing assets as well as primary power to future assets. A trade study was conducted for an Artemis scale grid, which has identified 3 kVAC as an ideal transmission voltage. This paper documents the analysis and findings from these trade studies. These studies were used to define the operating voltage and develop a common interface for connecting lunar surface assets to the power grid. The Universal Modular Interface Converter (UMIC) connects lunar surface assets to the high voltage grid. Products from this grid definition and UMIC development work will enable highly reliable and available power for Artemis and future planetary surface missions, which is key to achieving NASA’s long-term vision of space exploration.

Planetary surface power↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methodology for Time-Domain Estimation of Storm Time Geoelectric Fields Using the 3-D Magnetotelluric Response Tensors

Geoelectric fields at the Earth's surface caused by magnetic storms constitute a hazard to the operation of electric power grids and related infrastructure. The ability to estimate these geoelectric fields in close to real time and provide local predictions would better equip the industry to mitigate negative impacts on their operations. Here we report progress toward this goal: development of robust algorithms that convolve a magnetic storm time series with a frequency domain impedance for a realistic three-dimensional (3-D) Earth, to estimate the local, storm time geoelectric field. Both frequency domain and time domain approaches are presented and validated against storm time geoelectric field data measured in Japan. The methods are then compared in the context of a real-time application.

Kelbert, Anna↗

System Analysis of an Internal Combustion Engine (ICE) - Solid Oxide Fuel Cell (SOFC) Hybrid Cycle

The variability of renewable energy sources poses challenges for reliable grid operation. Conventional thermal power sources, though reliable, often lack operational flexibility. Hybrid energy systems that integrate Solid Oxide Fuel cells (SOFC) with Internal Combustion Engines (ICE) offer a promising solution by achieving relatively higher efficiency and grid-following capability. This study investigates performance of a 100-kW pressurized SOFC-ICE hybrid cycle. In this configuration, unutilized SOFC fuel is used to drive the engine, with a turbocharger providing air supply and an external reformer generating syngas. System components were numerically modeled using MATLAB/SIMULINK for the SOFC and reformer, and EBSILON® for the ICE and balance of plant. Parametric studies varied fuel utilization (70-90%), reformer temperature (600 – 1000K), anode off-gas recirculation (0 – 70%), and current density (0.2 – 0.55 A/cm2). Results show that the SOFC and ICE operate as thermally independent topping and bottoming cycles, achieving peak efficiency of 62% under optimized conditions.

hybrid↗

Optimizing Power Line Undergrounding Decisions under Varying Wildfire Risk and Weather Scenarios

Abstract—The threat of wildfire ignitions from electric power equipment has led utilities to increasingly turn to preemptive power shutoffs, which, while effective in reducing grid-induced wildfire risk, can cause significant load loss. Undergrounding power lines is an alternative strategy for preventing grid-induced wildfires. However, undergrounding lines is costly, so an efficient undergrounding plan must balance reductions in wildfire risk and load loss with the cost of undergrounding lines. We propose a robust optimization model to identify which power lines to underground to maximize load served while limiting wildfire risk across a range of wildfire risk and weather scenarios. Since solving this problem may be computationally heavy for large power grids and many operating scenarios, we present a delayed constraint generation algorithm to iteratively add scenarios until an optimal solution is found. We evaluate the performance of this framework on the RTS-GMLC with scenarios representing a year of operating conditions and compare it with a stochastic programming formulation. Our results indicate that our undergrounding model is successful in reducing load shed and risk compared to baseline cases in which no mitigation action is taken and only power shutoffs are implemented (no undergrounding). The robust formulation also reduces more load shed than the stochastic formulation in the most extreme scenarios. Index Terms—grid resilience, optimization, transmission systems, underground power lines, wildfire risk.

Taylor, S. [Department of Electrical and Computer ↗

Digital Twin + AI: Control Room of the Future

A digital twin enhances power grid control room operations by providing real-time monitoring, predictive insights, simulation capabilities, remote control, training opportunities, data integration, and decision support. This technology empowers control room operators to effectively manage the grid, optimize performance, and ensure reliable and efficient energy distribution.

control room of the future↗

Modeling Grid Data Flows for Transmission and Distribution Operations: Review, Design, Next Steps

Operational scenarios of the power grids grow multifold to accommodate the diverse needs of both the utilities and end consumers, and the various other stakeholders in-between. To comprehensively model and apply analytics to support objectives and business functions of grid sectors, a reliable approach to characterize and design data flows is crucial. The flows bridge business functions with communications protocols, stakeholders such as the grid actors, and data interfaces comprising different data objects. Additionally, constraints applied to the flow such as cybersecurity, trust, privacy, and ownership among others intersect these entities, requiring the delineation of their interactions under different scenarios. This paper aims to not only highlight relevant research in the space of grid data flows, but also proposes, for the transmission-distribution sector, a novel modeling approach that marries the aforementioned entities: objectives, business functions, data interfaces, communication protocols, data stakeholders, and flow constraints. It elaborates on the design philosophy and the significance of each entity within the model and applies it to an example function of fault location, isolation and service restoration (FLISR). Finally, the next steps to extend the application of this data flow model for other practical operational scenarios are discussed.

Sundararajan, Aditya [ORNL] (ORCID:000000033577854↗

Design and Prototyping of Advanced Control Systems for Advanced Reactors Operating in the Future Electric Grid (Final Report)

Despite its significant advantages as a baseload, low-carbon energy source, the U.S. nuclear power industry has faced increasing difficulties in maintaining economic competitiveness in a rapidly evolving energy market. The economic conditions faced by the current fleet of nuclear power plants (NPPs) in the U.S. deregulated electricity market require a concerted effort to mitigate specific cost factors. Many units are struggling to stay competitive, and some premature shutdowns have occurred. Besides, in response to the large penetration of renewable energy sources, the role of nuclear power plants as pure baseload units needs to be reconsidered. Based on these experiences, operational flexibility is considered a fundamental requirement for the next generation of nuclear reactors to be competitive in the future energy market. The deployment of advanced reactors capable of operating within a new power grid paradigm, known as the Integrated Energy System (IES) was investigated. This approach combines new reactor designs with Thermal Energy Storage (TES) technologies, allowing the nuclear reactor to maintain a steady power output without the need for constant adjustments in response to load demand fluctuations. With this configuration, the reactor operates as a baseload unit, experiencing only very gradual power transients, while the energy storage facility within the power conversion cycle acts as a peaking unit.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the locational energy value.

Mongird, Kendall↗

Long duration battery sizing, siting, and operation under wildfire risk using progressive hedging

Battery sizing and siting problems are computationally challenging due to the need to make long-term planning decisions that are cognizant of short-term operational decisions. This paper considers sizing, siting, and operating batteries in a power grid to maximize their benefits, including price arbitrage and load shed mitigation, during both normal operations and periods with high wildfire ignition risk. Here we formulate a multi-scenario optimization problem for long duration battery storage while considering the possibility of load shedding during Public Safety Power Shutoff (PSPS) events that de-energize lines to mitigate severe wildfire ignition risk. To enable a computationally scalable solution of this problem with many scenarios of wildfire risk and power injection variability, we develop a customized temporal decomposition method based on a progressive hedging framework. Extending traditional progressive hedging techniques, we consider coupling in both placement variables across all scenarios and state-of-charge variables at temporal boundaries. This enforces consistency across scenarios while enabling parallel computations despite both spatial and temporal coupling. The proposed decomposition facilitates efficient and scalable modeling of a full year of hourly operational decisions to inform the sizing and siting of batteries. With this decomposition, we model a year of hourly operational decisions to inform optimal battery placement for a 240-bus WECC model in under 70 min of wall-clock time.

25 ENERGY STORAGE↗

A comprehensive framework for validating simulation models of power system equipment using terminal measurements

Accurate simulation of power-plants is essential to the planning and operation of modern power grids. The current methods used to periodically check power-plant simulation models have many open questions about their limitations and accuracy. The research in this project explored using Monte-Carlo Experimentation (MCE) as a means for answering these important questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

A Large-Scale Hardware Experiment Demonstration of Operating High Inverter-Based Resource Power Systems With Grid-Forming Inverters

This paper presents experimental hardware results from a microgrid system as the penetration level of grid-forming (GFM) inverters increases. The experiment aims to showcase the advantages of GFM inverters in enhancing system stability and to investigate the operational challenges in systems relying entirely on inverter-based resources (IBRs). Five test scenarios are devised to progressively increase GFM inverter penetration levels: 0% (S1), 19% (S2), 37% (S3), 68% (S4), and 100% (S5). To ensure consistency, identical loading conditions and dynamic events are applied across all scenarios. The conducted tests include load step changes, output variation of grid-following (GFL) inverters during islanded mode, transition operations (such as synchronization to the grid and islanding), and rateof- change-of-frequency (ROCOF) and voltage jump tests during grid-connected mode. Key findings from the tests are summarized as follows: (1) Scenario S1 proved most challenging for load steps, and GFL variations because of insufficient GFM capacity, leaving the diesel generator unable to handle transient ridethrough; (2) Scenario S5 was the most difficult for transition operations, because the lack of a diesel generator to maintain stiff bus voltage resulted in unexpected reactive power flows during synchronization, causing the point of common coupling (PCC) breaker to trip; (3) Scenarios S4 and S5 were particularly challenging for ROCOF tests because of minimal system inertia, leading to large transients that triggered breaker trips; and (4) Scenario S4 exhibited the strongest voltage recovery capability because of the presence of the diesel generator and a higher number of GFM inverters, both of which possess the highest capacity for reactive power injection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enabling Universal Access to Power on the Lunar Surface

The National Aeronautics and Space Administration (NASA) Artemis Missions will return human astronauts to the lunar surface, demonstrate technologies that establish a sustained presence on the lunar surface and enable human missions to Mars, and help create a lunar commercial economy. Creating a sustained permanent presence on the lunar surface will require access to continuous and highly reliable power to support mission needs. During Artemis, lunar surface operations will evolve and grow over time (years), requiring an increase in the amount of power needed (100s of kW) and distance that the power must be transmitted (up to 10 km during early Artemis missions). A lunar commercial economy is likely to exceed this power demand to the MW level and distance in the 100s of km. This increased distance and demand for highly reliable power drives the need to create an electric power grid by connecting localized lunar power systems (e.g., habitats, in-situ resource utilization plants, etc.), each containing one or more loads and/or sources. Developing a lunar surface power grid will allow lunar surface operations to resemble electrical utility operations on Earth; it allows power to be generated where it is convenient and allows power to be consumed where it is convenient and required. A lunar surface electric power grid will facilitate the growth of a lunar commercial economy because it provides a means to connect new loads to an existing electrical power system. A common standardized interface to the grid and a set of standardized voltages is required to take full advantage of the benefits of an electric power grid, similar to the terrestrial power grid. NASA Glenn Research Center is leading an effort to create universal access to power through the development of the Universal Modular Interface Converter (UMIC). The UMIC is designed to have a common interface that connects sources and loads compliant with the International Space Power System Interoperability Standard (ISPSIS) to a higher voltage AC transmission system or power grid. This presentation will further discuss the evolution of power during the Artemis missions, challenges associated with creating a sustained presence on the lunar surface, progress made on the UMIC, and future opportunities for technology development and standards.

space power systems↗