Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning under uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Climate-aware decision-making: lessons for electric grid infrastructure planning and operations

Abstract Climate change poses significant risks to large-scale infrastructure systems and brings considerable uncertainties that challenge historical planning approaches. Here we focus on how climate awareness might be better incorporated into planning and decision-making in the electric power sector. To do so, we consider lessons from decision science literature where researchers have specifically focused on how to make better decisions under uncertainty. We perform a three-part review: of decision science literature on best practices for decision-making under uncertainty, of industry practice documents to understand how new uncertainties may affect the types of decisions electric utilities are making today, and of literature on electricity sector planning under climate change to assess how lessons from decision science might fit into sector-specific analyses. We discuss how characterizations of uncertainty from the decision science literature might guide approaches in the electricity sector to appropriately capture climate-related uncertainties. We also distill three key ideas from the decision science literature that can be incorporated into electricity sector planning to manage these new uncertainties: robustness, adaptive planning, and multi-stakeholder engagement. We offer example recommendations for how these key ideas might be incorporated into one essential type of planning activity, capacity expansion.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Projection Analysis for ATR Irradiation of the AFC-FAST Experiment

Analyses of the Advanced Fuels Campaign Fission Accelerated Steady-state Test (AFC-FAST) in the Advanced Test Reactor are presented. A detailed methodology was employed to better account for uncertainties in the planned power and duration of sequential reactor loading cycles. By performing coupled depletion analyses at multiple power levels and durations, the differences in experiment heating outputs can be found. The effects of these uncertainties upon multiple experiment configurations were assessed in an effort to streamline the process of planning for and documenting future irradiations. In conclusion, the data generated from this work have been used to help inform assumptions on subsequent projections to perform only a nominal case depletion.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Are better combinations of DERs more profitable?: Combinatorial optimization for aggregation of DERs in wholesale electricity markets

Recently, regulatory changes in various countries have enabled the participation of small-scale distributed energy resources (DERs) aggregated in virtual power plants (VPPs) in wholesale electricity markets. The inherent uncertainty and variability of resources comprising VPPs can lead to imbalances between forecasted and metered outputs, potentially resulting in the deficient settlement of generation under imbalance settlement rules. To address this challenge, it is essential to manage variability in the planning phase and uncertainty in the operation phase. Most current research focuses on managing forecasting errors in the operational phase, with insufficient attention given to the planning phase. Here, to bridge this gap, this paper proposes an optimal combination strategy for DERs to maximize the market participation revenue of VPPs by proactively managing variability in the planning phase. To estimate the expected revenue, we conducted analyses for homogeneous and heterogeneous DERs using Monte Carlo simulations and genetic algorithms. Remarkably, the proposed method demonstrated approximately 8 % higher revenue compared to the neighboring group case when considering diversity in DER set configuration with equal proportions of photovoltaics and wind.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Analyses of the Proposed Habitable Exoplanet Astrophysics Facility

The proposed Habitable Exoplanet (HabEx) astrophysics facility is one of four large such facilities being proposed to the 2020 decadal. It is a large telescope that is sensitive to ultraviolet, optical, and near-infrared photons. The proposed design’s overall length is on the order of 17.2 m and its maximum cross section is on the order of 5.25 X 5.25 m. The primary mirror is 4 m in diameter. A transient dynamic analysis was performed to estimate the order of magnitude of ring down time after moving the telescope and pointing at a new target for science planning purposes. Without uncertainty factors, results from a simple re-pointing maneuver indicate that primary to secondary mirror LOS errors are on the order of 10-4 pico-m after 5 minutes. Also, a frequency response analysis was performed to predict the impact of planned micro-thruster vibrations on required stability. Based on provided noise level associated with the micro-thrusters and loading assumptions and without uncertainty factors, the assessed vibrations do not impact predicted performance requirements.

Knight, J. Brent↗

Planning for the semiconductor manufacturer of the future

Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

Fargher, Hugh E.↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

Uncertainty in Agricultural Impact Assessment

This chapter considers issues concerning uncertainty associated with modeling and its use within agricultural impact assessments. Information about uncertainty is important for those who develop assessment methods, since that information indicates the need for, and the possibility of, improvement of the methods and databases. Such information also allows one to compare alternative methods. Information about the sources of uncertainties is an aid in prioritizing further work on the impact assessment method. Uncertainty information is also necessary for those who apply assessment methods, e.g., for projecting climate change impacts on agricultural production and for stakeholders who want to use the results as part of a decision-making process (e.g., for adaptation planning). For them, uncertainty information indicates the degree of confidence they can place in the simulated results. Quantification of uncertainty also provides stakeholders with an important guideline for making decisions that are robust across the known uncertainties. Thus, uncertainty information is important for any decision based on impact assessment. Ultimately, we are interested in knowledge about uncertainty so that information can be used to achieve positive outcomes from agricultural modeling and impact assessment.

damage assessment↗

Optimal Control of Biomass Feedstock Processing System Under Uncertainty in Biomass Quality

Planning of biorefinery operations is complicated by the stochastic nature of physical and chemical characteristics of biomass feedstock, such as, moisture level and carbohydrate content. Biomass characteristics affect the performance of the equipment which feed the reactor and the efficiency of the conversion process in a biorefinery. We propose a stochastic optimization model to identify a blend of feedstocks, inventory levels, and operating conditions of equipment to ensure a continuous flowing of biomass to the reactor while meeting the requirements of the biochemical conversion process. We propose a sample average approximation (SAA) of the model, and develop an efficient algorithm to solve the SAA model. A feedstock preprocessing process consists of two-stage grinding and pelleting is used to develop a case study. Extensive numerical analysis are conducted which lead to a number of observations. Our main observation is that sequencing bales based on moisture level and carbohydrate content leads to robust solutions that improve processing time and processing rate of the reactor. We provide a number of managerial insights that facilitate the implementation of the model proposed. Note to Practitioners—This paper is motivated by the challenges faced in the bioenergy industry. The focus of this paper is on plants which use the biochemical conversion process to generate liquid fuels. It has been observed that variations in biomass characteristics, such as moisture content, cause variations in feeding of the system which lead to under-utilization of equipment. A requirement of biochemical conversion process is to maintain the carbohydrate content of biomass processed by the reactor, larger than a threshold. We propose a model that identifies the inventory levels and operating conditions of equipment to ensure a continuous flowing of biomass to the reactor. The goal is to improve equipment utilization while satisfying the requirements of the conversion process. The model is tested using real-life data. We found out that by sequencing bales based on moisture level and carbohydrate content, a plant can reduce variability in the system leading to improved system reliability, higher processing rates of the reactor, and higher throughput.

09 BIOMASS FUELS↗

Planning robot actions under position and shape uncertainty

Geometric uncertainty may cause various failures during the execution of a robot control program. Avoiding such failures makes it necessary to reason about the effects of uncertainty in order to implement robust strategies. Researchers first point out that a manipulation program has to be faced with two types of uncertainty: those that might be locally processed using appropriate sensor based motions, and those that require a more global processing leading to insert new sensing operations. Then, they briefly describe how they solved the two related problems in the SHARP system: how to automatically synthesize a fine motion strategy allowing the robot to progressively achieve a given assembly relation despite position uncertainty, and how to represent uncertainty and to determine the points where a given manipulation program might fail.

Laugier, Christian↗

County Land-Use Regulations for Solar Energy Development in Colorado

We present a survey of county-level policies on ground-mounted solar development across Colorado, including both solar-specific ordinances as well as general land-use code that might be applicable in counties without solar-specific policies. This report provides an accessible reference for stakeholders interested in identifying counties with particular regulations or in analyzing the diversity of regulations across Colorado. We defined a set of search criteria to find information on solar definitions and classifications, permitting processes, and use-specific requirements in each of Colorado's 64 counties. With those criteria, we reviewed relevant ordinances, land-use code, and comprehensive and master plans. If any uncertainties were identified, we contacted county officials for clarification. The findings are categorized and mapped to illustrate the distribution of key policies adopted across Colorado's counties on the following topics: solar definitions, solar siting policy documentation, categorization of PV systems for permitting, 1041 permitting, solar on agricultural land, panel height restrictions, fencing requirements, vegetation management, visual impacts, decommissioning plans, and financial assurance for decommissioning. Additionally, we identify and discuss policies that might impact the deployment of agrivoltaics, a dual land use combining both agriculture and solar on the same land, which might not fit neatly in existing zoning definitions and solar-specific regulations.

14 SOLAR ENERGY↗

Stochastic economic dispatch of wind power under uncertainty using clustering-based extreme scenarios

Operation of power systems with high penetrations of renewable energy sources requires tools for robust decision making under uncertainty. Stochastic economic dispatch and stochastic unit commitment are effective techniques for planning and operation under uncertainty, whose effectiveness depends on the cardinality and quality of the scenario set. Here, this article proposes a machine learning method using -means clustering for capturing relevant physical information from a large population of analog scenarios. Extreme scenario samples drawn from the clusters are used in a two-stage stochastic economic dispatch computation. The effectiveness of the proposed approach is assessed on a synthetic 200-bus system with a geographic footprint over Illinois, USA for four months from each season of WIND Toolkit data. The combination of -means clustering with importance sampling is shown to reduce the total operational cost by over 43% compared to sampling from populations based on heuristic clustering-based methods. Additionally, the variability in the mean cost is about 56% lower than the variability using Monte Carlo sampling. Moreover, the operational cost with the presented approach is shown to be close to the cost calculated based on a hindsight exact wind profile, signifying a highly accurate quantification of wind uncertainty by the presented -means clustering based sampling method.

17 WIND ENERGY↗

Transportation Hub Infrastructure Expansion: Decision Support Under Uncertainty

The Athena project (www.athena-mobility.org) has worked to investigate the relationship between the Dallas-Fort Worth Airport (DFW) and the greater Dallas area in order to better understand and therefore better inform future decision-making regarding the critical infrastructure that influence mobility between the airport and the city. Through this work, infrastructure related to curbside pickup and drop-off, parking, public transit, and the road network congestion were identified as critical to the operation of the DFW transportation hub. The infrastructure analysis and expansion aspect of the Athena project is focused on the restructuring of the CTA curb as a hierarchical curb and the building or repurposing of parking infrastructure as the interplay between these two areas. Many sources of uncertainty exist that may impact future airport and transportation hub operations, such as passenger volume growth, population demographic changes over time, electric vehicle (EV) adoption rates, and autonomous vehicle (AV) adoption rates. Due to these sources of uncertainty, we have selected for our research a modeling framework that can capture various types of uncertainty and hedge against those uncertainties in the optimization process. We analyze road network and curb congestion, the rise of transportation networking companies, trends in parking usage, existing policies around this infrastructure, airport revenue streams, and other contributing factors to enable infrastructure decision making with less uncertainty. To accomplish this wholistic analysis, we have developed a novel multi-stage, multi-period stochastic optimization model which considers the airport's decisions from 2025-2045 under different possible future macro trajectories and day-to-day variations in operational conditions captured as "annual representation of operations" scenarios with respective probabilities. This model has also been designed to leverage the outputs of various efforts under the Athena project to create a combined decision framework for infrastructure decisions. These various efforts include the route optimization model, the ASPIRES simulation, the mode choice model, and the SUMO traffic simulation. Our computational experiments of this system at scale have resulted in a working version of our infrastructure model which enables the explicit representation and consideration of various sources of uncertainty in the decision process to enable robust, flexible decision-making. This model has been effectively run on NREL's HPC system, Eagle, with large numbers of stochastic scenarios and shows promise as a scalable tool for robust consideration of uncertainties in airport planning. We have tested our model using 30,240 operational circumstances in total, resulting in a problem with more 200 million variables. This model was solved in several different configurations, and a workflow to simulate the performance of the infrastructure model results was developed and deployed. In general, our results indicate that a combination of remote parking, remote curb infrastructure, and dynamic pricing can generate revenue, reduce emissions, accommodate emerging technologies such as AVs and EVs, and manage airport passenger growth over time. We note the success of the proposed strategy depends on the data collection and forecasting abilities of DFW. We have also seen that the AV adoption by TNCs might necessitate larger amounts of remote curb. The results of this work inform strategies for airport infrastructure decision making, as well as demonstrate the value of an adaptable model, but also indicate that there are avenues remaining where further research would be of value.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling and Optimizing Pumped Storage in a Multi-stage Large Scale Electricity Market under Portfolio Evolution

To leverage the fast-ramping capability of resources to provide great value to the grid, electricity system operators such as the Midcontinent Independent System Operator (MISO) continue to evolve their approaches for integrating energy storage resources, including pumpedstorage hydro (PSH), into the electricity markets. However, new challenges arise in modeling and optimizing these energy-limited resources across multiple market clearing processes and planning studies with uncertainties and imperfect information. For instance, current market practices of PSH owners specifying pumping/generating hours can result in sub-optimal generation dispatch. Letting grid operators optimize PSH with the consideration of multiple operating modes and energy limitation constraints can potentially bring economic benefits to both the system and the PSH owners. However, in multi-stage clearing process of electricity markets, utilizing the PSH flexibility to deal with realized uncertainties can cause deviation in the multi-stage scheduling processes. The resulting financial risks from the schedule deviation may not be acceptable to PSH owners. In addition, to effectively utilize this energy limited resource, the state of charge (SOC) constraints of PSH needs to be continuously optimized and the marginal cost of deviation need to reflect the expected cost to purchase or sell energy at future times to compensate for deviations. This project aims to develop a prototype enhanced PSH model and improved price signals in the multi-stage market clearing process with proper consideration of the unique characteristics of PSH, in order to better align underlying PSH capabilities with evolving grid needs, particularly including the needs for more frequent and larger cycling to manage variability and uncertainty from renewables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Water vapor column abundance retrievals during FIFE

A variation of the modified Langley plot algorithm is reported here and applied to the retrieval of atmospheric water column abundance from a filtered sunphotometer. In this new methodology an absorption data base (LOWTRAN 7) is used to compute a water abundance versus transmittance curve of growth, rather than the square-root dependence previously assumed. Validation of the technique is provided from an uncertainty analysis, and plans to further validate using Fourier transform spectrometers are detailed. The new sunphotometer technique is used to report local column water vapor during the First ISLSCP Field Experiment (FIFE), and comparisons are made with abundances retrieved via FIFE radiosonde observations. The sunphotometer data can best be utilized, however, to in turn validate data from airborne or in-orbit measurements of water vapor. With these flight sensors, horizontal and topographic variability within the scene can be viewed. An example of the airborne data set is given using an image from the airborne visible infrared imaging spectrometer, as acquired on August 31, 1990.

Bruegge, Carol J.↗

Statistical Methodologies to Integrate Experimental and Computational Research

Development of advanced algorithms for simulating engine flow paths requires the integration of fundamental experiments with the validation of enhanced mathematical models. In this paper, we provide an overview of statistical methods to strategically and efficiently conduct experiments and computational model refinement. Moreover, the integration of experimental and computational research efforts is emphasized. With a statistical engineering perspective, scientific and engineering expertise is combined with statistical sciences to gain deeper insights into experimental phenomenon and code development performance; supporting the overall research objectives. The particular statistical methods discussed are design of experiments, response surface methodology, and uncertainty analysis and planning. Their application is illustrated with a coaxial free jet experiment and a turbulence model refinement investigation. Our goal is to provide an overview, focusing on concepts rather than practice, to demonstrate the benefits of using statistical methods in research and development, thereby encouraging their broader and more systematic application.

Parker, P. A.↗

The Completion of a Geosynchronous Earth Orbit Survey with the Eugene Stansbery-Meter Class Autonomous Telescope

The Eugene Stansbery-Meter Class Autonomous Telescope (ES-MCAT) is the primary optical sensor used by the NASA Orbital Debris Program Office (ODPO) to statistically characterize the geosynchronous Earth orbit (GEO) debris environment and support future Orbital Debris Engineering Model (ORDEM) releases. The ES-MCAT completed its first optical survey of the GEO region from 2020 to 2022. The primary goal of this survey was to autonomously collect and process GEO data with calculated photometric and astrometric uncertainties. A pointing plan was developed to provide uniform sampling within the region of interest (ROI) while accounting for predicted downtime due to insufficient observing conditions. Detections are autonomously correlated to the Space Surveillance Network (SSN) catalog to determine if objects are correlated targets (CTs) or uncorrelated targets (UCTs), the latter of which are of interest for modeling the GEO orbital debris environment. To assess the size detection sensitivity over time and monitor the general performance of the telescope’s optics and software, the optical throughput of the system and limiting magnitudes are evaluated on a routine basis. While the telescope’s ability to operate autonomously and remotely allowed for the GEO survey to continue throughout the COVID-19 pandemic, travel restrictions hampered routine cleaning of the optics during this time, and the primary mirror degraded enough to require recoating. The mirror was removed in 2022, concluding the first GEO survey. The primary mirror received a new coating designed to be more robust against the harsh environment surrounding the ES-MCAT’s location on Ascension Island, accounting for experience gained during operations over the first GEO survey. In early 2023, the recoated primary mirror was reinstalled, and the second GEO survey was initiated. The primary goal of the second GEO survey is to characterize the evolving GEO debris environment with updated optics, software, and pointing strategies while allowing for the inclusion of non-GEO regimes or those that are outside of the ROI. While the pointing method implemented in the first survey allowed for adequate coverage of the ROI over two years, it has been improved to include pointings that avoid the Moon’s position and the galactic plane to reduce software processing time and maximize the detection capabilities of fainter objects. This method also accounts for the changing weather patterns throughout the year and reduces coverage gaps in the ROI. Provided the success of the first two-year GEO survey using autonomous operations, the ODPO is actively collaborating with the United States Space Force (USSF) to make the ES-MCAT a contributing sensor to the SSN. This paper presents results from the first GEO survey including magnitude distributions and orbital parameters for CTs and UCTs. Details are provided for the automated processing pipeline and the optical system throughput for the previous and current primary mirror coatings. In addition, an updated strategy for the second GEO survey to optimize coverage over the ROI is discussed, as are preliminary results from the ongoing second survey.

Corbin Cruz↗

The Completion of a Geosynchronous Earth Orbit Survey with the Eugene Stansbery-Meter Class Autonomous Telescope

The Eugene Stansbery-Meter Class Autonomous Telescope (ES-MCAT) is the primary optical sensor used by the NASA Orbital Debris Program Office (ODPO) to statistically characterize the geosynchronous Earth orbit (GEO) debris environment and support future Orbital Debris Engineering Model (ORDEM) releases. The ES-MCAT completed its first optical survey of the GEO region from 2020 to 2022. The primary goal of this survey was to autonomously collect and process GEO data with calculated photometric and astrometric uncertainties. A pointing plan was developed to provide uniform sampling within the region of interest (ROI) while accounting for predicted downtime due to insufficient observing conditions. Detections are autonomously correlated to the Space Surveillance Network (SSN) catalog to determine if objects are correlated targets (CTs) or uncorrelated targets (UCTs), the latter of which are of interest for modeling the GEO orbital debris environment. To assess the size detection sensitivity over time and monitor the general performance of the telescope’s optics and software, the optical throughput of the system and limiting magnitudes are evaluated on a routine basis. While the telescope’s ability to operate autonomously and remotely allowed for the GEO survey to continue throughout the COVID-19 pandemic, travel restrictions hampered routine cleaning of the optics during this time, and the primary mirror degraded enough to require recoating. The mirror was removed in 2022, concluding the first GEO survey. The primary mirror received a new coating designed to be more robust against the harsh environment surrounding the ES-MCAT’s location on Ascension Island, accounting for experience gained during operations over the first GEO survey. In early 2023, the recoated primary mirror was reinstalled, and the second GEO survey was initiated. The primary goal of the second GEO survey is to characterize the evolving GEO debris environment with updated optics, software, and pointing strategies while allowing for the inclusion of non-GEO regimes or those that are outside of the ROI. While the pointing method implemented in the first survey allowed for adequate coverage of the ROI over two years, it has been improved to include pointings that avoid the Moon’s position and the galactic plane to reduce software processing time and maximize the detection capabilities of fainter objects. This method also accounts for the changing weather patterns throughout the year and reduces coverage gaps in the ROI. Provided the success of the first two-year GEO survey using autonomous operations, the ODPO is actively collaborating with the United States Space Force (USSF) to make the ES-MCAT a contributing sensor to the SSN. This paper presents results from the first GEO survey including magnitude distributions and orbital parameters for CTs and UCTs. Details are provided for the automated processing pipeline and the optical system throughput for the previous and current primary mirror coatings. In addition, an updated strategy for the second GEO survey to optimize coverage over the ROI is discussed, as are preliminary results from the ongoing second survey.

Corbin Cruz↗