Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

2022 FORCE Development Status Update

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Framework for Optimization of Resources and Economics (FORCE) is a tool suite developed at Idaho National Laboratory and is dedicated to making robust analyses of IESs easier for analysts and researchers. The report summarizes the improvements and updates to FORCE during the most recent development cycle. Particularly, we demonstrate improvements to user accessibility, stochastic time-series analysis, and vertical integration with the software tools provided in FORCE.

97 MATHEMATICS AND COMPUTING↗

Release a public version of HERON (HERON 2.0) with improved algorithms for the treatment of energy storage

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Holistic Energy Resource Optimization Network (HERON) is a generic software plugin for the Risk Analysis Virtual Environment (RAVEN) to perform stochastic technoeconomic analysis of IES with economic drivers. This report summarizes the updates made to HERON 2.0. Particularly, we demonstrate one of the added features, Function-based Control Mechanics, by comparing a price-based dispatch strategy with the original perfect foresight baselines. Our case studies successfully demonstrate that the model is capable to incorporate artificial control algorithm into the dispatch of IES components. In addition, our results from the price-based strategy indicate that the control strategies of IES components are key to the economic and temporal performance of our model; therefore, more sophisticated dispatch strategies are required to improve the model performance.

25 ENERGY STORAGE↗

Modeling hydro power plants in deregulated electricity markets : integration and application of EMCAS and VALORAGUA.

In this paper, we present details of integrating an agent-based model, Electricity Market Complex Adaptive System (EMCAS) with a hydro-thermal coordination model, VALORAGUA. EMCAS provides a framework for simulating deregulated markets with flexible regulatory structure along with bidding strategies for supply offers and demand bids. VALORAGUA provides longer-term operation plans by optimizing hydro and thermal power plant operation for the entire year. In addition, EMCAS uses the price forecasts and weekly hydro schedules from VALORAGUA to provide intra-week hydro plant optimization for hourly supply offers. The integrated model is then applied to the Iberian electricity market which includes about 111 thermal plants and 38 hydro power plants. We then analyze the impact of hydro plant supply offers on the market prices and ways to minimize the Gencospsila exposure to price risk.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Zwicky Transient Facility: Surveys and Scheduler

Presented here is a novel algorithm for scheduling the observations of time-domain imaging surveys. Our integer linear programming approach optimizes an observing plan for an entire night by assigning targets to temporal blocks, enabling strict control of the number of exposures obtained per field and minimizing filter changes. A subsequent optimization step minimizes slew times between each observation. Our optimization metric self-consistently weights contributions from time-varying airmass, seeing, and sky brightness to maximize the transient discovery rate. We describe the implementation of this algorithm on the surveys of the Zwicky Transient Facility and present its on-sky performance.

79 ASTRONOMY AND ASTROPHYSICS↗

Options for Subscale Maturation of Advanced Reactor Technologies Testing for Nuclear Thermal Propulsion

Several options could be implemented to establish an irradiation testing capability suitable for investigation of the performance of multiple nuclear thermal propulsion fuel elements at prototypic conditions. The prototypic conditions of interest are based on the current needs of the National Aeronautics and Space Administration’s Space Nuclear Power Program. The results of such testing are also intended to reduce the risks currently seen for any future subscale or full-scale ground testing of an engine-reactor system. The optimal solution is dependent upon several factors such as performance, cost, availability, schedule, technology readiness level, and plans for future testing in the SNP Program. Three options, based on different combinations of these factors, are considered in this report.

33 ADVANCED PROPULSION SYSTEMS↗

Multistage robust optimization for the day-ahead scheduling of hybrid thermal-hydro-wind-solar systems

The integration of large-scale uncertain and uncontrollable wind and solar power generation has brought new challenges to the operations of modern power systems. In a power system with abundant water resources, hydroelectric generation with high operational flexibility is a powerful tool to promote a higher penetration of wind and solar power generation. In this paper, we study the day-ahead scheduling of a thermal-hydro-wind-solar power system. The uncertainties of renewable energy generation, including uncertain natural water inflow and wind/solar power output, are taken into consideration. We explore how the operational flexibility of hydroelectric generation and the coordination of thermal-hydro power can be utilized to hedge against uncertain wind/solar power under a multistage robust optimization (MRO) framework. To address the computational issue, mixed decision rules are employed to reformulate the original MRO model with a multi-level structure into a bi-level one. Column-and-constraint generation (C &CG) algorithm is extended into the MRO case to solve the bi-level model. The proposed optimization approach is tested in three real-world cases. Furthermore, the computational results demonstrate the capability of hydroelectric generation to promote the accommodation of uncertain wind and solar power.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Specific recommendations for accurate and direct use of PET-CT in PET guided radiotherapy for head and neck sites

Purpose: To provide specific experience-based guidance and recommendations for centers wishing to develop, validate, and implement an accurate and efficient process for directly using positron emission tomography-computed tomography (PET-CT) for the radiotherapy planning of head and neck cancer patients. Methods: A PET-CT system was modified with hard-top couch, external lasers and radiotherapy immobilization and indexing devices and was subject to a commissioning and quality assurance program. PET-CT imaging protocols were developed specifically for radiotherapy planning and the image quality and pathway tested using phantoms and five patients recruited into an in-house study. Security and accuracy of data transfer was tested throughout the whole data pathway. The patient pathway was fully established and tested ready for implementation in a PET-guided dose-escalation trial for head and neck cancer patients. Results: Couch deflection was greater than for departmental CT simulator machines. An area of high attenuation in the couch generated image artifacts and adjustments were made accordingly. Using newly developed protocols CT image quality was suitable to maintain delineation and treatment accuracy. Upon transfer of data to the treatment planning system a half pixel offset between PET and CT was observed and corrected. By taking this into account, PET to CT alignment accuracy was maintained below 1 mm in all systems in the data pathway. Transfer of structures delineated in the PET fusion software to the radiotherapy treatment planning system was validated. Conclusions: A method to perform direct PET-guided radiotherapy planning was successfully validated and specific recommendations were developed to assist other centers. Of major concern is ensuring that the quality of PET and CT data is appropriate for radiotherapy treatment planning and on-treatment verification. Couch movements can be compromised, bore-size can be a limitation for certain immobilization techniques, laser positioning may affect setup accuracy and couch deflection may be greater than scanners dedicated to radiotherapy. The full set of departmental commissioning and routine quality assurance tests applied to radiotherapy CT simulators must be carried out on the PET-CT scanner. CT image quality must be optimized for radiotherapy planning whilst understanding that the appearance will differ between scanners and may affect delineation. PET-CT quality assurance schedules will need to be added to and modified to incorporate radiotherapy quality assurance. Methods of working for radiotherapy and PET staff will change to take into account considerations of both parties. PET to CT alignment must be subject to quality control on a loaded and unloaded couch preferably using a suitable emission phantom, and tested throughout the whole data pathway. Data integrity must be tested throughout the whole pathway and a system included to verify that delineated structures are transferred correctly. Excellent multidisciplinary team communication and working is vital, and key staff members on both sides should be specifically dedicated to the project. Patient pathway should be clearly devised to optimize patient care and the resources of all departments. Recruitment of a cohort of patients into a methodology study is valuable to test the quality assurance methods and pathway.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

This study describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by 12.30B and 10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by 10.70B, while increases the annual surplus by 9.32B in comparison to the standalone case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SU-F-19A-08: Optimal Time Release Schedule of In-Situ Drug Release During Permanent Prostate Brachytherapy

Purpose: Permanent prostate brachytherapy spacers can be used to deliver sustained doses of radiosentitizing drug directly to the target, in order to enhance the radiation effect. Implantable nanoplatforms for chemo-radiation therapy (INCeRTs) have a maximum drug capacity and can be engineered to control the drug release schedule. The optimal schedule for sensitization during continuous low dose rate irradiation is unknown. This work studies the optimal release schedule of drug for both traditional sensitizers, and those that work by suppressing DNA repair processes. Methods: Six brachytherapy treatment plans were used to model the anatomy, implant geometry and calculate the spatial distribution of radiation dose and drug concentrations for a range of drug diffusion parameters. Three state partial differential equations (cells healthy, damaged or dead) modeled the effect of continuous radiation (radiosensitivities α,β) and cellular repair (time tr) on a cell population. Radiosensitization was modeled as concentration dependent change in α,β or tr which with variable duration under the constraint of fixed total drug release. Average cell kill was used to measure effectiveness. Sensitization by means of both enhanced damage and reduced repair were studied. Results: Optimal release duration is dependent on the concentration of radiosensitizer compared to the saturation concentration (csat) above which additional sensitization does not occur. Long duration drug release when enhancing α or β maximizes cell death when drug concentrations are generally over csat. Short term release is optimal for concentrations below saturation. Sensitization by suppressing repair has a similar though less distinct trend that is more affected by the radiation dose distribution. Conclusion: Models of sustained local radiosensitization show potential to increase the effectiveness of radiation in permanent prostate brachytherapy. INCeRTs with high drug capacity produce the greatest benefit with drug release over weeks. If in-vivo drug concentrations are not able to approach saturation concentration, durations of days is optimal. DOD 1R21CA16977501; A. David Mazzone Awards Program 2012PD164.

60 APPLIED LIFE SCIENCES↗

Prospective study evaluating the use of IV contrast on IMRT treatment planning for lung cancer

Purpose: To investigate the impact of exclusively using intravenous (IV) contrast x-ray computed tomography (CT) scans on lung cancer intensity-modulated radiation therapy (IMRT) treatment planning. Methods: Eight patients with lung cancer (one small cell, seven nonsmall cell) scheduled to receive IMRT consented to acquisition of simulation CT scans with and without IV contrast. Clinical treatment plans optimized on the noncontrast scans were recomputed on contrast scans and dose coverage was compared, along with the γ passing rates. Results: IV contrast enhanced scans provided better target and critical structure conspicuity than the noncontrast scans. Using noncontrast scan as a reference, the median absolute/relative differences in mean, maximum, and minimum doses to the planning target volume (PTV) were −4.5 cGy/−0.09%, 41.1 cGy/0.62%, and −19.7 cGy/−0.50%, respectively. Regarding organs-at-risk (OARs), the median absolute/relative differences of maximum dose to heart was −13.3 cGy/−0.32%, to esophagus was −63.4 cGy/−0.89%, and to spinal cord was −16.3 cGy/−0.46%. The median heart region of interest CT Hounsfield Unit (HU) number difference between noncontrast and contrast scans was 136.4 HU (range, 94.2–161.8 HU). Subjectively, the regions with absolute dose differences greater than 3% of the prescription dose were small and typically located at the patient periphery and/or at the beam edges. The median γ passing rate was 0.9981 (range, 0.9654–0.9999) using 3% absolute dose difference/3 mm distance-to-agreement criteria. Overall, all evaluated cases were found to be clinically equivalent. Conclusions: PTV and OARs dose differences between noncontrast and contrast scans appear to be minimal for lung cancer patients undergoing IMRT. Using IV contrast scans as the primary simulation dataset could increase treatment planning efficiency and accuracy by avoiding unnecessary scans, manually region overriding, and planning errors caused by nonperfect image registrations.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Facility Utilization and Risk Analysis for Remediation of Legacy Transuranic Waste at the Savannah River Site - 13572

Savannah River Nuclear Solutions (SRNS) completed the Accelerated TRU Project for remediating legacy waste at the Savannah River Site with significant cost and schedule efficiencies due to early identification of resources and utilization of risk matrices. Initial project planning included identification of existing facilities that could be modified to meet the technical requirements needed for repackaging and remediating the waste. The project schedule was then optimized by utilization of risk matrices that identified alternate strategies and parallel processing paths which drove the overall success of the project. Early completion of the Accelerated TRU Project allowed SRNS to pursue stretch goals associated with remediating very difficult TRU waste such as concrete casks from the hot cells in the Savannah River National Laboratory. Project planning for stretch goals also utilized existing facilities and the risk matrices. The Accelerated TRU project and stretch goals were funded under the American Recovery and Reinvestment Act (ARRA). (authors)

54 ENVIRONMENTAL SCIENCES↗

Neoadjuvant Sandwich Treatment With Oxaliplatin and Capecitabine Administered Prior to, Concurrently With, and Following Radiation Therapy in Locally Advanced Rectal Cancer: A Prospective Phase 2 Trial

Purpose: Systemic failure remains the major challenge in management of locally advanced rectal cancer (LARC). To optimize the timing of neoadjuvant treatment and enhance systemic control, we initiated a phase 2 trial to evaluate a new strategy of neoadjuvant sandwich treatment, integrating induction chemotherapy, concurrent chemoradiation therapy, and consolidation chemotherapy. Here, we present preliminary results of this trial, reporting the tumor response, toxicities, and surgical complications. Methods and Materials: Fifty-one patients with LARC were enrolled, among which were two patients who were ineligible because of distant metastases before treatment. Patients were treated first with one cycle of induction chemotherapy consisting of oxaliplatin, 130 mg/m² on day 1, with capecitabine, 1000 mg/m² twice daily for 14 days every 3 weeks (the XELOX regimen), followed by chemoradiation therapy, 50 Gy over 5 weeks, with the modified XELOX regimen (oxaliplatin 100 mg/m²), and then with another cycle of consolidation chemotherapy with the XELOX regimen. Surgery was performed 6 to 8 weeks after completion of radiation therapy. Tumor responses, toxicities, and surgical complications were recorded. Results: All but one patent completed the planned schedule of neoadjuvant sandwich treatment. Neither life-threatening blood count decrease nor febrile neutropenia were observed. Forty-five patents underwent optimal surgery with total mesorectal excision (TME). Four patients refused surgery because of clinically complete response. There was no perioperative mortality in this cohort. Five patients (11.1%) developed postoperative complications. Among the 45 patients who underwent TME, pathologic complete response (pCR), pCR or major regression, and at least moderate regression were achieved in 19 (42.2%), 37 (82.2%), and 44 patients (97.8%), respectively. Conclusions: Preliminary results suggest that the strategy of neoadjuvant sandwich treatment using XELOX regimen as induction, concomitant, and consolidation chemotherapy to the conventional radiation is well tolerated. The strategy is highly effective in terms of pCR and major regression, which warrants further investigation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Multi-Timescale Optimal Operation Framework for Integrated Economic and Reliability Analysis of Hybrid Power Plants

This paper introduces a hierarchical modeling framework for hybrid power plants (HPP) to facilitate the operation of HPP in power systems similar to conventional generators (Congens) in the integrated multi-timescale optimal operation framework. To consider the uncertainties of HPP renewable power in the day-ahead scheduling, distributionally robust optimization (DRO) is used. To ensure that the state-of-charge (SOC) of energy storage systems in HPPs aligns closely with the planned value for long-term reliability, real-time SOC management is incorporated. In addition, an adjustable real-time control is designed for the robust delivery of HPP real-time services. Case studies performed on a revised IEEE 39-bus system demonstrate the effectiveness of the proposed framework for HPP operation. Simulation results highlight that the proposed framework not only can help operators schedule HPP similar to Congens in varying weather conditions but can also maintain the frequency reliability of the system.

frequency stability↗

Operational Excellence through Schedule Optimization and Production Simulation of Application Specific Integrated Circuits.

Upcoming weapon programs require an aggressive increase in Application Specific Integrated Circuit (ASIC) production at Sandia National Laboratories (SNL). SNL has developed unique modeling and optimization tools that have been instrumental in improving ASIC production productivity and efficiency, identifying optimal operational and tactical execution plans under resource constraints, and providing confidence in successful mission execution. With ten products and unprecedented levels of demand, a single set of shared resources, highly variable processes, and the need for external supplier task synchronization, scheduling is an integral part of successful manufacturing. The scheduler uses an iterative multi-objective genetic algorithm and a multi-dimensional performance evaluator. Schedule feasibility is assessed using a discrete event simulation (DES) that incorporates operational uncertainty, variability, and resource availability. The tools provide rapid scenario assessments and responses to variances in the operational environment, and have been used to inform major equipment investments and workforce planning decisions in multiple SNL facilities.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

Information-Driven Inspections

New uranium enrichment capacity is being built worldwide in response to perceived shortfalls in future supply. To meet increasing safeguards responsibilities with limited resources, the nonproliferation community is exploring next-generation concepts to increase the effectiveness and efficiency of safeguards, such as advanced technologies to enable unattended monitoring of nuclear material. These include attribute measurement technologies, data authentication tools, and transmission and security methods. However, there are several conceptual issues with how such data would be used to improve the ability of a safeguards inspectorate such as the International Atomic Energy Agency (IAEA) to reach better safeguards conclusions regarding the activities of a State. The IAEA is pursuing the implementation of information-driven safeguards, whereby all available sources of information are used to make the application of safeguards more effective and efficient. Data from continuous, unattended monitoring systems can be used to optimize on-site inspection scheduling and activities at declared facilities, resulting in fewer, better inspections. Such information-driven inspections are the logical evolution of inspection planning - making use of all available information to enhance scheduled and randomized inspections. Data collection and analysis approaches for unattended monitoring systems can be designed to protect sensitive information while enabling information-driven inspections. A number of such inspections within a predetermined range could reduce inspection frequency while providing an equal or greater level of deterrence against illicit activity, all while meeting operator and technology holder requirements and reducing inspector and operator burden. Three options for using unattended monitoring data to determine an information-driven inspection schedule are to (1) send all unattended monitoring data off-site, which will require advances in data analysis techniques to determine optimal thresholds; (2) have all separate unattended systems send individual go/no-go signals, allowing the inspectorate to know exactly which systems are exceeding their thresholds; and (3) develop a data aggregation system with attribute monitoring algorithms that would send a single go/no-go or other status signal off-site. Since the data in all of these options are used to inform on-site inspections (which will revert to randomized inspections if no thresholds are reached), the thresholds for the unattended systems can be set much closer to declared operating parameters than in current unattended monitoring systems.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Evaluating Economic Impact: An Investment Tool for Large Language Model Integration in Workweek Management

This paper explores the development and application of an investment tool designed to quantify the costs and potential savings associated with integrating large language models (LLMs) into work week management optimization (WMO) within the nuclear industry. LLMs, with their advanced natural language processing capabilities, can significantly enhance various aspects of work management, such as problem identification, prioritization, planning, scheduling, information retrieval, and information summary. Our investment tool focuses on evaluating the return on investment (ROI) for LLM applications in WMO by considering four pivotal decision factors: model selection, application, user training, and hosting options. This paper details the development and implementation of the ROI model and illustrates its application through multiple case studies, analyzing the impact of different variables, such as work time saved, number of requests, and model performance, on the computed ROI over two years. The computed ROI is also compared over different hosting solutions. Our findings indicate that ROI increases with enhanced work time savings and optimal request load but can decline with high request volumes or increased model costs. This model aids decision-makers in the nuclear industry by providing a structured approach to assessing the economic viability and potential savings from integrating LLMs into WMO processes.

97 - MATHEMATICS AND COMPUTING↗

Evaluating Economic Impact: An Investment Tool for Large Language Model Integration in Workweek Management

This paper explores the development and application of an investment tool designed to quantify the costs and potential savings associated with integrating large language models (LLMs) into work week management optimization (WMO) within the nuclear industry. LLMs, with their advanced natural language processing capabilities, can significantly enhance various aspects of work management, such as problem identification, prioritization, planning, scheduling, information retrieval, and information summary. Our investment tool focuses on evaluating the return on investment (ROI) for LLM applications in WMO by considering four pivotal decision factors: model selection, application, user training, and hosting options. This paper details the development and implementation of the ROI model and illustrates its application through multiple case studies, analyzing the impact of different variables, such as work time saved, number of requests, and model performance, on the computed ROI over two years. The computed ROI is also compared over different hosting solutions. Our findings indicate that ROI increases with enhanced work time savings and optimal request load but can decline with high request volumes or increased model costs. This model aids decision-makers in the nuclear industry by providing a structured approach to assessing the economic viability and potential savings from integrating LLMs into WMO processes.

99 - GENERAL AND MISCELLANEOUS↗