Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Micromovements and discomfort associated with flight mission with helmet operation tasks with different levels of cognitive workload

When performing stationary tasks under elevated cognitive workload, individuals must perform continual muscle contractions to maintain stability of the body, resulting in fatigue of the postural muscles. When the muscles perform these contractions in a prolonged manner, the body potentially responds through small changes in body movements—micromovements that may lead to discomfort. The study purpose was to evaluate impact of cognitive load on micromovements. The micromovements were measured during three different cognitive workloads; low, medium, and high. The NASA-TLX score was used to evaluate the perceived mental workload and discomfort was assessed by visual analog scale. In total, 60 subjects (30 males and 30 females) were recruited and performed cognitive tasks that simulated flight operations such as changing the radio frequency based on air traffic control messages, balancing the fuel levels in simulated fuel tanks, and aiming a reticle in a designated moving target using the cyclic control. Cognitive load was defined by the frequency of events. Micromovements were defined by changes in the center of pressure (COP) of the seat pan and COP standard deviation. It was found that the high cognitive workloads had the highest NASA-TLX scores including mental demands, temporal demands, and effort. The neck area had the highest overall levels of discomfort followed by upper back. The highest standard deviation for COP shift and number of micromovements occurred for medium cognitive workloads. In conclusion, while there were some interesting trends, few trends reached a statistical significance due to high variability among subjects for the outcome variables.

60 APPLIED LIFE SCIENCES↗

Efficient Mixed-Precision Matrix Factorization of the Inverse Overlap Matrix in Electronic Structure Calculations with AI-Hardware and GPUs

In recent years, a new kind of accelerated hardware has gained popularity in the artificial intelligence (AI) community which enables extremely high-performance tensor contractions in reduced precision for deep neural network calculations. In this article, we exploit Nvidia Tensor cores, a prototypical example of such AI-hardware, to develop a mixed precision approach for computing a dense matrix factorization of the inverse overlap matrix in electronic structure theory, S –1 . This factorization of S –1 , written as ZZT = S –1 , is used to transform the general matrix eigenvalue problem into a standard matrix eigenvalue problem. Here we present a mixed precision iterative refinement algorithm where Z is given recursively using matrix–matrix multiplications and can be computed with high performance on Tensor cores. To understand the performance and accuracy of Tensor cores, comparisons are made to GPU-only implementations in single and double precision. Additionally, we propose a nonparametric stopping criteria which is robust in the face of lower precision floating point operations. The algorithm is particularly useful when we have a good initial guess to Z, for example, from previous time steps in quantum-mechanical molecular dynamics simulations or from a previous iteration in a geometry optimization.

36 MATERIALS SCIENCE↗

Stochastic tensor contraction for quantum chemistry

Many computational methods in ab initio quantum chemistry are formulated in terms of high-order tensor contractions, whose cost determines the size of system that can be studied. We introduce stochastic tensor contraction to perform such operations with greatly reduced cost, and present its application to the gold-standard quantum chemistry method, coupled cluster theory with up to perturbative triples. For total energy errors more stringent than chemical accuracy, we reduce the computational scaling to that of mean-field theory, while starting to approach the mean-field absolute cost, thereby challenging the existing cost-to-accuracy landscape. Benchmarks against state-of-the-art local correlation approximations further show that we achieve an order-of-magnitude improvement in both total computation time and error, with significantly reduced sensitivity to system dimensionality and electron delocalization. We conclude that stochastic tensor contraction is a powerful computational primitive to accelerate a wide range of quantum chemistry.

Chemical Physics (physics.chem-ph)↗

A generalized Flory-Stockmayer kinetic theory of connectivity percolation and rigidity percolation of cytoskeletal networks

Actin networks are essential for living cells to move, reproduce, and sense their environments. The dynamic and rheological behavior of actin networks is modulated by actin-binding proteins such as α-actinin, Arp2/3, and myosin. There is experimental evidence that actin-binding proteins modulate the cooperation of myosin motors by connecting the actin network. In this work, we present an analytical mean field model, using the Flory-Stockmayer theory of gelation, to understand how different actin-binding proteins change the connectivity of the actin filaments as the networks are formed. We follow the kinetics of the networks and estimate the concentrations of actin-binding proteins that are needed to reach connectivity percolation as well as to reach rigidity percolation. We find that Arp2/3 increases the actomyosin connectivity in the network in a non-monotonic way. We also describe how changing the connectivity of actomyosin networks modulates the ability of motors to exert forces, leading to three possible phases of the networks with distinctive dynamical characteristics: a sol phase, a gel phase, and an active phase. Thus, changes in the concentration and activity of actin-binding proteins in cells lead to a phase transition of the actin network, allowing the cells to perform active contraction and change their rheological properties.

59 BASIC BIOLOGICAL SCIENCES↗

Financing Federal Microgrids [Slides]

A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. When components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs, implementation by one of several privately financed federal procurement mechanisms is possible. However, it is typically difficult to achieve enough savings and avoided costs to cover the design, equipment, and installation of certain microgrid components that are required to integrate the system. This presentation explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Ally in Your Corner: Benefits of Using Owner's Representatives

This short guide provides prospective ESPC customers with key considerations for retaining an owner's representative ("owner’s rep"), specifically regarding recommended areas of competency and qualifications. It also provides a summary of resources to help with finding or soliciting owner's rep services. This information may also be valuable for ESPC program administrators considering how to promote the use of owner’s reps for projects in their state.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Utility Partnerships & Clean Production of Natural Gas

Karen Thomas from NREL will discuss utility partnership programs with the federal government under the Federal Energy Management Program (FEMP) of the Department of Energy (DOE). These programs offer a way for a utility to partner with federal agencies. She will describe the federal government's ability to work directly with their serving natural gas utility to implement successful energy efficiency projects. Also, Jill Engel-Cox from NREL's Joint Institute for Strategic Energy Analysis will briefly share their analysis to identify opportunities to reduce emissions and increase efficiency of the production and delivery of natural gas.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Leveraging Bond Financing to Support Energy Efficiency and Renewable Energy Goals: A Resource Summary for State and Local Governments

This resource summary is for state, local, and K-12 energy professionals and non-finance experts seeking to understand how bonds can be used to pay for energy efficiency and renewable energy projects and initiatives. The objective of the resource summary is to inform energy professionals, so they can more confidently and efficiently discuss bond financing with public finance officers and executive leadership as an option for supporting energy goals.

Energy Savings Performance Contracting, Revolving ↗

Financing and Implementing Resilience Products

This fact sheet defines common resilience improvements and provides key considerations for identifying, prioritizing, and implementing these improvements across a commercial building portfolio. It also discusses common barriers to resilience improvements and reviews various third-party financing solutions that can help overcome these barriers.

CHP↗

Kokkos Tensor Library

Explore the source record for details and available documents.

97 MATHEMATICS AND COMPUTING↗

Electrification in an ESPC: Flatirons Campus Electrification

Overview of the steps taken to electrify the Flatirons Campus. Begins with a review of the current equipment in the facilities, NREL's approach to net zero emissions, and our work with an ESPC. Discusses approach to doing electrification with an ESPC. Summary of the equipment being considered for electrification of the four buildings at Flatirons Campus.

building↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Linear-Complexity Tensor Butterfly Algorithm for Compressing High-Dimensional Oscillatory Integral Operators

This paper presents a multilevel tensor compression algorithm called tensor butterfly algorithm for efficiently representing large-scale and high-dimensional oscillatory integral operators, including Green's functions for wave equations and integral transforms such as Radon transforms and Fourier transforms. The proposed algorithm leverages a tensor extension of the so-called complementary low-rank property of existing matrix butterfly algorithms. The algorithm partitions the discretized integral operator tensor into subtensors of multiple levels and factorizes each subtensor at the middle level as a Tucker-type interpolative decomposition, whose factor matrices are formed in a multilevel fashion. For a d-dimensional (d > 1) integral operator discretized into a 2d-mode tensor with n2d entries, the overall CPU time and memory requirement scale as O(nd), in stark contrast to the O(nd log n) complexity of existing matrix algorithms such as matrix butterfly algorithms and fast Fourier transforms (FFTs), where n is the number of points per direction. When comparing with other tensor algorithms such as quantized tensor train (QTT), the proposed algorithm also shows superior CPU and memory performance for tensor contraction. Remarkably, the tensor butterfly algorithm can efficiently model high-frequency Green's function interactions between two unit cubes, each spanning 512 wavelengths per direction, which represents problems of scale over 512× larger than that existing butterfly algorithms can handle, with the same amount of computation resources. On the other hand, for a problem representing 64 wavelengths per direction, which is the largest size existing algebraic matrix algorithms can handle, our tensor butterfly algorithm exhibits 200x speedups and 30× memory reduction compared with existing ones. Moreover, the tensor butterfly algorithm also permits O(nd)-complexity FFTs and Radon transforms up to d = 6 dimensions.

Kielstra, P Michael↗

Assessment of San Onofre Concrete Susceptibility Against Irradiation Damage

The work performed under this contract covers the characterization of unirradiated concrete specimens cored from the walls of the steam generator room of the SONGS Unit 2, currently under decommission. This report documents the extensive set of characterization conducted at the Oak Ridge National Laboratory, at the University of Tennessee, Knoxville, at the Ohio State University, and at ALG Global. The susceptibility of irradiation-induced damage in concrete is governed by the exposure level (fast neutron fluence > 10 19 n.cm -2 at E > 0.1 MeV) and the mineralogy of the aggregates (high quartz content and chemical heterogeneity of the assemblage). Both conditions are met for the SONGS concrete biological shield. Hence, harvesting in-service irradiated concrete from the SONGS Unit 2 or 3 biological shield is currently an unparalleled opportunity to study the flux effects of neutron irradiation.

36 MATERIALS SCIENCE↗

Two-Way Option Contracts That Facilitate Adaptive Water Reallocation in the Western United States

Many water markets in the western United States (U.S.) have the ability to reallocate water temporarily during drought, often as short-term water rights leases from lower value irrigated activities to higher value urban uses. Regulatory approval of water transfers, however, typically takes time and involves high transaction costs that arise from technical and legal analyses, discouraging short-term leasing. This leads municipalities to protect against drought-related shortfalls by purchasing large volumes of infrequently used permanent water rights. High transaction costs also result in municipal water rights rarely being leased back to irrigators in wet or normal years, reducing agricultural productivity. This research explores the development of a multi-year two-way option (TWO) contract that facilitates leasing from agricultural-to-urban users during drought and leasing from urban-to agricultural users during wet periods. The modeling framework developed to assess performance of the TWO contracts includes consideration of the hydrologic, engineered, and institutional systems governing the South Platte River Basin in Colorado where there is growing competition for water between municipalities (e.g., the city of Boulder) and irrigators. The modeling framework is built around StateMod, a network-based water allocation model used by state regulators to evaluate water rights allocations and potential rights transfers. Results suggest that the TWO contracts could allow municipalities to maintain supply reliability with significantly reduced rights holdings at lower cost, while increasing agricultural productivity in wet and normal years. Additionally, the TWO contracts provide irrigators with additional revenues via net payments of option fees from municipalities.

54 ENVIRONMENTAL SCIENCES↗

Application Results on Early Exascale Hardware

This Exascale Computing Project (ECP) milestone report summarizes the status of 27 of the 31 ECP Applications Development (AD) subprojects at the end of FY21. In November and December of 2021, a comprehensive assessment of AD projects was conducted by the ECP leadership along with external subject matter experts (SMEs). (NNSA application projects are reviewed separately using the ASC milestone process.) The AD review committee—consisting of the AD lead, AD deputy, Level 3 (L3), and at least one external project SME—was tasked with evaluating each project’s progress relative to ECP project goals specified in the FY21 timeline. Key areas of focus were code maturity and performance on pre-exascale systems, an in-depth analysis of final key performance parameter (KPP) verification contracts, and future R&D priorities in the final year of ECP and beyond. As such, this report contains not only an accurate snapshot of each subproject’s current status but also represents a broad account of successes and challenges in porting large scientific applications to DOE’s next-generation high-performance computing architectures – the Frontier and Aurora systems.

97 MATHEMATICS AND COMPUTING↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗