Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Large Space Telescope - Orbital crew EV maintenance operations

The paper shows that orbital EV maintenance by the crew has a tremendous impact on several areas of the program, including operations, Shuttle interfaces, support equipment rendezvous and berthing, checkout and verification, levels of servicing achievable, logistics and spares and scientific instruments in order to permit changeout and possible future refurbishment. To achieve on-orbit EV maintenance, such challenges as designing for suited-astronaut access to all subsystem equipment elements, minimization for contamination, handling of extremely sensitive instruments, development of translation techniques, and use of existing GFE and hardware must be faced early in the preliminary design and operations analysis phases. All studies to date indicate that on-orbit EV manned maintenance of the LST (Large Space Telescope) is not only feasible but can be designed to be readily within the capability of the EV functioning astronaut. Both 1-g and neutral buoyancy man-in-the-loop simulations further support this point.

Fisher, H. T.↗

Perturbations and Recovery in the Gateway Near Rectilinear Halo Orbit

The Gateway and CAPSTONE spacecraft are planned to orbit the Moon in a Near Rectilinear Halo Orbit (NRHO) that experiences a 9:2 resonance with the lunar synodic period. Disturbances applied to spacecraft in this NRHO must be corrected to achieve a reasonable lifetime in orbit. This investigation explores the variations between a spacecraft operating under nominal orbit maintenance and the baseline NRHO. The effects of perturbations on an unmaintained spacecraft are examined, with a focus on the time to depart the NRHO. Finally, the costs of correcting disturbances of varying magnitudes are computed using a simple but robust orbit maintenance algorithm.

Diane C. Davis↗

In-Flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit (LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end June 30, 2016. To date the IPS has been operated for approximately 48,458 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through the completion of Dawn’s primary mission.

Garner, Charles E.↗

In-flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit )LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end in the summer of 2016. To date the IPS has been operated for over 48,454 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through June 2016.

Garner, Charles E.↗

Large Space Telescope external interfaces

Key interfaces are described for all LST mission phases: ground test and integration, prelaunch and launch operations, ascent, deployment, operations, on-orbit maintenance, retrieval, deorbit and landing, and refurbishment. These interfaces can be categorized as test and integration, launch operations, Shuttle, data, and mission operations. The interface with the Shuttle and the Shuttle crew is emphasized here because the Shuttle allows a new capability: on-orbit maintenance and ground return. The LST will communicate with the ground elements of the LST system through a space link by means of the Tracking Data Relay Satellite System or directly to the stations of the Space Tracking and Data Network.

Collart, R. E.↗

Micro Electric Propulsion Feasibility

Miniature, 50 kg class, strategic satellites intended for extended deployment in space require an on-board propulsion capability to perform needed attitude control adjustments and drag compensation maneuvers. Even on such very small spacecraft, these orbit maintenance functions can be significant and result in a substantial propellant mass requirement. Development of advanced propulsion technology could reduce this propellant mass significantly, and thereby maximize the payload capability of these spacecraft. In addition, spacecraft maneuverability could be enhanced and/or multi-year mission lifetimes realized. These benefits cut spacecraft replacement costs, and reduce services needed to maintain the launch vehicles. For SDIO brilliant pebble spacecraft, a miniaturized hydrazine propulsion system provides both boost and divert thrust control. This type of propulsion system is highly integrated and is capable of delivering large thrust levels for short time periods. However, orbit maintenance functions such as drag make-up require only very small velocity corrections. Using the boost and/or divert thrusters for these small corrections exposes this highly integrated propulsion system to continuous on/off cycling and thereby increases the risk of system failure. Furthermore, since drag compensation velocity corrections would be orders of magnitude less than these thrusters were designed to deliver, their effective specific impulse would be expected to be lower when operated at very short pulse lengths. The net result of these effects would be a significant depletion of the on-board hydrazine propellant supply throughout the mission, and a reduced propulsion system reliability, both of which would degrade the interceptors usefulness. In addition to SDIO brilliant pebble spacecraft, comparably small spacecraft can be anticipated for other future strategic defense applications such as surveillance and communication. For such spacecraft, high capability and reliability, minimal detectability and low cost are requirements. All these miniature spacecraft share a common characteristic: because of their on-board electronic equipment they have, by design, solar order 50-100 W. In a relative sense, such spacecraft are power rich when compared to other larger spacecraft. This power rich situation is offset by very tight mass budgets, which make reductions in propellant mass requirements a key issue in meeting overall spacecraft minimum mass goals. In principle, power rich and propellant poor brilliant pebbles class spacecraft can benefit from using high specific impulse electric propulsion to reduce chemical propellant mass requirements. However, at power levels of order 50 W, arcjets cannot be made to function, ion thrusters are too complex and heavy and resistojets have too low a specific impulse. Recognizing these capability limitations in existing electric propulsion technology, the SDIO/IST sponsored the Phase I SBIR Micro Electric Propulsion (MEP) thruster study described in this report. The objective of this study was to examine the feasibility of developing a very simple, low mass and small volume, electric thruster for operation on hydrazine at less than 100 W of input power. The feasibility of developing such a MEP thruster was successfully demonstrated by EPL by the discovery of a novel plasma acceleration process. The sections in this report summarize the approach, test results and major accomplishments of this proof-of-concept program.

Aston, Graeme↗

An analysis of low-thrust, resistojet reboost for the Space Station

This paper presents results of an analysis of low-thrust orbit maintenance of the Space Station. Propellant requirements and transfer times are given for reboost of the station through various altitude increments. The reboost can readily be accomplished with thrust levels that subject the station to an acceleration of less than the desired upper limit of 10 to the -5th g's. The variation in time and the probabilistic aspect of the predicted upper-atmospheric density as well as the variation in time of sun-pointing drag areas were taken into account. Estimates of the propellant requirements at different times during an 11-year solar cycle are given. It is shown that the amount of CO2 available from the station life-support system is sufficient, over most of the solar cycle, to provide the propellant for a resistojet orbit-maintenance system.

Penko, P. F.↗

Electric Propulsion for Low Earth Orbit Constellations

Hall Effect electric propulsion was evaluated for orbit insertion, satellite repositioning, orbit maintenance and de-orbit applications for a sample low earth orbit satellite constellation. Since the low masses of these satellites enable multiple spacecraft per launch, the ability to add spacecraft to a given launch was used as a figure of merit. When compared to chemical propulsion, the Hall thruster system can add additional spacecraft per launch using planned payload power levels. One satellite can be added to the assumed four satellite baseline chemical launch without additional mission times. Two or three satellites may be added by providing part of the orbit insertion with the Hall system. In these cases orbit insertion times were found to be 35 and 62 days. Depending on the electric propulsion scenario, the resulting launch vehicle savings is nearly two, three or four Delta 7920 launch vehicles out of the chemical baseline scenarios eight Delta 7920 launch vehicles.

Oleson, Steven R.↗

Electric Propulsion for Low Earth Orbit Constellations

Hall effect electric propulsion was evaluated for orbit insertion, satellite repositioning, orbit maintenance and de-orbit applications for a sample low earth orbit satellite constellation. Since the low masses of these satellites enable multiple spacecraft per launch, the ability to add spacecraft to a given launch was used as a figure of merit. When compared to chemical propulsion, the Hall thruster system can add additional spacecraft per launch using planned payload power levels. One satellite can be added to the assumed four satellite baseline chemical launch without additional mission times. Two or three satellites may be added by providing part of the orbit insertion with the Hall system. In these cases orbit insertion times were found to be 35 and 62 days. Depending, on the electric propulsion scenario, the resulting launch vehicle savings is nearly two, three or four Delta 7920 launch vehicles out of the chemical baseline scenario's eight Delta 7920 launch vehicles.

Oleson, Steven R.↗

Power and Propulsion Element (PPE) Spacecraft Reference Trajectory Document

This document captures example reference trajectories for the PPE including a reference delivery orbit and orbit maintenance, an example cislunar orbit transfer and end-of-mission (EOM) disposal trajectory. The flexibility of electric propulsion offers, by its low thrust nature, multiple different trajectory options to transfer from one orbit to another. The trajectories captured in this document are representative examples of a low thrust transfer from the NRHO and to multiple cislunar orbits. This document provides a consistent set of data from mission design to be used in the design of the vehicle capable of flying the trajectory described. The data in this document will be used to create conference papers. In order to do so, we are ending this document through for external release.

Melissa L Mcguire↗

Just in Time in Space or Space Based JIT

Our satellite systems are mega-buck items. In today's cost conscious world, we need to reduce the overall costs of satellites if our space program is to survive. One way to accomplish this would be through on-orbit maintenance of parts on the orbiting craft. In order to accomplish maintenance at a low cost I advance the hypothesis of having parts and pieces (spares) waiting. Waiting in the sense of having something when you need it, or just-in-time. The JIT concept can actually be applied to space processes. Its definition has to be changed just enough to encompass the needs of space. Our space engineers tell us which parts and pieces the satellite systems might be needing once in orbit. These items are stored in space for the time of need and can be ready when they are needed -- or Space Based JIT. When a system has a problem, the repair facility is near by and through human or robotics intervention, it can be brought back into service. Through a JIT process, overall system costs could be reduced as standardization of parts is built into satellite systems to facilitate reduced numbers of parts being stored. Launch costs will be contained as fewer spare pieces need to be included in the launch vehicle and the space program will continue to thrive even in this era of reduced budgets. The concept of using an orbiting parts servicer and human or robotics maintenance/repair capabilities would extend satellite life-cycle and reduce system replacement launches. Reductions of this nature throughout the satellite program result in cost savings.

VanOrsdel, Kathleen G.↗

Design and implementation of satellite formations and constellations

The direction to develop small low cost spacecraft has led many scientists to recognize the advantage of flying spacecraft in constellations and formations to achieve the correlated instrument measurements formerly possible only by flying many instruments on a single large platform. Yet, constellations and formation flying impose additional complications on orbit selection and orbit maintenance, especially when each spacecraft has its own orbit or science requirements. The purpose of this paper is to develop an operational control method for maintenance of these missions. Examples will be taken from the Earth Observing-1 (EO-1) spacecraft that is part of the New Millennium Program (NMP) and from proposed Earth System Science Program Office (ESSPO) constellations. Results can be used to determine the appropriateness of constellations and formation flying for a particular case as well as the operational impacts. Applications to the ESSPO and NMP are highly considered in analysis and applications. After constellation and formation analysis is completed, implementation of a maneuver maintenance strategy becomes the driver. Advances in technology and automation by GSFC's Guidance, Navigation, and Control Center allow more of the burden of the orbit selection and maneuver maintenance to be automated and ultimately placed onboard the spacecraft, mitigating most of the associated operational concerns. This paper presents the GSFC closed-loop control method to fly in either constellations or formations through the use of an autonomous closed loop three-axis navigation control and innovative orbit maintenance support. Simulation results using AutoCon(TM) and FreeFlyer(TM) with various fidelity levels of modeling and algorithms are presented.

Folta, David↗

Design and Implementation of Satellite Formations and Constellations

The direction to develop small low cost spacecraft has led many scientists to recognize the advantage of flying spacecraft in constellations and formations to achieve the correlated instrument measurements formerly possible only by flying many instruments on a single large platform. Yet, constellations and formation flying impose additional complications on orbit selection and orbit maintenance, especially when each spacecraft has its own orbit or science requirements. The purpose of this paper is to develop an operational control method for maintenance of these missions. Examples will be taken from the Earth Observing-1 (EO-1) spacecraft that is part of the New Millennium Program (NMP) and from proposed Earth System Science Program Office (ESSPO) constellations. Results can be used to determine the appropriateness of constellations and formation flying for a particular case as well as the operational impacts. Applications to the ESSPO and NMP are highly considered in analysis and applications. After constellation and formation analysis is completed, implementation of a maneuver maintenance strategy becomes the driver. Advances in technology and automation by GSFC's Guidance, Navigation, and Control Center allow more of the burden of the orbit selection and maneuver maintenance to be automated and ultimately placed onboard the spacecraft, mitigating most of the associated operational concerns. This paper presents the GSFC closed-loop control method to fly in either constellations or formations through the use of an autonomous closed loop three-axis navigation control and innovative orbit maintenance support. Simulation results using AutoCon(Trademark) and FreeFlyer(Trademark) with various fidelity levels of modeling and algorithms are presented.

Folta, David↗

Microelectrospray Thrusters

Propulsion technology is often a critical enabling technology for space missions. NASA is investing in technologies to enable high value missions with very small spacecraft, even CubeSats. However, these nanosatellites currently lack any appreciable propulsion capability. CubeSats are typically deployed and tumble or drift without any ability to transfer to higher value orbits, perform orbit maintenance, or perform de-orbit. Larger spacecraft can also benefit from high precision attitude control systems. Existing practices include reaction wheels with lifetime concerns and system level complexity. Microelectrospray thrusters will provide new propulsion capabilities to address these mission needs. Electric propulsion is an approach to accelerate propellant to very high exhaust velocities through the use of electrical power. Typical propulsion systems are limited to the combustion energy available in the chemical bonds of the fuel and then acceleration through a converging diverging nozzle. However, electric propulsion can accelerate propellant to ten times higher velocities and therefore increase momentum transfer efficiency, or essentially, increase the fuel economy. Fuel efficiency of thrusters is proportional to the exhaust velocity and referred to as specific impulse (Isp). The state-of-the-art (SOA) for CubeSats is cold gas propulsion with an Isp of 50-80 s. The Space Shuttle main engine demonstrated a specific impulse of 450 s. The target Isp for the Mars Exploration Program (MEP) systems is >1,500 s. This propellant efficiency can enable a 1-kg, 10-cm cube to transfer from low-Earth orbit to interplanetary space with only 200 g of propellant. In September 2013, NASA's Game Changing Development program competitively awarded three teams with contracts to develop MEP systems from Technology Readiness Level-3 (TRL-3), experimental concept, to TRL-5, system validation in a relevant environment. The project is planned for 18 months of system development. Due to the ambitious project goals, NASA has awarded contracts to mature three unique methods to achieve the desired goals. Some of the MEP concepts have been developed for more than a decade at the component level, but are now ready for system maturation. The three concepts include the high aspect ratio porous surface (HARPS) microthruster system, the scalable ion electrospray propulsion system (S-iEPS), and an indium microfluidic electrospray propulsion system. The HARPS system is under development by Busek Co. The HARPS thruster is an electrospray thruster that relies on surface emission of a porous metal with a passive capillary wicking system for propellant management. The HARPS thruster is expected to provide a simple, high ΔV and low-cost solution. The HARPS thruster concept is shown in figure 1. Figure 1 includes the thruster, integrated power processing unit, and propellant reservoir.

Dankanich, John↗

Iodine Propellant Feed System Flow Modeling

The use of solid iodine as a propellant in Hall-effect thrusters (HETs) is currently being investigated for small-satellite applications. CubeSats offer an inexpensive mode of access to space; however, they currently lack significant propulsion capability. A high specific impulse (I (sub sp)) propulsion system would permit a significant change in velocity, delta v, to be imparted for orbital maintenance, transfers, or de-orbit maneuvers. An electric propulsion system that uses iodine as a propellant has a number of advantages. It has an exceptionally high rho times I (sub sp) figure of merit (density multiplied by the specific impulse), meaning that it can achieve a large total delta v with a relatively low combination of propellant mass and propellant tank volume. Also, the propellant feed system operates at low pressures (a few psia at most), as opposed to the use of super-critical xenon stored at very high pressure. Low pressure operation can lower system mass while greatly reducing the risk of propellant tank rupture, making low pressure a vitally important property for propellants on secondary payloads like CubeSats, where risks must be minimized. The iSAT mission aims to demonstrate iodine-fed HET technology, flying it in space onboard a 12U 912-unit) CubeSat. In the iSAT propellant feed system (PFS), solid iodine is sublimed through heating to produce gaseous propellant that is conducted through tubing to the thruster and cathode. The sublimation process is governed by the iodine (I2) vapor pressure, which is shown as a function of temperature in figure 1. As gaseous I2 flows out of the tank, the gas pressure in the volume containing the solid iodine propellant is reduced until a balance between the flow of iodine out of the tank and the sublimation rate of solid iodine at the equilibrium gas pressure and chosen tank temperature is reached.

Martin, A. K.↗

MESSOC capabilities and results

MESSOC (Model for Estimating Space Station Operations Costs) is the result of a multi-year effort by NASA to understand and model the mature operations cost of Space Station Freedom. This paper focuses on MESSOC's ability to contribute to life-cycle cost analyses through its logistics equations and databases. Together, these afford MESSOC the capability to project not only annual logistics costs for a variety of Space Station scenarios, but critical non-cost logistics results such as annual Station maintenance crewhours, upweight/downweight, and on-orbit sparing availability as well. MESSOC results using current logistics databases and baseline scenario have already shown important implications for on-orbit maintenance approaches, space transportation systems, and international operations cost sharing.

Shishko, Robert↗

NASA CEV On-Orbit GN&C Analysis

The Orion spacecraft orbit GN&C system will be required to perform both ISS servicing missions and Lunar sortie and outpost crew transportation. While certain aspects of these two missions are complementary, the two missions are also distinct in many ways. Common between the missions is a Low Earth Orbit (LEO) rendezvous, one with the ISS And the other with the LSAM/EDS stack prior to trans-lunar insertion. The lunar missions will additionally require Orion to perform orbit maintenance in LLO, perform contingency lunar orbit operations including RPOD with the LSAM, perform the TEI maneuver sequence, and execute the trans-Earth cruise. The NASA-led team developed a reference configuration orbit GN&C system capable of executing all of these activities with the same navigation sensor suite and control effectors while fully meeting the requirements being developed for System Requirements Review in advance of prime contractor selection. This paper will present an overview of the analyses performed to support system trade studies, demonstrate the feasibility of the NASA reference configuration, and validate the Orion system requirements. These analyses include linear covariance techniques, 3-DOF Monte Carlo simulations, 6-DOF Monte Carlo simulations, and analytical evaluations of GN&C systems performed by the NASA-led Orion team to characterize the sensitivities of Orion s various missions and assess the unique challenges of each. The first part of this paper will describe the trade studies that were performed in order to characterize the RPOD system performance for both the ISS and the lunar missions including development of an RPOD operations concept, RPOD trajectories, contingency scenarios, docking mechanism and associated contact conditions, post-contact thrust issues, relative navigation sensors, relative navigation sensor target infrastructure. The paper will also discuss concepts for both manually-piloted and automatically executed scenarios, as well as the remotely-piloted contingency scenario in LLO. The second part of the paper will discuss the analyses performed for lunar and cislunar GN&C performance including the accuracy of the post-insertion lunar orbit, the ability of Orion to hit a particular Earth return entry corridor, attitude control solutions for long-duration surface operations, and autonomous navigation in support of TEI without ground tracking.

DSouza, Chris↗