Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

GOOML - Finding Optimization Opportunities for Geothermal Operations: Preprint

Geothermal Operational Optimization with Machine Learning (GOOML) is a transferable and extensible component-based geothermal asset modeling framework that considers complex steamfield relationships and identifies optimization prospects using a data-driven approach. We have used this framework to develop digital twins that provide steamfield operators with an operational environment to analyze and understand historical and forecasted power production, explore new steamfield configuration possibilities, and seek optimal asset management for real world applications. The GOOML modeling software is built on a generic component-based systems framework that allows for both historical and forecast analysis. A GOOML model can perform historical data-assimilation using first-principal thermodynamics to create a meaningful data model. Historical production data can then be coupled with a forecast framework to train machine-learning models of steamfield components to predict future outputs. This modeling environment enables digital exploration of steamfield design configurations and operational scenarios. GOOML digital twins have been developed for steamfields in New Zealand and the United States representing differing power generation and field conditions. These digital twins have been validated by comparing hindcast predictions against historical production data. Reinforcement learning experiments were conducted to demonstrate the ability to programmatically explore the operations space using machine learning agents. Our initial results are compelling; two to five percent increases in annual energy production were demonstrated by the GOOML models with no additional infrastructure build required. GOOML offers a new approach to geothermal operations by applying state-of-the-art machine learning algorithms, comprehensive data analytics, and interaction with digital twins. Through application of these tools, operators will realize greater availability and higher net generation which will increase the cost effectiveness of geothermal energy projects.

access↗

Machine Learning-Based Technique for Automated Sensor Characterization

The development of novel instrumentation requires an iterative cycle with three stages: design, prototyping, and testing. Recent advancements in simulation and nanofabrication techniques have significantly accelerated the design and prototyping phases. Nonetheless, detector characterization continues to be a major bottleneck in device development. During the testing phase, a significant time investment is required to characterize the device in different operating conditions and find optimal operating parameters. The total effort spent on characterization and parameter optimization can occupy a year or more of an expert s time. In this work, we present a novel technique for automated sensor calibration that aims to accelerate the testing stage of the development cycle. This technique leverages closed-loop Bayesian optimization (BO), using real-time measurements to guide parameter selection and identify optimal operating states. We demonstrate the method with a novel low-noise CCD, showing that the machine learning-driven tool can efficiently characterize and optimize operation of the sensor in a couple of days without supervision of a device expert.

Zepeda, Cuevas [Chicago U., KICP]↗

Optimal economic operation of liquid petroleum products pipeline systems

The majority of overland transport needs for crude petroleum and refined petroleum products are met using pipelines. Numerous studies have developed optimization methods for design of these systems in order to minimize construction costs while meeting capacity requirements. Here, we formulate problems to optimize the operations of existing single liquid commodity pipeline systems subject to physical flow and pump engineering constraints. The objectives are to maximize the economic value created for users of the system and to minimize operating costs. We present a general computational method for this class of continuous, non-convex nonlinear programs, and examine the use of pump operating settings and flow allocations as decision variables. Furthermore, the approach is applied to compute optimal operating regimes and perform engineering economic sensitivity analyses for a case study of a crude oil pipeline developed using publicly available data.

02 PETROLEUM↗

Optimizing Desalination Operations for Energy Flexibility

Despite the value of energy optimization in desalination processes, modeling dynamic operations for monthly billing periods has remained a computational challenge. This work proposes a framework for energy flexibility optimization, which includes new modeling features for independent operation of parallel skids, start-up delays associated with chemical stabilization, the consideration of industrial energy tariff structures, and inclusion of hourly electrical carbon intensities. This is done using a modular and computationally efficient formulation that guarantees a globally optimal solution with standard optimization solvers. In this study, the approach is demonstrated in two distinct case studies: a seawater desalination plant in Santa Barbara, CA, and an indirect potable reuse facility in San Jose, CA. Trends predicted from the model are validated against operational facility measurements from a demand response shutdown event. Preliminary results show that optimizing energy flexibility can result in 18.51% monthly cost savings over energy efficiency-optimized operation. The value extracted from a facility-wide shutdown during peak electricity price hours is hampered by start-up delays in post-treatment chemical stabilization. In cases in which a facility does not have much excess capacity, using a flow equalization tank or operating over a wide recovery range may be cost-effective.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Power system restoration incorporating diverse distributed energy resources

An example system includes an aggregator configured to receive a service collaboration request and iteratively determine, based on minimum and maximum power values for DERs under its management, an optimized operation schedule. The aggregator may also be configured to iteratively determine, based on the optimized operation schedule, an estimated flexibility range for devices under its management and output an indication thereof. The system may also include a power management unit (PMU) configured to iteratively receive the indication and determine, based on a network model that includes the estimated flexibility range, a reconfiguration plan and an overall optimized operation schedule for the network. The PMU may also be configured to iteratively cause reconfiguration of the network based on the plan. The PMU and aggregator may also be configured to iteratively, at a fast timescale, cause energy resources under their management to modify operation based on the overall optimized operation schedule.

Ding, Fei↗

OPER: Optimality-Guided Embedding Table Parallelization for Large-scale Recommendation Model

With the sharp increasing volume of user data, Deep Learning Recommendation Model (DLRM) becomes an indispensable infrastructure in large technology companies. However, large-scale DLRM on the multi-GPU platform is still inefficient due to unbalanced workload partitioning and intensive inter-GPU communication. To this end, we propose OPER, an OPtimality guided Embedding table placement for large-scale Recommendation model training and inference. OPER explores the potential of mitigating remote memory access latency in DLRM through fine-grained embedding table placement. Specifically, OPER proposes a theoretical modeling that builds up the relationship between EMT placement and the embedding communication latency in both training and inference. OPER proves the NP hardness of finding the optimal embedding table placement and proposes a heuristic algorithm that yields near optimal placement. OPER implements a SHMEM-based embedding table training system and a unified embedding index mapping to support fine-grained embedding table sharding and placement. Comprehensive experiments reveal that OPER achieves on average 3.4× and 5.1× speedup on training and inference respectively over state-of-the-art DLRM frameworks.

Wang, Zheng↗

Performing optimized collective operations in a irregular subcommunicator of compute nodes in a parallel computer

In a parallel computer, performing optimized collective operations in an irregular subcommunicator of compute nodes may be carried out by: identifying, within the irregular subcommunicator, regular neighborhoods of compute nodes; selecting, for each neighborhood from the compute nodes of the neighborhood, a local root node; assigning each local root node to a node of a neighborhood-wide tree topology; mapping, for each neighborhood, the compute nodes of the neighborhood to a local tree topology having, at its root, the local root node of the neighborhood; and performing a one way, rooted collective operation within the subcommunicator including: performing, in one phase, the collective operation within each neighborhood; and performing, in another phase, the collective operation amongst the local root nodes.

Davis, Kristan Suzanne D.↗

Nuclear Power Fault Diagnostics and Preventative Maintenance Optimization

Operation and maintenance costs for nuclear power plants are very large. Reactors are starting to shut down even after their operating licenses have been extended, because they are not price competitive compared to other energy sources. The nuclear industry is witnessing early closure of nuclear power plants due to economic reasons despite excellent safety records. Therefore, it is imperative to reduce costs to prevent these early closures. This paper showcases recent research into advanced fault diagnostics techniques and preventative maintenance optimization to reduce these maintenance costs. This report focuses on the condensate and feedwater system for both pressurized and boiling water reactor systems. The computerized maintenance management system, which contains the plant’s digital record of all the corrective- and preventative-maintenance work orders, was used as a ground truth to locate potential faults and label the process data as healthy or faulty. Various feature extraction techniques were utilized to further differentiate the faults from the healthy data. Support vectors machines were used to categorize other test sets of process data as healthy or faulty through a cross validation procedure. Similar faults were not found within this system leading to preventative maintenance optimization. Unnecessary amounts of preventative maintenance lead to inflated maintenance costs. This paper summarizes the steps for preventative maintenance optimization from component health determination to recommendation for action. This optimization was completed for condensate pumps, condensate booster pumps, and the respective motors that drive them.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Digital Twin Technology (“Morpheus”) for Optimized Building Operations [SWR-22-74]

The electrification of buildings is an important step to reducing greenhouse gas emissions across all industries. The management of increasingly electrified buildings is a complex pursuit, and there remains a need for cost-effective software capable of handling the computational burden required of such complexity. Through a partnership with Dallas Fort Worth (DFW) Airport, researchers at NREL have developed a digital twin modeling framework to optimize building operations, called Morpheus. Pairing predictive control with automatic fault detection and diagnostics, Morpheus decreases energy expenditures, costs, and faults for large facilities. Additionally, Morpheus employs artificial intelligence to continuously improve its performance using information provided by sensor systems, human experts with deep industry domain knowledge, and even from other similar machines or fleets of machines. Coupling this novel energy-management software with other digital twins, such as NREL’s Athena software for mobility operations, enables robust decision-making for asset and space management. The implementation of Morpheus at DFW has resulted in significantly improved HVAC system operations and reduced both peak power and overall energy consumption. This enhanced functionality comes at a more affordable price than previously developed digital twins and can be customized for other facilities’ geometries to provide optimal, individualized control of a facility’s energy consumption.

Chinde, Venkatesh↗

Site demonstration and performance evaluation of MPC for a large chiller plant with TES for renewable energy integration and grid decarbonization

Thermal energy storage (TES) for a cooling plant is a crucial resource for load flexibility. Traditionally, simple, heuristic control approaches, such as the storage priority control which charges TES during the nighttime and discharges during the daytime, have been widely used in practice, and shown reasonable performance in the past benefiting both the grid and the end-users such as buildings and district energy systems. However, the increasing penetration of renewables changes the situation, exposing the grid to a growing duck curve, which encourages the consumption of more energy in the daytime, and volatile renewable generation which requires dynamic planning. The growing pressure of diminishing greenhouse gas emissions also increases the complexity of cooling TES plant operations as different control strategies may apply to optimize operations for energy cost or carbon emissions. This paper presents a model predictive control (MPC), site demonstration and evaluation results of optimal operation of a chiller plant, TES and behind-meter photovoltaics for a campus-level district cooling system. The MPC was formulated as a mixed-integer linear program for better numerical and control properties. Compared with baseline rule-based controls, the MPC results show reductions of the excess PV power by around 25%, of the greenhouse gas emission by 10%, and of peak electricity demand by 10%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operation and Optimization of Microwave-Heated Continuous-Flow Microfluidics

Microwave (MW) technology can be powerful for electrification and process intensification but limited fundamental understanding of scalability and design principles hinders its effective use. In this work, we build a continuous-flow microreactor inside a commercial single-mode MW applicator and the corresponding computational fluid dynamics model to simulate the temperature profile. The model is in good agreement with experiments for various microreactor dimensions and operating conditions. The model indicates that MW heating is greatly influenced by reactor geometry as well as the operating parameters. We observe a strong correlation between parameters and develop a gradient boost regression tree model to predict the outlet temperature accurately. This model is then applied to optimize the dimensions and operating conditions to maximize the outlet temperature and energy efficiency, resulting in a Pareto optimal. We demonstrate computationally and experimentally that it is possible to surpass the Pareto optimal and achieve an energy efficiency of ~90% or greater at temperatures relevant for liquid-phase chemistry via salting of the solvent. The present methodology can be applied to other complex MW reactors. Lastly, the combined numerical and experimental approach provides insights into and a framework for scale-up and optimization.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Machine learning-aided inverse design for biogas upgrading through biological CO 2 conversion

The biogas upgrading process through bioconversion of CO 2 to CH 4 by hydrogenotrophic methanogens is an attractive strategy for energy decarbonation. Many studies have optimized operational parameters to improve key performance indicators such as CH 4 % and H 2 utilization efficiency. However, inconsistent laboratory conditions make it challenging to compare results. Existing models for analyzing operating conditions can only assess the impact of individual conditions and lack the ability to simultaneously optimize multiple conditions. To address this, two XGBoost models were built with R 2 of 0.779 and 0.903 with data collected from literatures and were embedded into multi-objective partitive swarm optimization algorithm to optimal operating conditions. Predictions were compared with experimental validations under optimized conditions, revealing an 8.50% and 2.95% relative error in CH 4 % and H 2 conversion rate, respectively. This approach streamlines biogas upgrading processes, offering a data-driven solution to enhance efficiency and consistency in the pursuit of sustainable methane production.

Biogas upgrading↗

Optimal Transfer Operators in Algebraic Two-Level Methods for Nonsymmetric and Indefinite Problems

Consider an algebraic two-level method applied to the 𝑛-dimensional linear system 𝐴⁢𝒙 = 𝒃 using fine-space preconditioner (i.e., “relaxation” or “smoother”) 𝑀, with 𝑀 ≈ 𝐴, restriction and interpolation 𝑅 and 𝑃, and algebraic coarse-space operator 𝐴 𝑐 : = 𝑅 ∗ ⁢𝐴⁢𝑃. Then, what are the best possible transfer operators 𝑅 and 𝑃 of a given dimension 𝑛 𝑐 < 𝑛? Brannick et al. [12] showed that when 𝐴 and 𝑀 are Hermitian positive definite (HPD), the optimal interpolation is such that its range contains the 𝑛 𝑐 smallest generalized eigenvectors of the matrix pencil (𝐴, 𝑀). Recently, in Ali et al. [5] we generalized this framework to the non-HPD setting, by considering both right (interpolation) and left (restriction) generalized eigenvectors of (𝐴, 𝑀) and defining corresponding nonsymmetric transfer operators {𝑅#, 𝑃#}. Tight convergence bounds for {𝑅#, 𝑃#} are derived in spectral radius, as well as a proof of pseudo-optimality. Note, {𝑅#, 𝑃#} are typically complex valued, which is not practical for real-valued problems. Here, in this work, we build on [5], first characterizing all inner products in which the coarse-space correction defined by {𝑅#, 𝑃#} is orthogonal. We then develop tight two-level convergence bounds in these norms, and prove that the underlying transfer operators {𝑅#, 𝑃#} are genuinely optimal. As a special case, our theory both recovers and extends the HPD results from [12]. Finally, we show how to construct optimal, real-valued transfer operators in the case of that 𝐴 and 𝑀 are real valued, but are not HPD. Numerical examples arising from a discretized advection-reaction equation, wave-equation, and Stokes equations are used to verify and illustrate the theory.

97 MATHEMATICS AND COMPUTING↗

Optimizing Facility Operations by Applying Machine Learning to the Army Reserve Enterprise Building Control System (Final Report)

Thousands of U.S. Department of Defense (DoD) buildings have building automation systems (BASs) and/or advanced meters. Although these systems have a wealth of data, performance optimization requires time and expertise to review and act on that information. Machine learning (ML) can provide automated and actionable insights to controls operators. This demonstration implemented proven ML methods on the Army Reserve Enterprise Building Control System. ML refers to algorithms that “learn” from data and improve their performance on a given task over time. In the buildings domain these tasks range from predicting future energy consumption, to identifying operational issues before faults occur, to optimizing control decisions. To learn, ML requires input data, which – for buildings – typically consists of instrument data such as energy consumption data and subsystem controls information such as set-point temperatures, and context data consisting of information such as the physical location of the building, the area of the building, and the weather. ML models use the relationships learned from the input data to make predictions with new, previously unseen, data. The team was able to investigate and successfully implement the following ML use cases: labeling consumption data as anomalous or non-anomalous; baseline whole-building load prediction (unknown fault status); fault detection (validation not possible); and site prioritization for energy-related projects. Due to the constraints of the project, interventions were not able to be implemented during the demonstration; therefore, assessments of operational cost savings and maintenance avoided could not be performed. The project has been presented at two leading national building conferences and two additional publications to peer-reviewed journals are currently in preparation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal and Mechanical Energy Performance Analysis of Closed-loop Systems in Hot-Dry-Rock and Hot-Wet-Rock Reservoirs

To understand the potential and limitations for recovering thermal and mechanical energy from closed-loop geothermal systems a collaborative study is underway that will investigate an array of system configurations, working fluids, geothermal reservoir characteristics, operational periods, and heat transfer enhancements. Closed-loop geothermal systems are distinguished from hydrothermal or enhanced geothermal systems (EGS) in that the working fluid only circulates through drilled boreholes. Principal objectives of this study are to determine upper limits for thermal and mechanical energy recovery and optimal operational and configuration parameters for each scenario. Teams of scientists and engineers are applying a suite of numerical simulation and analytical tools to model the heat recovery from closed-loop geothermal systems, and then optimizing operational and configuration parameters to maximize the thermal and mechanical energy recovery. Results from the suite of numerical simulators and analytical tools, such as outlet and inlet states and temperature profiles in the geothermal reservoir over time are intercompared to increase confidence in the analysis. This paper documents the study findings for closed-loop systems in hot-dry-rock and hot-wet-rock reservoirs, where water is the working fluid. The characteristics of the hot-dry-rock reservoir were based on the U.S. Department of Energy's Utah Frontier Observatory for Research in Geothermal Energy (FORGE) site, near Milford Utah. Two objective functions are defined to optimize the operational and configuration parameters of the system, one each for the recovery of mechanical and thermal energy over the period of operation. For both objective functions, a surface plant thermal to mechanical energy conversion factor and an energy drilling cost is required. In keeping with the study objectives the surface plant conversion factor is determined from a second-law of thermodynamics analysis of a generic binary plant, and drilling costs are based on those from the Utah FORGE site and current national electrical costs.

closed-loop geothermal systems↗