Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operating experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Operational Experience from Solar Thermal Energy Projects

Over the past few years, Sandia National Laboratories were involved in the design, construction, and operation of a number of DOE-sponsored solar thermal energy systems. Among the systems currently in operation are several industrial process heat projects and the Modular Industrial Solar Retrofit qualification test systems, all of which use parabolic troughs, and the Shenandoah Total Energy Project, which uses parabolic dishes. Operational experience has provided insight to both desirable and undesirable features of the designs of these systems. Features of these systems which are also relevant to the design of parabolic concentrator thermal electric systems are discussed. Other design features discussed are system control functions which were found to be especially convenient or effective, such as local concentrator controls, rainwash controls, and system response to changing isolation. Drive systems are also discussed with particular emphasis of the need for reliability and the usefulness of a manual drive capability.

Cameron, C. P.↗

Catalog of Apollo experiment operations

This catalog reviews Apollo mission reports, preliminary science reports, technical crew debriefings, lunar surface operations plans, and various relevant lunar experiment documents, collecting engineering- and operation-specific information by experiment. It is organized by discrete experimental and equipment items emplaced or operated on the lunar surface or at zero gravity during the Apollo missions. It also attempts to summarize some of the general problems encountered on the surface and provides guidelines for the design of future lunar surface experiments with an eye toward operations. Many of the problems dealt with on the lunar surface originated from just a few novel conditions that manifested themselves in various nasty ways. Low gravity caused cables to stick up and get caught on feet, and also made it easy for instruments to tip over. Dust was a problem and caused abrasion, visibility, and thermal control difficulties. Operating in a pressure suit limited a person's activity, especially in the hands. I hope to capture with this document some of the lessons learned from the Apollo era to make the jobs of future astronauts, principle investigators, engineers, and operators of lunar experiments more productive.

Sullivan, Thomas A.↗

Cryogenic control system operational experience at SNS

Abstract The helium cryogenic system at Spallation Neutron Source (SNS) provides cooling to 81 superconducting radio frequency cavities. To support the operation of the cryogenic facility, a highly reliable control system consisting of software, hardware, and Human Machine Interface (HMI) has been developed and improved during the first fifteen years of operation. Integrating the cryogenic control system with other subsystems of the SNS complex is an important aspect to the success of the operation. The operating experience, lessons learned and recommendations to consider for future facilities will be detailed in this paper.

Howell, M. (ORCID:0000000310360707)↗

International Space Station United States Orbital Segment Oxygen Generation System On-Orbit Operational Experience

The International Space Station (ISS) United States Orbital Segment (USOS) Oxygen Generation System (OGS) was originally intended to be installed in ISS Node 3. The OGS rack delivery was accelerated, and it was launched to ISS in July of 2006 and installed in the US Laboratory Module. Various modification kits were installed to provide its interfaces, and the OGS was first activated in July of 2007 for 15 hours, In October of 2007 it was again activated for 76 hours with varied production rates and day/night cycling. Operational time in each instance was limited by the quantity of feedwater in a Payload Water Reservoir (PWR) bag. Feedwater will be provided by PWR bag until the USOS Water Recovery System (WRS) is delivered to SS in fall of 2008. This paper will discuss operating experience and characteristics of the OGS, as well as operational issues and their resolution.

Erickson, Robert J.↗

ISAC SC-LINAC PHASE-II HELIUM REFRIGERATOR COMMISSIONING AND FIRST OPERATIONAL EXPERIENCE AT TRIUMF

ISAC Phase-II is an upgrade of the radioactive isotope superconducting linear accelerator, SC-linac, at TRIUMF. The Phase-I section of the accelerator, medium-beta, is operational and is cooled with a 600 W helium refrigerator, commissioned in March 2005. An identical refrigerator is being used with the Phase-II segment of the accelerator; which is now under construction. The second refrigerator has been commissioned and tested with the Phase-I section of the linac and is used for Phase-II linac development, including new SC-cavity performance tests. The commissioning of the Phase-II refrigeration system and recent operational experience is presented.

43 PARTICLE ACCELERATORS↗

Estimation of pipe failure frequencies in the absence of operational experience data: A pilot study

Probabilistic failure metrics such as leak frequency and rupture frequency are commonly used to characterize piping reliability. The methodologies for calculating the failure metrics rely on a complex set of input parameters. Operating experience data and experimental data play an important role in informing the different input parameters. The paper describes results and conclusions of a coordinated research project to benchmark three different reliability models using a four-step procedure: reference case definition of relevance to advanced reactor designs, input parameter calibration, validation of results, and application of different methodologies upon completion of the calibration and validation steps. The reference case is a weld consisting of nickel-base alloy 152/52 and located within a primary pressure boundary of an advanced reactor. This alloy is a class of structural materials known to be highly resistant to stress corrosion cracking. Synergies between the different methods are noted and the importance of a multi-disciplinary approach to input parameter development is underscored. A key conclusion is that the three methods are equally suitable for estimating failure frequencies. In any specific application, a selection of the most practical or effective computational tool can be considered. The comparison of alternative models confirms and helps to gain confidence in the computed failure frequency estimates. The study was part of a coordinated research project organized by the International Atomic Energy Agency.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The B737 MAX 8 Accidents as Operational Experiences With Automation Transparency

Automation transparency has come into prominence in the human-machine systems literature, with researchers offering definitions, models, design frameworks, and empirical findings. However, missing from the literature are reflections on the actual operational experiences of human crews interacting with intelligent automation conceived from multiple transparency perspectives. The Boeing 737 MAX 8 accidents present a tragic case of a catastrophic failure of automation transparency. We explore this case with an emphasis on extracting design and regulatory insights for the nuclear power and other safety-critical domains.

99 GENERAL AND MISCELLANEOUS↗

Operating Experience Review of the INL HTE Gas Monitoring System

This paper describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored at hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and unwanted alarms are described. The calibration session time durations are described. Some simple statistics are given for the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

08 HYDROGEN↗

Tritium Room Air Monitor Operating Experience Review

Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Operating experience with the 200 kW MOD-OA wind turbine generators

The machine configuration and its advantages and disadvantages, particularly as it affects reliability are discussed. The machine performance, both availability and power output characteristics are described. The Mod-OA operational experience is documented. The characteristics of the wind energy generated, the machine performance, and the subsystem strengths and weaknesses are discussed. An assessment of the project success in fulfilling its goals and objectives is also presented.

Birchenough, A. G.↗

12 GeV CEBAF Initial Operational Experience and Challenges

The 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility (CEBAF) achieved CD-4B, or Project Completion, on September 27, 2017. The 13-year $338M project doubled the beam energy of the CEBAF accelerator while also adding a fourth experimental hall. The scope of work for the accelerator complex was completed in 2014. Over the subsequent three years the upgrades for the experimental halls were completed, beamlines and spectrometers commissioned and transitions made to production running for the Nuclear Physics program. This paper will present an overview of the operational experience gained during initial accelerator commissioning through the recent achievements of simultaneous 4-Hall operations at full beam power.

Spata, Michael F.↗

Fermilab SRF cryomodule operational experience

Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style standalone refrigerators, cryogenic distribution system as well as an ambient temperature pumping system to achieve 2K operations with supporting purification systems. During this phase of the project a single Type III plus 1.3 GHz cryomodule was installed, cooled and tested. Design constraints of the cryomodule required that the cryomodule individual circuits be cooled at predetermined rates. These constraints required special design solutions to achieve. This paper describes the initial cooldown and operational experience of a 1.3 GHz cryomodule using the New Muon Lab cryogenic system.

43 PARTICLE ACCELERATORS↗

Operational experiences of the spallation neutron source superconducting linac and power ramp-up

The spallation neutron source (SNS) is a second generation pulsed neutron source and designed to provide a 1-GeV, 1.44-MW proton beam to a mercury target for neutron production. Since the commissioning of the accelerator complex in 2006, the SNS has started its operation for neutron production and beam power ramp-up has been in progress toward the design goal. All subsystems of the SNS were designed and developed for substantial improvements compared to existing accelerators because the design beam power is almost an order of magnitude higher compared to existing neutron facilities and the achievable neutron scattering performance will exceed present sources by more than a factor of 20 to 100. In this paper, the operational experiences with the SNS Superconducting Linac (SCL), Power Ramp-up Plan to reach the design goal and the Power Upgrade Plan (PUP) will be presented including machine, subsystem and beam related issues.

43 PARTICLE ACCELERATORS↗

Operational experience and validation of the triathler{sup TM} model 425-034(1) single vial liquid scintillation counter for meeting department of energy release criteria

Triathler{sup TM} Model 425-034 single vial liquid scintillation counter (LSC) counters have been in use at the Safety and Tritium Applied Research Facility (STAR) for approximately three years. During facility setup and determination of instrumentation needs to support STAR facility operations, the Triathler was chose to assess smearable tritium contamination levels for operational conditions. The Triathler was selected due to the rapid turnaround time for obtaining tritium contamination levels versus other automated batch LSC counters currently in use at the Idaho National Laboratory (INL) and other Dept. of Energy (DOE) installations. Operational experience with the Triathler thus far has shown a high reliability for verifying removable contamination levels at a level of < 1,000 Disintegrations Per Minute (DPM) per 100 cm{sup 2} when compared to the Packard{sup TM} Tri-Carb 1905 AB/LA Liquid Scintillation Analyzer used by the Reactor Technologies Complex (RTC) Radiochemistry Measurements Laboratory (RML). However, variances in the reported results for activity in DPM/vial from the Triathler versus the Packard Tri-Carb have been noted when operating in the range of 5,000 to 20,000 DPM. These variances make reliability and use of the Triathler suspect for verifying smearable contamination levels meet the release criteria identified in DOE Order 5400.5, Radiation Protection of the Public and Environment. Ensuring that removable tritium contamination levels on materials and equipment intended for free-release to the public are <10,000 DPM per 100 cm{sup 2} is a requirement in the Idaho National Laboratory (INL) contract. Comprehensive cross-comparisons have been ongoing to ensure the Triathler LSC reported DPM values provide sufficient detection of smearable tritium contamination when cross-compared to other automated liquid scintillation counters available at the INL. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operational Experience with the MICE Spectrometer Solenoid System

The Muon Ionization Cooling Experiment located at Rutherford Appleton Laboratory in England utilizes a supercon-ducting solenoid system for the muon cooling channel that also holds particle tracking detectors and muon absorbers inside their bores. The solenoid system installation was completed in summer of 2015 and after commissioning the system it has been running successfully. As a result, this paper summarizes the commissioning results and operational experience with the magnets focusing on the per-formance of the two Spectrometer Solenoids built by the US.

43 PARTICLE ACCELERATORS↗

Operational Experience of a Cryomodule Test Stand for LCLS-II Cryomodules

CMTS1 (cryomodule test stand 1) at Fermilab was built to test cryomodules built for the LCLS-II beamline at SLAC and is currently testing cryomodules for LCLS-II-HE, the high energy upgrade to LCLS-II. The first cryomodule test was in 2016 and to date over 30 cryomodules have been tested here. This talk will highlight operational experience of the vacuum systems including insulating, coupler, and a low particulate beamline vacuum system. It will focus on the problems that have come up over the years, their solutions, and mitigations put in place to prevent further issues.

43 PARTICLE ACCELERATORS↗