Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operating costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Re-Engineering of the Hubble Space Telescope (HST) to Reduce Operational Costs

Satellite telemetry processing onboard the Hubble Space Telescope (HST) is carried out using dedicated software and hardware. The current ground system is expensive to operate and maintain. The mandate to reduce satellite ground system operations and maintenance costs by the year 2000 led NASA to upgrade the command and control systems in order to improve the data processing capabilities, reduce operator experience levels and increase system standardization. As a result, a command and control system product development team was formed to redesign and develop the HST ground system. The command and control system ground system development consists of six elements. The results of the prototyping phase carried out for the following of these elements are presented: the front end processor; middleware, and the graphical user interface.

Garvis, Michael↗

Benchmarking Wind Power Operating Costs in the United States: Results from a Survey of Wind Industry Experts

This paper draws on a survey of wind industry professionals to clarify trends in the operational expenditures (OpEx) of U.S. land-based wind power plants. The paper also highlights key drivers of those trends. We find that average all-in lifetime OpEx has declined from approximately $\$$80/kW-yr ($\$$35/MWh) for projects built in the late 1990s to a level that is approaching $\$$40/kW-yr ($\$$11/MWh) for projects under construction in 2018. Turbine operations and maintenance (O&M) costs—inclusive of scheduled and unscheduled maintenance—represent the single largest component of overall OpEx and the primary source of cost reductions over the last decade. We observe wide ranges of OpEx over time; for example, survey respondents cite a range in average expected costs for projects commissioned between 2015 and 2018 from $\$$33/kW-yr to $\$$59/kW-yr. Notably, these broad ranges include high levels of variability in both turbine O&M costs and non-turbine OpEx. Potential technical and strategic drivers of this variability are highlighted. We also use historical OpEx learning rates, showing a 9% OpEx reduction for each doubling of global installed wind capacity, to project a further $\$$5–$\$$8/kW-yr (12%–18%) OpEx reduction from 2018 to 2040. When compared with the broader literature, these findings suggest that continued OpEx reductions may contribute 10% or more of the expected reductions in land-based wind’s levelized cost of energy. Moreover, these estimates may understate the importance of OpEx owing to the multiplicative effects through which operational advancements influence not only O&M costs but also component reliability, performance, and plant-level availability—thereby affecting levelized costs though OpEx reduction and by enhancing annual energy production and plant lifetimes. Given the limited quantity and comparability of previously available OpEx data, the data and trends reported here may usefully inform OpEx assumptions used by electric system planners, analysts, modelers, and research and development managers. The results may also provide useful benchmarks to the wind industry, helping developers and asset owners compare their OpEx expectations with historical experience and other industry projections.

17 WIND ENERGY↗

Maintenance and operations cost model for DSN subsystems

A procedure is described which partitions the recurring costs of the Deep Space Network (DSN) over the individual DSN subsystems. The procedure results in a table showing the maintenance, operations, sustaining engineering and supportive costs for each subsystems.

Burt, R. W.↗

Utilizing the EUVE Innovative Technology Testbed to Reduce Operations Cost for Present and Future Orbiting Mission

This report summarizes work done under Cooperative Agreement (CA) on the following testbed projects: TERRIERS - The development of the ground systems to support the TERRIERS satellite mission at Boston University (BU). HSTS - The application of ARC's Heuristic Scheduling Testbed System (HSTS) to the EUVE satellite mission. SELMON - The application of NASA's Jet Propulsion Laboratory's (JPL) Selective Monitoring (SELMON) system to the EUVE satellite mission. EVE - The development of the EUVE Virtual Environment (EVE), a prototype three-dimensional (3-D) visualization environment for the EUVE satellite and its sensors, instruments, and communications antennae. FIDO - The development of the Fault-Induced Document Officer (FIDO) system, a prototype application to respond to anomalous conditions by automatically searching for, retrieving, and displaying relevant documentation for an operators use.

Source record↗

Hybrid-Energy-Powered Electrochemical Ocean Alkalinity Enhancement Model: Plant Operation, Cost, and Profitability

Electrochemical ocean alkalinity enhancement is a form of marine carbon dioxide removal, a rapidly growing industry that is powered by efficient onshore or offshore energy sources. As more and larger deployments are being planned, it is important to consider how variable energy sources like tidal energy can impact plant performance and costs. An open-source Python-based generalizable model for electrodialysis-based ocean alkalinity enhancement has been developed that can capture key system-level insights of the electrochemistry, ocean chemistry, acid disposal, and co-product creation of these plants under various conditions. The model additionally accounts for hybrid energy system performance profiles and costs via the National Laboratory of the Rockies’ H2Integrate tool. The model was used to analyze an example theoretical plant deployment in North Admiralty Inlet, including how the plant is impacted by the available energy sources in the region and the scale at which plant costs are covered by the co-products it generates, such as recycled concrete aggregates, without requiring carbon credits. The results show that the example plant could be profitable without carbon credits at commercial scales of 100,000 to 1 million tons of carbon dioxide removal per year, so long as it uses low-cost electricity sources and either sells acid or recovers recycled concrete aggregates with about 1 molar acid concentrations, though more research is needed to confirm these results.

hybrid energy↗

A maintenance and operations cost model for DSN

A cost model for the DSN is developed which is useful in analyzing the 10-year Life Cycle Cost of the Bent Pipe Project. The philosophy behind the development and the use made of a computer data base are detailed; the applicability of this model to other projects is discussed.

Burt, R. W.↗

Pump/Control System Minimum Operating Cost Testing

A preliminary evaluation of pump performance was initiated to determine the efficiencies of an arbitrary group of small pumps. Trends in factors affecting energy usage in typical prime movers which might be used in liquid transport solar systems were assessed. Comparisons of centrifugal pump efficiencies were made from one manufacturer to another. Tests were also made on two positive-displacement pumps and comparisons with centrifugal pumps were observed.

Source record↗

An application of multiattribute decision analysis to the Space Station Freedom program. Case study: Automation and robotics technology evaluation

The results are described of an application of multiattribute analysis to the evaluation of high leverage prototyping technologies in the automation and robotics (A and R) areas that might contribute to the Space Station (SS) Freedom baseline design. An implication is that high leverage prototyping is beneficial to the SS Freedom Program as a means for transferring technology from the advanced development program to the baseline program. The process also highlights the tradeoffs to be made between subsidizing high value, low risk technology development versus high value, high risk technology developments. Twenty one A and R Technology tasks spanning a diverse array of technical concepts were evaluated using multiattribute decision analysis. Because of large uncertainties associated with characterizing the technologies, the methodology was modified to incorporate uncertainty. Eight attributes affected the rankings: initial cost, operation cost, crew productivity, safety, resource requirements, growth potential, and spinoff potential. The four attributes of initial cost, operations cost, crew productivity, and safety affected the rankings the most.

Smith, Jeffrey H.↗