Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “needs assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Rapidly Deployable Acoustic Monitoring and Localization System Based on a Low-Cost Wave Buoy Platform

The primary objective of this project is to develop a cost-effective, fit-for-purpose environmental monitoring system, “NoiseSpotter®,” that characterizes, classifies, and provides accurate location information for anthropogenic and natural sounds in near real-time. NoiseSpotter was developed to support the evaluation of potential acoustic effects of marine energy (ME) projects. By utilizing a compact array of three acoustic particle motion sensors, NoiseSpotter triangulates individual bearings to provide sound source localization to within 5% accuracy, allowing the ability to discern ME device sounds relative to other confounding sounds in the environment, while providing location estimates to nearby marine mammals for environmental mitigation purposes. The ME industry needs proven solutions to meet environmental impact assessment needs. The NoiseSpotter® includes off-the-shelf, modular components that are easy to assemble and disassemble. Its acoustic particle motion sensors are commercially available and the data logger and real-time telemetry system is designed to be plug-and-play. The entire system is relatively compact and can be deployed from small vessels. NoiseSpotter’s near real-time capability enables operational monitoring of ME sounds, particularly during early stages of technology adoption to facilitate mitigation of potential noise effects. Widespread adoption of the technology for acoustic monitoring of ME devices requires that it be cost effective; hence the anticipated commercial cost of system hardware is $35,000. This project contributes to reducing barriers to ME testing through support of scientific research focused on reducing or mitigating environmental risks and lowering costs and complexity of environmental monitoring. This project has developed an acoustic monitoring system, NoiseSpotter® (U.S. Patent No. 11,156,734 and U.S. Registered Trademark No. 6,442,313), to detect and characterize baseline noise and sounds from ME operations and support geolocation of detected sounds. The intended outcome of the project is to mitigate concerns about the potential for ME device noise to alter marine mammal or fish behavior. NoiseSpotter® enables cost-effective, near real-time acoustic monitoring of an operational ME device relative to ambient environmental noise and provides a technical basis for ME developers seeking to navigate the permitting process in an efficient manner.

16 TIDAL AND WAVE POWER↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Data Quality Methodology (4.2.1)

SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects. All of the data needs to evaluate a site are somewhat interconnected. We used criterion (2) above to determine if the data collection design would have to be modified to meet the need; if this was commonly true a linkage was shown. The application of this cross index to sites in the subsequent tasks will demonstrate that the demand for data types varies site-to-site and project-to-project. Examples of factors to be considered are the complexity of the geology, the injection goals such as rate and duration of the injection, and the types of risk and risk tolerance of key stakeholders. In future tasks the team will compare the demand for data with existing data availability. This will, in turn, determine when data needs to be acquired to support project development. For example, in a project area with complex structure, 3-D seismic data may be needed earlier and more urgently than in an area with simple rock body geometries. In some locations, a 3-D seismic survey has already been collected and can be purchased. In other locations the project developer will need to collect these data. For another example, a project near an urban area or near to a park may generate earlier and more substantive public concern than a site that is developed in mined lands. A calculation using the derivative from table 1 will show the different investment needs. Project cost will vary corresponding to data criticality and data availability.

42 ENGINEERING↗

Gulf of Mexico Helicopter Offshore System Technologies Recommended Development Path

The National Aeronautics and Space Administration (NASA) Advanced Air Transportation Technologies (AATT) project in cooperation with the Department of Transportation (DOT) Volpe National Transportation Systems Center (VNTSC) contracted with the System Resources Corporation (SRC) for the evaluation of the existing environment and the identification of user and service provider needs in the Gulf of Mexico low-altitude Offshore Sector. The results of this contractor activity are reported in the Gulf of Mexico Helicopter Offshore System Technologies Engineering Needs Assessment. A recommended system design and transition strategy was then developed to satisfy the identified needs within the constraints of the environment. This work, also performed under contract to NASA, is the subject of this report.

Koenke, Edmund J.↗

Space Mission Concept Development Using Concept Maturity Levels

Over the past five years, pre-project formulation experts at the Jet Propulsion Laboratory (JPL) has developed and implemented a method for measuring and communicating the maturity of space mission concepts. Mission concept development teams use this method, and associated tools, prior to concepts entering their Formulation Phases (Phase A/B). The organizing structure is Concept Maturity Level (CML), which is a classification system for characterizing the various levels of a concept's maturity. The key strength of CMLs is the ability to evolve mission concepts guided by an incremental set of assessment needs. The CML definitions have been expanded into a matrix form to identify the breadth and depth of analysis needed for a concept to reach a specific level of maturity. This matrix enables improved assessment and communication by addressing the fundamental dimensions (e.g., science objectives, mission design, technical risk, project organization, cost, export compliance, etc.) associated with mission concept evolution. JPL's collaborative engineering, dedicated concept development, and proposal teams all use these and other CML-appropriate design tools to advance their mission concept designs. This paper focuses on mission concept's early Pre-Phase A represented by CMLs 1- 4. The scope was limited due to the fact that CMLs 5 and 6 are already well defined based on the requirements documented in specific Announcement of Opportunities (AO) and Concept Study Report (CSR) guidelines, respectively, for competitive missions; and by NASA's Procedural Requirements NPR 7120.5E document for Projects in their Formulation Phase.

Concept Maturity Levels (CMLs)↗

EVI-X Updates and National Charging Assessment Report

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 30-42 million light-duty electric vehicles are on the road (including plug-in hybrids). We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a national network of 28 million charging ports (including public and private infrastructure) will be necessary in our mid adoption scenario. This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

The DECOVALEX international collaboration on modeling of coupled subsurface processes and its contribution to confidence building in radioactive waste disposal

Abstract The long-lived radiotoxicity of the high-level radioactive waste generated by nuclear power plants requires safe isolation from the biosphere for many hundreds of thousands of years. An international consensus has emerged that such isolation can best be provided by disposal in mined geologic repositories, a strategy that today is pursued by most countries dealing with radioactive waste. However, the need to predict the performance of such repositories over very long time periods generates large uncertainties that have to be accounted for in safety assessments. The findings from such safety assessments need to be conveyed to all stakeholders in a clear way, such that public confidence in geologic disposal solutions can be achieved. It is suggested here that close international collaboration on the technical aspects of geologic waste disposal has helped, and will continue to help, building trust and increasing confidence. This paper discusses a particular international collaboration initiative referred to as DECOVALEX, which brings together multiple teams and disciplines to collectively tackle complex experimental and modeling challenges related to geologic disposal. By describing how DECOVALEX works and by providing joint research examples, a case is made that such international collaboration contributes to knowledge transfer and confidence building in radioactive waste disposal science.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CONNECT Neutronics Initial Report

This report represents the first status update from the Creation of Next-generation Nuclear Energy Computational Technology (CONNECT) effort within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program and is intended to satisfy the reporting requirements of the following milestones: • M3MS-24OR0101321: Assess needs, requirements and opportunities for high-fidelity neutronics and transport as used in DOE-NE program. • M3MS-24AN0101301: Generate a community report on the needs, requirements, and opportunities for high-fidelity neutronics and transport as used in DOE-NE programs and industry. • M3MS-24OR0202433: Implement and assess numerical strategies leveraging Monte Carlo neutron transport on GPUs for production analysis. In particular, Sections 1, 2, and 3 detail the assessment of the current state of practice and the landscape of the broader advanced computing world to meet the objectives of M3MS-24OR0101321 and M3MS-24AN0101301, while Sections 4 and 5 describe new work during FY24 to extend current GPU Monte Carlo capabilities in areas relevant to active NEAMS development to satisfy M3MS-24OR0202433. Section 6 offers some thoughts about the potential future impact of Monte Carlo neutronics on NEAMS and the nuclear industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Schedule Risk Assessment

Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

Smith, Greg↗

Uncertain Pathways to a Future Safe Climate

Abstract Global climate change is often thought of as a steady and approximately predictable physical response to increasing forcings, which then requires commensurate adaptation. But adaptation has practical, cultural and biological limits, and climate change may pose unanticipated global hazards, sudden changes or other surprises–as may societal adaptation and mitigation responses. These poorly known factors could substantially affect the urgency of mitigation as well as adaptation decisions. We outline a strategy for better accommodating these challenges by making climate science more integrative, in order to identify and quantify known and novel physical risks including those arising from interactions with ecosystems and society. We need to do this even–or especially–when they are highly uncertain, and to explore risks and opportunities associated with mitigation and adaptation responses by engaging across disciplines. We argue that upcoming climate assessments need to be more risk‐aware, and suggest ways of achieving this. These strategies improve the chances of anticipating potential surprises and identifying and communicating “safe landing” pathways that meet UN Sustainable Development Goals and guide humanity toward a better future.

Sherwood, S. C.↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling U.S. Light-Duty Demand for EV Charging Infrastructure in 2030

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

33 ADVANCED PROPULSION SYSTEMS↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure; A Nationwide Assessment

Ambitious federal clean goals, along with historic investment in American manufacturing, have put the United States on track to see 30-42 million light-duty electric vehicles (EVs) on the road by 2030. Now, a groundbreaking study from the National Renewable Energy Laboratory (NREL) has estimated the EV charging infrastructure needed nationwide to support a sweeping transition to electrified transportation. The study, titled "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure," estimates the number, type, and location of the chargers needed to create a comprehensive network of EV charging infrastructure. Its use of proprietary NREL software tools and sophisticated analysis have resulted in a nationwide infrastructure needs assessment with a never-before-seen level of detail - one that takes into account the different ways Americans travel, from running errands to taking road trips, and can adjust to changing circumstances as EV adoption rates change over time.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Sensor Selection and Optimization for Health Assessment of Aerospace Systems

Aerospace systems are developed similarly to other large-scale systems through a series of reviews, where designs are modified as system requirements are refined. For space-based systems few are built and placed into service. These research vehicles have limited historical experience to draw from and formidable reliability and safety requirements, due to the remote and severe environment of space. Aeronautical systems have similar reliability and safety requirements, and while these systems may have historical information to access, commercial and military systems require longevity under a range of operational conditions and applied loads. Historically, the design of aerospace systems, particularly the selection of sensors, is based on the requirements for control and performance rather than on health assessment needs. Furthermore, the safety and reliability requirements are met through sensor suite augmentation in an ad hoc, heuristic manner, rather than any systematic approach. A review of the current sensor selection practice within and outside of the aerospace community was conducted and a sensor selection architecture is proposed that will provide a justifiable, dependable sensor suite to address system health assessment requirements.

Maul, William A.↗

Sensor Selection and Optimization for Health Assessment of Aerospace Systems

Aerospace systems are developed similarly to other large-scale systems through a series of reviews, where designs are modified as system requirements are refined. For space-based systems few are built and placed into service these research vehicles have limited historical experience to draw from and formidable reliability and safety requirements, due to the remote and severe environment of space. Aeronautical systems have similar reliability and safety requirements, and while these systems may have historical information to access, commercial and military systems require longevity under a range of operational conditions and applied loads. Historically, the design of aerospace systems, particularly the selection of sensors, is based on the requirements for control and performance rather than on health assessment needs. Furthermore, the safety and reliability requirements are met through sensor suite augmentation in an ad hoc, heuristic manner, rather than any systematic approach. A review of the current sensor selection practice within and outside of the aerospace community was conducted and a sensor selection architecture is proposed that will provide a justifiable, defendable sensor suite to address system health assessment requirements.

Maul, William A.↗

District Geothermal Heating + Cooling Deployment in a CT Environmental Justice Community

The report marks the team’s completion of all required tasks and milestones. Work completed for Task 1 (Technical and Economic Feasibility Assessment & Procurement Drafting) included development of analysis and design model; completion of technical, economic, and environmental assessments; and technical outreach and coalition design. Components for Task 2 (Outreach & Community Engagement) involved broad outreach and community-engagement efforts (including stakeholder meetings and a webinar as well as development of a formal engagement plan) and development of a web page and a case study. For Task 3 (Workforce Transition, Development, & Training Plan), the team undertook a formal statewide geothermal workforce needs assessment, developed corresponding recommendations for both the state as a whole and the Wallingford project, and held several workshops. For Task 4 (Project Management & Data Sharing), the team drafted a data-sharing plan.

15 GEOTHERMAL ENERGY↗

Coastal Online Analysis and Synthesis Tool 2.0 (COAST)

The Coastal Online Assessment and Synthesis Tool (COAST) 3D geobrowser has been developed to integrate disparate coastal datasets from NASA and other sources into a desktop tool that provides new data visualization and analysis capabilities for coastal researchers, managers, and residents. It is built upon the widely used NASA-developed open source World Wind geobrowser from NASA Ames (Patrick Hogan et al.) .Net and C# version is used for development. It is leveraged off of World Wind community shared code samples and COAST 2.0 enhancement direction is based on Coastal science community feedback and needs assessment (GOMA). The main objective is to empower the user to bring more user-meaningful data into multi-layered, multi-temporal spatial context.

Brown, Richard B.↗

Component-Level Electronic-Assembly Repair (CLEAR) Synthetic Instrument Capabilities Assessment and Test Report

The role of synthetic instruments (SIs) for Component-Level Electronic-Assembly Repair (CLEAR) is to provide an external lower-level diagnostic and functional test capability beyond the built-in-test capabilities of spacecraft electronics. Built-in diagnostics can report faults and symptoms, but isolating the root cause and performing corrective action requires specialized instruments. Often a fault can be revealed by emulating the operation of external hardware. This implies complex hardware that is too massive to be accommodated in spacecraft. The SI strategy is aimed at minimizing complexity and mass by employing highly reconfigurable instruments that perform diagnostics and emulate external functions. In effect, SI can synthesize an instrument on demand. The SI architecture section of this document summarizes the result of a recent program diagnostic and test needs assessment based on the International Space Station. The SI architecture addresses operational issues such as minimizing crew time and crew skill level, and the SI data transactions between the crew and supporting ground engineering searching for the root cause and formulating corrective actions. SI technology is described within a teleoperations framework. The remaining sections describe a lab demonstration intended to show that a single SI circuit could synthesize an instrument in hardware and subsequently clear the hardware and synthesize a completely different instrument on demand. An analysis of the capabilities and limitations of commercially available SI hardware and programming tools is included. Future work in SI technology is also described.

Oeftering, Richard C.↗