Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “moving mirrors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A mirror instability associated with newly created ions in a moving plasma

Using a plasma model in which the ambient magnetic field is parallel to the z axis and the wave vector, an instability that resembles the usual hydromagnetic mirror instability is demonstrated. The instability is caused by freshly created ions in a moving plasma; the source of its free energy is associated with the ring distribution of the newly created ions, resulting in a high ion kinetic temperature in the direction transverse to the ambient magnetic field. The results of a stability analysis indicate that this instability can lead to the amplification of magnetosonic waves.

Wu, C. S.↗

Artificial intelligence time series forecasting for feed-forward laser stabilization

Laser plasma accelerators, typically operating at 1–10 Hz repetition rates, have the ability to produce high-quality electron beams in compact, all-optical-driven configurations, with the electron beams uniquely suited for a wide variety of accelerator-based applications. However, fluctuations and drifts in the laser delivery to the meter-scaled and below plasma target (the electron beam source) will translate into electron beam source variations that can limit their utility for demanding applications like light sources or linear colliders. Commercially available active feedback laser stabilization systems are intrinsically bandwidth limited due to their integration with multi-inch corrective mirror mounts which minimizes their effectiveness. In this manuscript, we present a Neural Network time series forecaster that can predict laser position fluctuations of the laser delivery to the final target well ahead of a future laser shot. The Root-Mean-Square-Error (RMSE) of the prediction accuracy was < 2 μ m for a 1 / e 2 beam radius of 34 μ m . Our feed-forward approach serves as a first-step in circumventing the bandwidth limitations imposed by the currently available stabilization systems since it allows for mirrors to be moved into position ahead of time to offset the predicted future position drift. This will help advance laser plasma accelerator research by providing greater robustness and stability needed for its applications.

Berger, Curtis↗

A high speed pointing system

A laser ranging system for use with the Space Shuttle, and applied to a precise determination of the distance between points arrayed on different tectonic plates, i.e., along the San Andreas fault, spaced at distances of 25, 50, and 100 km, is discussed with attention to the orbiting pointing system. The mount carrying the system contains a single elliptical mirror which directs ten laser firings per second (15-18 firings to each target), and receives the light reflected from the target. The mirror and all moving structural parts are constructed of Be. The axes are equipped with 19-bit shaft angle encoders and brushless torque motors. Care is taken to avoid structural resonances, and to ensure a minimum of servo settling time. A Kalman filter is used with the microprocessor system to interpolate low data rate commands to the higher data rates required by the pointing system.

Winston, G. C.↗

An adjustable solar concentrator

Fixed cylindrical converging lenses followed by movable parabolic mirror focus solar energy on conventional linear collector. System is low cost and accomodates daily and seasonal movements of the sun. Mirrors may be moved using simple, low-power electrical motors.

Collins, E. R., Jr.↗

The Magsat three axis arc second precision attitude transfer system

The Magsat Attitude Transfer System (ATS), which provides attitude alteration in pitch, yaw, and roll is described. A remote vector magnetometer extends from Magsat on a 20 ft boom, requiring vector orientation by reference to coordinate axes determined by a set of star mapping cameras. The ATS was designed to perform in a solar illuminated environment by using an optically narrow bandwidth with synchronous demodulation at 9300 A. The pitch/yaw optical design, the electrooptics, and signal and switching diagrams are provided. Simple mirrors with no moving parts are placed on the magnetometer to reflect a collimated beam from the ATS for attitude indication, which is accurate to one part in 96. Alignment was completed within 24 hr after launch.

Schenkel, F. W.↗

Electro-optical Tuning of Fabry-Perot Interferometers

Compact unit operates much faster than conventional piezoelectric scanners. High voltage creates electric field in Pockels cell, changing refractive properties. Cell changes optical path length between mirrors without mechanically moving anything in gap. High voltage varied rapidly to scan interferometer. Voltage applied longitudinally or transversely, depending on type of Pockels cell. New electro-optic scanner scans given range in one-millionth time of piezoelectric scanner - tens to hundreds of nanoseconds per interferometer order. Also reducing size of interferometer.

Schwemmer, G. K.↗

Steps towards 8m honeycomb mirrors. V - A method for polishing aspheres as fast as f/1

The present method for the polishing of near-f/1 aspherics employs a lap whose shape is continuously changed under computer control as it moves over the rigid mirror blank. Required changes of radius, astigmatism, and coma in a circular lap are accomplished by means of edge-bending levers and tensioning members that use screw actuators. Attention is given to the case of an f/1, 8-m diameter paraboloid whose mirror blank has been cast in a centrifugally stressed, rotating furnace to within 1 mm of the desired optical figure. Attention is also given to the mechanical design of the active lap.

Angel, J. R. P.↗

Straylight comparison of SIRTF designs with different aperture stop locations

The APART/PADE program is used to examine whether the SIRTF aperture stop can be moved back to the primary mirror without jeopardizing the requirement for natural background-limited observations. The straylight performance of the baseline design, which has the aperture stop at the secondary mirror, is compared to that of a revised design with the stop at the primary mirror. Both designs include reimaging optics and a LYOT stop, as well as a chopping secondary mirror. The straylight due to off-axis sources and telescope thermal emission is investigated at 50 and 550 microns. It is found that in SIRTF, where every instrument will include reimaging optics and a LYOT stop, the aperture stop may be moved to the primary mirror with modest degradation of the straylight performance.

Dinger, Ann S.↗

Large Space Optics: From Hubble to JWST and Beyond

If necessity truly is the mother of invention, then advances in lightweight space mirror technology have been driven by launch vehicle mass and volume constraints. In the late 1970 s, at the start of Hubble development, the state of the art in ground based telescopes was 3 to 4 meter monolithic primary mirrors with masses of 6000 to 10,000 kg - clearly too massive for the planned space shuttle 25,000 kg capability to LEO. Necessity led Hubble to a different solution. Launch vehicle mass constraints (and cost) resulted in the development of a 2.4 meter lightweight eggcrate mirror. At 810 kg (180 kg/m2), this mirror was approximately 7.4% of HST s total 11,110 kg mass. And, the total observatory structure at 4.3 m x 13.2 m fit snuggly inside the space shuttle 4.6 m x 18.3 m payload bay. In the early 1990 s, at the start of JWST development, the state of the art in ground based telescopes was 8 meter class monolithic primary mirrors (16,000 to 23,000 kg) and 10 meter segmented mirrors (14,400 kg). Unfortunately, launch vehicles were still constrained to 4.5 meter payloads and 25,000 kg to LEO or 6,600 kg to L2. Furthermore, science now demanded a space telescope with 6 to 8 meter aperture operating at L2. Mirror technology was identified as a critical capability necessary to enable the next generation of large aperture space telescopes. Specific telescope architectures were explored via three independent design concept studies conducted during the summer of 1996 (1). These studies identified two significant architectural constraints: segmentation and areal density. Because the launch vehicle fairing payload dynamic envelop diameter is approximately 4.5 meters, the only way to launch an 8 meter class mirror is to segment it, fold it and deploy it on orbit - resulting in actuation and control requirements. And, because of launch vehicle mass limits, the primary mirror allocation was only 1000 kg - resulting in a maximum areal density of 20 kg/m2. At the inception of JWST in 1996, such a capability did not exist. A highly successful technology development program was initiated resulting in matured and demonstrated mirror technology for JWST (2, 3). Today, the JWST 6.5 meter primary mirror has an areal density of 25 kg/m2 for a total mass of 625 kg or 9.6% of the total JWST observatory mass of 6,500 kg. Looking into the future, science requires increasing larger collecting apertures. Ground based telescopes are already moving towards 30+ meter mirrors. The only way to meet this challenge for space telescopes is via even lower areal density mirrors or on-orbit assembly or larger launch vehicles (4). The planned NASA Ares V with its 10 meter fairing and 55,000 kg payload to L2 eliminates this constraint (5).

Stahl, H. Philip↗

JWST Wavefront Control Toolbox

A Matlab-based toolbox has been developed for the wavefront control and optimization of segmented optical surfaces to correct for possible misalignments of James Webb Space Telescope (JWST) using influence functions. The toolbox employs both iterative and non-iterative methods to converge to an optimal solution by minimizing the cost function. The toolbox could be used in either of constrained and unconstrained optimizations. The control process involves 1 to 7 degrees-of-freedom perturbations per segment of primary mirror in addition to the 5 degrees of freedom of secondary mirror. The toolbox consists of a series of Matlab/Simulink functions and modules, developed based on a "wrapper" approach, that handles the interface and data flow between existing commercial optical modeling software packages such as Zemax and Code V. The limitations of the algorithm are dictated by the constraints of the moving parts in the mirrors.

Shin, Shahram Ron↗

SM91: Observations of interchange between acceleration and thermalization processes in auroral electrons

Results from a Nike-Tomahawk sounding rocket flight launched from Fort Churchill are presented. The rocket was launched into a breakup aurora at magnetic local midnight on 21 March 1968. The rocket was instrumented to measure electrons with an electrostatic analyzer electron spectrometer which made 29 measurements in the energy interval 0.5 KeV to 30 KeV. Complete energy spectra were obtained at a rate of 10/sec. Pitch angle information is presented via 3 computed average per rocket spin. The dumped electron average corresponds to averages over electrons moving nearly parallel to the B vector. The mirroring electron average corresponds to averages over electrons moving nearly perpendicular to the B vector. The average was also computed over the entire downward hemisphere (the precipitated electron average). The observations were obtained in an altitude range of 10 km at 230 km altitude.

Pongratz, M.↗

Advanced Ka-Band Transceiver With Monopulse Tracking

A proposed Ka-band transmitting/ receiving system would embody a unique combination of established and semi-proven design features. The proposed system (see figure) would include a monopulse receiving feedback loop and a mirror that could be moved by piezoelectric actuators in the feedback loop to adjust the aim of the transmitted and received radio beams. Unlike in a phased-array tracking system, phase shifters (which can be complex and expensive) would not be needed in this monopulse tracking system. Moreover, the monopulse-tracking loop could be combined with other subsystems used in established subreflector and antenna designs. The final transmitter power amplifier in the proposed system would be a quasi-optical power amplifier (QOPA) -- a combination of a planar array of 25 amplifiers and corresponding planar arrays of antenna elements, such that free-space power combining would take place at the output.

Khan, Abdur↗

Thermal Infrared Sensor (TIRS) Instrument Thermal Subsystem Design and Lessons Learned

The Thermal Infrared Sensor (TIRS) is one of two instruments on the Landsat Data Continuity Mission (LDCM), which is scheduled to launch in February of 2013. The TIRS instrument was officially added to the mission later in the flow, which led to a highly aggressive schedule that became one of the main drivers during instrument development. The thermal subsystem design of the TIRS Sensor Unit is comprised of five thermal zones which range in temperature from less than 43 Kelvin to 330 Kelvin. Most zones are proportional heater controlled, and all are within a volume of 35 cu.ft. A two-stage cryocooler is used to cool the "cold stage" including three QWIP detectors to less than 43 Kelvin, and cool the "warm stage" to 105 Kelvin. The excess power dissipation from the cryocooler is rejected via ammonia transport heat pipes to a dedicated Cryocooler Radiator with embedded ammonia heat pipes. The cryogenic subsystem includes a series of shells used to radiatively and conductively isolate the cold stage from the warmer surroundings. The Optical System (telescope) is passively cooled to 180-190 Kelvin using a "thermal link" (comprised of a Flexible Conductive Thermal Strap and an APG Bar) which couples the telescope stage to a dedicated radiator with embedded ethane heat pipes. The Scene Select Mechanism, which is responsible for moving the Scene Select Mirror to three distinct positions (including Nadir, Space, and On-board Black Body Calibrator pointing), runs nominally at 278 Kelvin and is thermally isolated from the cryogenic thermal zones. The On-board Black Body Calibrator requires a dedicated radiator which allows for a temperature range of 260-330 Kelvin at the Source. The detectors are powered by the FPE Box, which is mounted to the nadir external surface of the composite honeycomb structure. There are two additional electronics boxes which are wet-mounted directly to the spacecraft shear panel, the Main Electronics Box and Cryocooler Electronics Box; thermal control of these boxes is the responsibility of Orbital Sciences Corporation, the spacecraft developer. The TIRS thermal subsystem design was successfully verified during months of testing campaign, from component & subsystem level to two instrument-level thermal vacuum tests. The Instrument, despite an aggressive schedule, was delivered to the spacecraft vendor in February of 2012 and is currently undergoing the final stages of spacecraft environmental testing in preparation for launch.

Otero, Veronica↗

Improvements in Reflected Target Non-intrusive Assessment (ReTNA)

Accurate optical surfaces are a primary driver of concentrated solar power plant performance. Errors in pointing and tracking mirrors, the canting of individual mirror facets, and the surface slope of the mirror itself can be caused by errors during assembly, transportation, wind loading, gravity, and many other sources. The tools that exist to measure these error sources today largely rely on fringe deflectometry (SOFAST, QDec, others), or photogrammetry with targets attached to the mirror surface. In 2022, NREL presented a new indoor optical measurement system to measure fully assembled heliostats during development and on the assembly line for quality assurance purposes, which has undergone significant development in the last year, including the installation of a new, larger laboratory setup. This system, called ReTNA (Reflected Target Non-intrusive Assessment), uses a printed pattern as a deflectometry target. Using printed pattern features as deflectometry targets instead of fringes allows the software to measure the surface slope in two dimensions, eliminating the need to for changing, projected targets. In the last year, NREL's ReTNA tool has been adapted to use a tall, thin target, that only spans one dimension of the mirror, and a camera moving on an automatic track system. We will present these new developments, including the new setup, target patterns, software methodology for fast, automatic optical analysis, and important lessons learned throughout the process. ReTNA results will be compared to established tools, to establish the uncertainty of this new method. ReTNA leverages recent improvements in computer vision and photogrammetry to remove as much careful calibration from the setup process as possible, making the tool low cost, simple, and portable. While it will not achieve the resolution of a fringe deflectometry system, its advantages make it well suited for CSP evaluation, and allow it to fill a different industry need.

concentrating solar power↗

Low-Cost Heliostat for High-Flux Small-Area Receivers (Final Technical Report)

This project analyzed a two-stage heliostat concept consisting of a tracking stage and a concentrating stage. The tracking stage uses mirrors mounted on a common drive that move to track the sun. The concentrating stage consists of stationary mirrors that each have a unique angle to direct rays towards a small-area, high-flux, point-focused receiver. By splitting the collection and concentrating process into two stages, multiple small, inexpensive mirrors can share a structure and be controlled by a single drive in the tracking stage. The project effort developed modeling techniques that were specifically relevant to this two-stage heliostat concept. Both field-level and unit-level models were developed. The field-level model does not explicitly consider unit-level losses which are predicted by the unit-level model and then integrated into the field-level model through a correlation referred to as an efficiency modifier. This approach is referred to as the two-model approach; the development and demonstration of this two-model approach for a multi-stage heliostat technology is a key outcome of this work. The field-level model is used to design a field that hits a specific design day power given a set of heliostat design parameters. An oversized field is simulated and then heliostat units are removed based on their annual energy production in order to generate the highest performing field. The field reduction procedure fits a smooth curve fit to annual energy production as a function of position in the field which has the effect of reducing the noise that is otherwise caused by the Monte Carlo ray tracing technique. This approach is referred to as the annual energy fit method and substantially reduces computational run time for a given field level modeling accuracy. The annual energy fit approach enables the selection of a properly sized, high-performing field using orders of magnitude fewer rays than would otherwise be possible and the development of this approach is a second key outcome of this work. These models are used within a genetic optimization algorithm in order to optimize the geometric parameters associated with a heliostat in order to achieve the lowest cost per unit of collected design day power. The cost modeling that underlies the optimization is a simple, scaling type analysis backed up by a much more detailed Design for Manufacture and Assembly (DFMA) analysis. Although the figure of merit used for optimization was not cost per mirror area, this metric is reasonable to use as a means of comparison. The optimally designed 500 kW design has a tracking mirror specific cost of $181.85/m 2 , which is significantly larger than the target value and also larger than the current state of the art. The cost of the torque-tube type linkages contributed substantially to the overall cost. Based on this observation, potentially attractive alternative design configuration utilizing a capstan type actuation system should be investigated. Finally, NREL compared the performance of the two-stage heliostat to the performance of a focused and different sized flat conventional heliostats and showed that, as expected, additional losses versus the convention heliostat caused by a worse cosine efficiency, two stages of reflection, and interstage interactions. The two-stage heliostat requires around 75% more reflective area than a flat 1x1 meter conventional heliostat (similar to a focused heliostat) and 40% more than a flat 2x2 meter conventional heliostat.

14 SOLAR ENERGY↗

Use of a Fourier transform spectrometer on a balloon-borne telescope and at the multiple mirror telescope (MMT)

The design and use of an infrared Fourier transform spectrometer which has been used for observations of laboratory, stratospheric, and astronomical spectra are described. The spectrometer has a spectral resolution of 0.032/cm and has operated in the mid-infrared (12 to 13 microns) as well as the far-infrared (40 to 140 microns), using both bolometer and photoconductor cryogenic detectors. The spectrometer is optically sized to accept an f/9 beam from the multi-mirror telescope (MMT). The optical and electronic design are discussed, including remote operation of the spectrometer on a balloon-borne 102-cm telescope. The performance of the laser-controlled, screw-driven moving cat's-eye mirror is discussed. Segments of typical far-infrared balloon flight spectra, lab spectra, and mid-infrared MMT spectra are presented. Data reduction, interferogram processing, artifact removal, wavelength calibration, and intensity calibration methods are discussed. Future use of the spectrometer is outlined.

Traub, W. A.↗

Tracking falling objects

Moving lens follows movement of object accelerated by gravity. Lenses and mirrors maintain constant magnification regardless of distance between moving optical carriage mechanism and fixed telescope. Device tracks objects up to 2 cm in diameter over vertical distance of 2 m.

Frazer, R. E.↗