Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mixed integer linear programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Autonomous Guidance of Agile Small-scale Rotorcraft

This report describes a guidance system for agile vehicles based on a hybrid closed-loop model of the vehicle dynamics. The hybrid model represents the vehicle dynamics through a combination of linear-time-invariant control modes and pre-programmed, finite-duration maneuvers. This particular hybrid structure can be realized through a control system that combines trim controllers and a maneuvering control logic. The former enable precise trajectory tracking, and the latter enables trajectories at the edge of the vehicle capabilities. The closed-loop model is much simpler than the full vehicle equations of motion, yet it can capture a broad range of dynamic behaviors. It also supports a consistent link between the physical layer and the decision-making layer. The trajectory generation was formulated as an optimization problem using mixed-integer-linear-programming. The optimization is solved in a receding horizon fashion. Several techniques to improve the computational tractability were investigate. Simulation experiments using NASA Ames 'R-50 model show that this approach fully exploits the vehicle's agility.

Mettler, Bernard↗

A stochastic biomass blending problem in decentralized supply chains

Blending biomass materials of different physical or chemical properties provides an opportunity to adjust the quality of the feedstock to meet the specifications of the conversion platform. We propose a model which identifies the right mix of biomass to optimize the performance of the thermochemical conversion process at the mini-mum cost. This is a chance-constraint programming (CCP) model which takes into account the stochastic nature of biomass quality. The proposed CCP model ensures that process requirements, which are impacted by physical and chemical properties of biomass, are met most of the time. We consider two problem settings, a centralized and a decentralized supply chain. We propose a mixed-integer linear program to model the blending problem in the centralized setting and a bilevel program to model the blending problem in the decentralized setting. We use the sample average approximation method to approximate the chance constraints, and propose solution algorithms to solve this approximation. We develop a case study for South Carolina using data provided by the Billion Ton Study. Based on our results, the blends identified consist mainly of pine and softwood residues. The blends identified and the suppliers selected by both models are different. The cost of the centralized supply chain is 2%–6% lower. The implications of these results are twofold. First, these results could lead to improved collaborations in the supply chain. Second, these results provide an estimate of the approximation error from assuming centralized decision making in the supply chain.

09 BIOMASS FUELS↗

Bi-Level Adaptive Storage Expansion Strategy for Microgrids Using Deep Reinforcement Learning

Battery energy storage (BES) is a versatile resource for the secure and economic operation of microgrids (MGs). Prevailing stochastic optimization-based approaches for BES expansion planning for MGs are computationally complicated. This work proposes a data-driven bi-level multi-period BES expansion planning framework to determine the siting, sizing, and timing of BES installations. The proposed planning framework unifies deep reinforcement learning (DRL) and linear programming, thereby decoupling the determinations for the integer and continuous decision variables in two time scales, respectively. In the upper level, a rainbow DRL agent with quantile regression is trained to provide dynamic planning policies to accommodate stochastic renewable energy resources (RESs), load, and battery price changes efficiently. Further, the lower level computes the optimal operation of MGs with frequency constraints to hedge the islanding contingency. The two levels communicate with one another by exchanging storage configuration and operating expenses in order to accomplish the shared goal of minimizing investment and operation costs. Comparative case studies on an MG are carried out to demonstrate the superiority of the proposed DRL-based solution to the mixed-integer linear programming counterpart on efficiency, scalability, and adaptability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Building Load Control Using Distributionally Robust Chance-Constrained Programs with Right-Hand Side Uncertainty and the Risk-Adjustable Variants

Aggregation of heating, ventilation, and air conditioning (HVAC) loads can provide reserves to absorb volatile renewable energy, especially solar photo-voltaic (PV) generation. In this paper, we decide HVAC control schedules under uncertain PV generation, using a distributionally robust chance-constrained (DRCC) building load control model under two typical ambiguity sets: the moment-based and Wasserstein ambiguity sets. We derive mixed integer linear programming (MILP) reformulations for DRCC problems under both sets. Especially, for the Wasserstein ambiguity set, we use the right-hand side (RHS) uncertainty to derive a more compact MILP reformulation than the commonly known MILP reformulations with big-M constants. All the results also apply to general individual chance constraints with RHS uncertainty. Furthermore, we propose an adjustable chance-constrained variant to achieve tradeoff between the operational risk and costs. We derive MILP reformulations under the Wasserstein ambiguity set and second-order conic programming (SOCP) reformulations under the moment-based set. Using real-world data, we conduct computational studies to demonstrate the efficiency of the solution approaches and the effectiveness of the solutions. Summary of Contribution: The problem studied in this paper is motivated by a building load control problem that uses the aggregation of heating, ventilation, and air conditioning (HVAC) loads as flexible reserves to absorb uncertain solar photovoltaic (PV) generation. The problem is formulated as distributionally robust chance-constrained (DRCC) programs with right-hand side (RHS) uncertainty. In addition, we propose a risk-adjustable variant of the DRCC programs, where the risk level, instead of being predetermined, is treated as a decision variable. The paper aims to provide tractable reformulations and solution algorithms for both the (general) DRCC and the (general) adjustable DRCC models with RHS uncertainty.

97 MATHEMATICS AND COMPUTING↗

Uncertainty-Informed Operation Coordination in a Water-Energy Nexus

The widespread deployment of smart heterogeneous technologies and the growing complexity in our modern society calls for effective coordination of the interdependent lifeline networks. In particular, operation coordination of electric power and water infrastructures is urgently needed as the water system is one of the most energy-intensive networks, an interruption in which may quickly evolve into a dramatic societal concern. This paper develops a novel analytic for uncertainty-aware day-ahead operation optimization of the interconnected power and water systems (PaWS). Joint probabilistic constraint (JPC) programming is employed to capture the uncertainties in wind resources and water demand forecasts. The proposed integrated stochastic model is presented as a non-linear non-convex optimization problem, where the non-linear hydraulic constraints in the water network are linearized using piece-wise linearization technique, and the non-convexity is efficiently tackled with a solution methodology to convert the proposed model with JPCs to a tractable mixed-integer linear programming (MILP) formulation that can be quickly solved to optimality. Here, the suggested framework is applied to a 15-node commercial-scale water network jointly operated with a power transmission system using a modified IEEE 57-bus test system. The numerical results demonstrate the of the proposed stochastic framework, resulting in cost reduction (13% on average when compared to the traditional setting) and energy saving of the integrated model under different realizations of uncertain renewable energy sources (RESs) and water demand scenarios. Additionally, the scalability of the proposed model is tested on a modified IEEE 118-bus test system connected to five water networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solving the Unit Commitment Problem: Polyhedral Theory, Symmetry, and Power Flow

In this talk, I will give an overview of mixed integer linear programming (MILP) formulations and extensions thereof which enable the effective solution of the unit commitment problem (UC) when paired with a commercial MILP solver. First, we will place UC in context, stressing the importance of achieving a (near) optimal solution. Then we will discuss the importance of perfect and "good-enough" formulations for individual generators / market participants. Some of these formulations enable symmetry-aware reformulations for identical market participants, which can be critical when symmetry is present. Finally, we will discuss approximations of AC power flow currently used in practice, and the challenges with including these approximations within the UC formulation.

MATHEMATICS AND COMPUTING↗

Solar Field Layout and Aimpoint Strategy Optimization

The existing methods that determine heliostat aiming strategies for concentrating solar power (CSP) central receiver plants typically use heuristics and/or are computationally expensive, and they lack flexibility for different desired flux profiles and receiver geometries. Because of the interaction between layout and aimpoint strategy, considering the former without accounting for the latter may yield solutions with superfluous heliostats that cannot be used efficiently without compromising receiver flux constraints. To that end, we develop a software decision tool that uses innovative optimization methods to both optimize aimpoint strategies and improve candidate layouts for the solar collection field of a CSP central receiver plant. A CSP plant’s effectiveness relies on the optical efficiency of the solar field, which may be limited by losses due to (i) the cosine effect, (ii) atmospheric attenuation, (iii) interference (i.e., shading and blocking) between heliostats, (iv) spillage as a result of heliostat positioning and geometry, and (iv) some heliostats’ inability to direct irradiance to the receiver without damage due to excessive thermal flux. The goal of this work is to obtain optimized aiming strategies and improved solar field layouts that reduce capital cost and increase field optical efficiency and utilization, while meeting the power requirements of a given CSP receiver design. We formulate the aimpoint optimization problem as a mixed-integer linear programming model, which we then decompose into submodels that we solve in parallel. The decomposition subdivides the solar field into sections, and aimpoint strategies for each section are obtained independently of the others. To improve existing layouts, we develop a utilization-weighted efficiency metric that we use to relocate heliostats to sections of the solar field with similar efficiency and higher utilization. Finally, to connect our software to high-fidelity flux models, we develop a Python application programming interface for SolarPILOT, a mature software package that characterizes solar field performance and generates the heliostat layouts and flux maps that serve as input to our models.

14 SOLAR ENERGY↗

Framework for optimization of long-term, multi-period investment planning of integrated urban energy systems

In order to achieve stringent greenhouse gas emission reductions, a transition of our entire energy system from fossil to renewable resources needs to be designed. Such an energy transition brings two main challenges: most renewables generate variable electric energy, yet most demand is currently not electric (carrier mismatch) and does not always manifest at the same time as supply (temporal mismatch). Integrating multiple energy infrastructures can address both challenges by using the synergy between different energy carriers; building on existing infrastructure, while allowing a robust and flexible integration of the new. This paper proposes an optimization framework for long-term, multi-period investment planning of urban energy systems in an integrated manner. We formulate it as a mixed-integer linear program, combining a capacitated facility location with a multi-dimensional, capacitated network design problem. It includes generation and network expansion planning as well as interconnections between networks and storage infrastructure for each energy system. It can incorporate pathway effects like techno-economic developments, policy measures, and weather variations. The intended use is to support urban decision makers with long-term investment planning, though it can be tailored to fit other geographical or temporal scales. We demonstrate the model using two cases based on an average city in The Netherlands, which wants to reduce its CO 2 -emissions with 95% by 2050. In the first case, we include explicit carbon-emission constraints to study the effects of the carrier mismatch. In the second case, we implement interannual weather variations to analyze the temporal mismatch. The results give valuable insights into the energy transition design strategy for urban decision makers. They also show the future potential, as well as the computational challenges of the optimization framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Environmental and economic optima of solar home systems design: A combined LCA and LCC approach

Here, we compare the economic and environmental optimal design of Solar Home Systems (SHSs) and explore the role of economic incentives (such as tariffs and technology costs) in approximating the two optima. To achieve that, we present a methodology for the environmental and economic evaluation of grid-connected SHSs: user-scale electric systems involving a photovoltaic (PV) power system and a battery energy storage system. The proposed methodology is based on a mixed integer linear programming (MILP) optimization, life cycle assessment and life cycle costing. This methodological framework is applied to a case study involving a typical SHS installation in Italy. The results of the environmental optimal design brought to the evaluation of a 3.25 kW PV assisted by 8.66 kWh of nickel cobalt manganese batteries, whereas the costs of the SHS are minimized by a small PV system (less than 1 kW). Results underline that the environmental optimal configurations rely on battery technologies, which entails a significant cost compared to the grid connection. In contrast, the economic optimal design solutions is less impactful than the grid mix both from an environmental and economic points of view. Thanks to a reduction of batteries and PV costs, the environmental impact of the economic optimal design is expected to decrease in the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Decomposing a renewable energy design and dispatch model

We address a mixed-integer linear programming model which selects a cost-minimizing set of available technologies with which to design a renewable energy system and prescribe their associated dispatch decisions. Realistically sized instances of such models pose computational challenges. To this end, we develop a Lagrangian heuristic based on a decomposition methodology which partitions the model into blocks and optimizes these more manageable, smaller subproblems. It also provides a lower bound to assess solution quality. In conclusion, we apply this methodology to the National Renewable Energy Laboratory's Renewable Energy Integration and Optimization (REopt TM ) model to generate near-optimal solutions to realistic instances containing, on average, approximately 300,000 variables and at least as many constraints, with a mean 30% optimality gap improvement using a five-minute solution time limit, compared to directly solving the original monolith.

97 MATHEMATICS AND COMPUTING↗

Optimal assignment for the single-household shared autonomous vehicle problem

Autonomous vehicles have the potential to transform the way people are transported. While driverless technology may mean fewer vehicles are required to transport people to and from their daily activities, such changes may result in increased congestion or total miles traveled. In this study, we solve the single-household shared autonomous vehicle problem to identify cost-optimal routings of vehicles throughout the day. Such a tool will be useful for consumers seeking to minimize cost and for regulators seeking to understand and predict how people may behave in different scenarios. Here, we provide a thorough literature review and construct a mixed-integer linear program to minimize the daily travel cost of a household attending a given set of activities. Since solution time is a determinant for applicability of such a model, we present the model in a component-wise fashion. This approach allows us to understand which features most affect the problem complexity and solution time. We note that modeling carpooling is the feature that most increases time to find an optimal solution, and we therefore propose a novel modeling technique for carpooling two people. We illustrate the performance of our model by comparing it with other models from the literature and note that our model can solve significantly larger problem instances and in a time that is short enough to facilitate real-time scheduling. We also highlight the utility of our model for regulators, who can use it to analyze quickly produced optimal routes under different cost/tax scenarios.

33 ADVANCED PROPULSION SYSTEMS↗

Improving operational flexibility of integrated energy system with uncertain renewable generations considering thermal inertia of buildings

Insufficient flexibility in system operation caused by traditional "heat-set" operating modes of combined heat and power (CHP) units in winter heating periods is a key issue that limits renewable energy consumption. In order to reduce the curtailment of renewable energy resources through improving the operational flexibility, a novel optimal scheduling model based on chance-constrained programming (CCP), aiming at minimizing the lowest generation cost, is proposed for a small-scale integrated energy system (IES) with CHP units, thermal power units, renewable generations and representative auxiliary equipments. In this model, due to the uncertainties of renewable generations including wind turbines and photovoltaic units, the probabilistic spinning reserves are supplied in the form of chance-constrained; from the perspective of user experience, a heating load model is built with consideration of heat comfort and inertia in buildings. To solve the model, a solution approach based on sequence operation theory (SOT) is developed, where the original CCP-based scheduling model is tackled into a solvable mixed-integer linear programming (MILP) formulation by converting a chance constraint into its deterministic equivalence class, and thereby is solved via the CPLEX solver. We report the simulation results on the modified IEEE 30-bus system demonstrate that the presented method manages to improve operational flexibility of the IES with uncertain renewable generations by comprehensively leveraging thermal inertia of buildings and different kinds of auxiliary equipments, which provides a fundamental way for promoting renewable energy consumption.

30 DIRECT ENERGY CONVERSION↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Designing a GIS-based supply chain for producing carinata-based sustainable aviation fuel in Georgia, USA

Carinata is a potential crop for sustainable aviation fuel (SAF) production in the southern USA. However, as a novel crop, the cost-effectiveness and environmental feasibility of carinata feedstock are unknown, and there are questions about the optimal supply chain configuration for carinata-based SAF production. This study aims to design a supply chain model for carinata-based SAF production by optimizing the location of farms and facilities (e.g. storage units, crushing mills, biorefineries) for a minimum transportation cost under a set of supply and demand conditions. An integrated mixed-integer linear programming (MILP) model was combined with geographical information system (GIS) analysis to design a spatially explicit supply chain configuration. The GIS-based network analysis considered all of the counties in Georgia to set the candidate locations of carinata farms and facilities, and determined minimum cost and emission routes between those counties and the airport using existing transportation networks and modes (e.g. road, rail and pipeline). The MILP model determined the final selection of the farms and the number of facilities and their locations over those minimum-cost routes. With this supply chain configuration, the minimum price of SAF was $\$$0.92 L –1 , which is $\$$0.44 higher than conventional aviation fuel (CAF). The associated carbon intensity of SAF was estimated at 940.7 g CO 2 e L –1 , a reduction of 66% relative to the carbon intensity of equivalent CAF. The study found that a carbon tax (or subsidy) of $\$$230.48 t CO 2 e –1 would be needed to overcome the cost differential with CAF and promote carinata-based SAF in Georgia.

09 BIOMASS FUELS↗

Holistic fleet optimization incorporating system design considerations

The methodology described in this article enables a type of holistic fleet optimization that simultaneously considers the composition and activity of a fleet through time as well as the design of individual systems within the fleet. Often, real-world system design optimization and fleet-level acquisition optimization are treated separately due to the prohibitive scale and complexity of each problem. Importantly, this means that fleet-level schedules are typically limited to the inclusion of predefined system configurations and are blind to a rich spectrum of system design alternatives. Similarly, system design optimization often considers a system in isolation from the fleet and is blind to numerous, complex portfolio-level considerations. In reality, these two problems are highly interconnected. To properly address this system-fleet design interdependence, we present a general method for efficiently incorporating multi-objective system design trade-off information into a mixed-integer linear programming (MILP) fleet-level optimization. This work is motivated by the authors' experience with large-scale DOD acquisition portfolios. However, the methodology is general to any application where the fleet-level problem is a MILP and there exists at least one system having a design trade space in which two or more design objectives are parameters in the fleet-level MILP.

97 MATHEMATICS AND COMPUTING↗

Sequence of polyhedral relaxations for nonlinear univariate functions

Here, given a nonlinear, univariate, bounded, and differentiable function f(x), this article develops a sequence of Mixed Integer Linear Programming (MILP) and Linear Programming (LP) relaxations that converge to the graph of f(x) and its convex hull, respectively. Theoretical convergence of the sequence of relaxations to the graph of the function and its convex hull is established. For nonlinear non-convex optimization problems, the relaxations presented in this article can be used to construct tight MILP and LP relaxations. These MILP and the LP relaxations can also be used with MILP-based and spatial branch-and-bound based global optimization algorithms, respectively.

42 ENGINEERING↗