Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “measurement and verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Characterization and effects of impurities on carbonate quantification in heterogenous matrices

Mineral carbonation simulates a natural weathering phenomena by breaking down silicates and oxides to form Ca & Mg carbonates. Various mineralization methods have been demonstrated as a potential technique to improve the quality of slags and tailings through neutralization and stabilization of problematic species to yield a product better suited for use in concrete. This study aims to characterize, quantify and analyze carbonates in various carbonated products such as mineralized CaCO 3 , CO 2 mineralized Steel Slags and Mine Tailings. More than 10 samples were analyzed for carbonate measurement and verification from industrial and academic partners that pioneer commercial CO 2 mineralization technologies. The samples were characterized primarily by using X-ray diffraction (XRD), Thermogravimetric Analyses (TGA), and Scanning Electron Microscopy (SEM) to gain insights into CaCO 3 content. A baseline characterization of lab-grade CaCO 3 and MgCO 3 also revealed important considerations for CaCO 3 measurement using TGA alone. The experiments using synthetic lab-grade samples also revealed that the presence of MgCO 3 /MgO can accelerate the decomposition of CaCO 3 and thus can affect measurement parameters. Lab-grade CaCO 3 samples dosed into steel slag and mine tailing also showed significant deviation in their decomposition behavior. These insights are used to inform the development of a standardized protocol for the measurement and verification of carbonate-bearing products.

97 MATHEMATICS AND COMPUTING↗

The Uniform Methods Project: Smart Thermostat Evaluation Protocol

A smart thermostat is an internet-connected device that controls home heating, ventilation, and air-conditioning (HVAC) equipment and can automatically adjust temperature set points to optimize performance and achieve energy savings. Smart thermostat features often include two way communication, occupancy detection (such as geofencing and occupancy sensors), schedule learning, and seasonal optimization algorithms. Smart thermostats can control most conventional HVAC systems, including central air conditioners, heat pumps, and forced air furnaces. Several types of residential utility programs offer smart thermostats as replacements measures. Working with smart thermostat vendors, utilities can offer separate optimization programs to produce energy savings beyond those achieved by installing a smart thermostat. From an evaluation perspective, smart thermostat programs have several noteworthy features. First, the energy savings from a smart thermostat may change over the life of the device. As a smart thermostat is connected to the internet, original equipment manufacturers can update the thermostat software to improve the thermostat's energy efficiency. Likewise, users can adjust the thermostat settings and schedules over time in response to changes in weather, thermal comfort, energy prices, or preferences for energy efficiency. Additionally, many thermostat manufacturers offer seasonal optimization programs that recommend changes or make minor, automated adjustments to the thermostat settings to improve energy efficiency. These opt-in programs are now standard offerings for many smart thermostat manufacturers and provided at no additional cost to users. The potential for software updates and continuous optimization and the evolving nature of user interactions mean future energy savings may differ from first-year savings and the energy savings of smart thermostats may need to be evaluated more than once. Second, smart thermostats often have small unit energy savings relative to a home's total energy consumption, especially in comparison to whole- home retrofit programs. This can make it difficult to detect the smart thermostat savings in billing or advanced metering infrastructure (AMI) meter consumption data. For example, as cooling loads in many regions average about 20% of annual electricity consumption, smart thermostat savings of 10% of cooling energy use would equate to a 2% reduction in home electricity consumption. Evaluators should use regression analysis of whole-home billing consumption or advanced metering infrastructure (AMI) meter consumption data to evaluate smart thermostat savings because, as explained at greater length below , these data are usually available to evaluators and regression can control for the impacts of weather and other potentially confounding factors on a home's energy consumption. Finally, as with other energy efficiency programs, participation in smart thermostat programs is self-selective. As discussed at greater length below , smart thermostat participants tend to be, among other things, younger, higher-income, and more likely to adopt electric vehicles (EVs) and internet connected devices than nonparticipants. These differences are often unobservable to the evaluator and correlated with a home's energy consumption, creating the potential for bias in estimating savings. Due to the small unit savings of thermostats, errors and biases from self-selection that may not be very consequential when evaluating a whole- home retrofits (e.g., ±2% of home electricity consumption) can have a major impact when evaluating the savings and cost-effectiveness of smart thermostat programs. A percentage point change in the estimated savings could affect the cost-effectiveness of a program. This means it is important for evaluators to assess and to minimize the potential for error from selection bias in estimating smart thermostat program savings. The Uniform Methods Project provides model protocols for determining energy savings and demand reductions that result from specific energy efficiency measures implemented through state and utility programs. In most cases, the measure protocols are based on a particular option identified by the International Performance Verification and Measurement Protocol ; however, this work provides a more detailed approach to implementing that option. Each chapter is written by technical experts in collaboration with their peers, reviewed by industry experts, and subject to public review and comment. The UMP protocols can be used by utilities, program administrators, public utility commissions, evaluators, and other stakeholders for both program planning and evaluation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantitative Measures for Software Independent Verification and Validation

As software is maintained or reused, it undergoes an evolution which tends to increase the overall complexity of the code. To understand the effects of this, we brought in statistics experts and leading researchers in software complexity, reliability, and their interrelationships. These experts' project has resulted in our ability to statistically correlate specific code complexity attributes, in orthogonal domains, to errors found over time in the HAL/S flight software which flies in the Space Shuttle. Although only a prototype-tools experiment, the result of this research appears to be extendable to all other NASA software, given appropriate data similar to that logged for the Shuttle onboard software. Our research has demonstrated that a more complete domain coverage can be mathematically demonstrated with the approach we have applied, thereby ensuring full insight into the cause-and-effects relationship between the complexity of a software system and the fault density of that system. By applying the operational profile we can characterize the dynamic effects of software path complexity under this same approach We now have the ability to measure specific attributes which have been statistically demonstrated to correlate to increased error probability, and to know which actions to take, for each complexity domain. Shuttle software verifiers can now monitor the changes in the software complexity, assess the added or decreased risk of software faults in modified code, and determine necessary corrections. The reports, tool documentation, user's guides, and new approach that have resulted from this research effort represent advances in the state of the art of software quality and reliability assurance. Details describing how to apply this technique to other NASA code are contained in this document.

Lee, Alice↗

Model verification studies using accurate measurements of spin up

The reliability and accuracy of the numerical code for spin up flows in a cylinder by comparing the numerical results against high resolution laser Doppler velocimeter (LDV) measurements of the azimuthal flows were checked. A computer code to generate numerical solution for axisymmetric rotating fluid in a cylinder was obtained and amended for routine use at MSFC. The numerical simulations used the Navier-Stokes equations in axisymmetric form and employed finite difference techniques on both constant and variable grids. The numerical solutions are analyzed to gain further insight into the fundamental questions analyzed in rotating fluid dynamics.

Hyun, J. M.↗

Spatio-temporal impacts of a utility’s efficiency portfolio on the distribution grid

Energy Efficiency has historically focused on delivering savings to offset growth in energy supply. Today’s growing emphasis on decarbonization of the energy supply is driving renewables adoption and increased interest in electrification. As a result, energy efficiency is being assessed not just in its ability to offset load growth, but also for its ability to alleviate location-specific constraints on transmission and distribution infrastructure. This work demonstrates that advanced measurement and verification modeling techniques can be used to estimate the spatio-temporal grid impact of a portfolio of energy efficiency programs. It extends measurement-based methods to an entire Demand Side Management portfolio and uses a single model to predict annual as well as seasonal building energy use with near-zero bias. In addition, new metrics are introduced to assess grid level impacts of energy efficiency. The results show that the efficiency program portfolio delivers savings of over 12% at the territory-wide proxy level, with substation and feeder level savings ranging from 0.4% to 26%, and ~5%-42% respectively. Overall, these savings impacted 1.0%–1.4% of the energy used at these locations in the grid. This work provides a methodology with potential to connect efficiency with distribution planning, carrying implications for non-wires alternatives and targeted delivery of efficiency programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy and power quality measurement for electrical distribution in AC and DC microgrid buildings

Today's selection of DC microgrid buildings features a diverse set of electrical topologies and turnkey solutions, each with specific design trade-offs and optimizations. Designers desperately need standardized metrics and procedures for measurement and verification (M&V) to analyze and compare the advantages of each DC solution to traditional AC building networks. This work develops M&V procedures for quantifying and comparing the energy efficiency and power quality in buildings. To calculate full-building efficiency, this work introduces the measurement-informed modeling method, a procedure that develops and refines a building's energy model with metered data. To quantify power quality, this work defines a new voltage quality index that applies to both AC and DC buildings. This article describes the equipment, instrumentation, and operation necessary to calculate the efficiency and power quality. It then demonstrates these methods with a set of field tests. We report these M&V procedures can ultimately be used to compare and improve the efficiency and power quality of various DC topologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 17: Residential Behavior Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures, September 2011 - August 2020

This document has been updated in August 2020. This document was developed for the U.S. Department of Energy Uniform Methods Project (UMP). The UMP provides model protocols for determining energy and demand savings that result from specific energy-efficiency measures implemented through state and utility programs. In most cases, the measure protocols are based on a particular option identified by the International Performance Verification and Measurement Protocol; however, this work provides a more detailed approach to implementing that option. Each chapter is written by technical experts in collaboration with their peers, reviewed by industry experts, and subject to public review and comment. The protocols are updated on an as-needed basis. The UMP protocols can be used by utilities, program administrators, public utility commissions,evaluators, and other stakeholders for both program planning and evaluation. To learn more about the UMP, visit the website, https://energy.gov/eere/about-us/ump-home, or download the UMP introduction document at http://www.nrel.gov/docs/fy17osti/68557.pdf.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantifying the Value of Grid-Interactive Efficient Buildings through Field Study: Preprint

Quantifying the annual energy impacts of efficient technologies in commercial buildings has been well established by the building science field. As we move toward enabling grid-interactive efficient buildings (GEB) targeting flexible building operation and carbon reduction, quantification methods to evaluate time-sensitive peak load and emissions impact are much less defined. A number of national laboratories are working to field validate four different GEB software solutions that provide the capability to control multiple building end-use systems in multiple load flexibility modes (i.e., energy efficiency, load shed, load shift, and possible load modulation at the second to sub-second level). To guide the laboratory leads in effective measurement and verification (M&V) practices, two of the laboratories collaborated to define metrics to quantify the impacts of flexible load control on building demand, utility costs, carbon emissions, facility management, and occupant comfort. This paper summarizes the proposed metrics to quantify peak load and emission impacts in the field, decision parameters, approaches to accurately conduct M&V, lessons learned, and outstanding needs and next steps.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Model Validation of Phase-Induced Amplitude Apodization Complex Mask Coronagraph for LUVOIR-A in Vacuum

The Phase-Induced Amplitude Apodization Complex Mask Coronagraph (PIAACMC) is a coronagraph architecture for the next generation of large space telescopes optimized for habitable exoplanet imaging that can achieve attractive theoretical performance with high throughput at small inner working angles (IWA). PIAACMC designs are compatible with large, on-axis, segmented apertures such as the Large UV / Optical/ Infrared A (LUVOIR-A) concept currently being considered by the decadal survey review which would greatly enhance the possibility to achieve statistically significant scientific yields and signal quality for direct imaging exoplanet surveys. PIAACMC has been recently implemented for LUVOIR-A and is currently being tested in vacuum at JPL’s High-Contrast Imaging Testbed (HCIT). In this work, we review the theoretical performance of the PIAACMC instrument designed to meet a 1e-9 raw contrast goal in 10% broadband light in a region from 2-8 L/D both before and after the wavefront control loop. We use empirical measurements from the vacuum testbed to verify the instrument model and its performance including line-of-sight errors, instrument alignment, and fabricated components. In particular, the model verification includes measured sags of the manufactured PIAA mirrors by NuTek. The CMC mask was manufactured at JPL’s Microdevices Laboratory and we include surface profile characterization measurement. We assess the impact on performance of the different manufacturing and alignment errors.

High-Contrast Imaging↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Best Practices for Smart Grid-Interactive Efficient Building Ready Performance Contracts

Grid-interactive efficient building (GEB) measures reduce costs and optimize energy use for additional grid services by coordinating building energy loads and providing continuous demand management. Incorporating GEB energy conservation measures (ECMs) in performance contracts is reliant upon multiple factors. These factors include site selection with utility tariffs and incentives favorable to GEB, the identification of GEB as a priority in the initial stages of the contracting process, integration of GEB within comprehensive performance contracts with multiple other ECMs, and careful consideration of GEB measurement and verification (M&V) for energy savings performance contracts (ESPCs) and performance assurance for utility energy service contracts (UESCs).

building energy loads↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Cyberattack Detection and Mitigation on Central Volt‐VAr Using Circuit Law and Machine Learning

ABSTRACT In a distribution grid, voltage is maintained within a nominal range through a Volt‐VAr function that controls capacitor banks, reactive power of distributed energy resources (DER), and on‐load tap changers (OLTC). Availability of communications helps with the implementation of central Volt‐VAr control; however, it also opens the system to cyberattacks, causing voltage disturbances. Previous work has shown the adverse impacts of false data injection (FDI) on the central Volt‐VAr control; however, very few works have studied methods to detect and mitigate FDI on Volt‐VAr control. This paper addresses gaps in the detection and mitigation of FDI on the measurement packets of a central Volt‐VAr control. This work uses a two‐stage algorithm for cyberattack detection since the accuracy of a single‐stage machine learning (ML)–based detection method decreases while dealing with unseen data. The first stage is based on the verification of measurements against circuit laws, and the second stage utilizes a tree search algorithm and an ML method to detect the falsified data. This paper compares long short‐term memory (LSTM) and bidirectional LSTM (BiLSTM) as the employed ML algorithms. Finally, the mitigation algorithm replaces the falsified data with the estimated output of the ML algorithm. The effectiveness of the proposed method is tested for several cases using the IEEE 13‐bus test system in PSCAD software.

Beikbabaei, Milad [Bradley Department of Electrica↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Verification of three-dimensional laser Doppler velocimeter measurements

An experimental comparison method is proposed for the verification of mean flow and turbulence measurements obtained with a three-dimensional laser Doppler velocimeter system. Such measurements can include large errors caused by problems unique to three-dimensional systems. Direct comparisons of laser and hot cross-wire measurements obtained in two-dimensional flows, as is the common practice, will not bear out all the errors associated with three-dimensional laser systems. It is proposed here that the errors may be adequately quantified by making the direct comparisons in a weakly three-dimensional turbulent shear flow. The weak three-dimensional flow ensures high accuracy of the cross-wire data while still generating sufficiently strong secondary mean flow and Reynolds shear stress so that all the laser measurements may be fully verified. This type of shear flow is easily generated by introducing a weak streamwise vortex into a nominally two-dimensional turbulent shear layer.

Mehta, R. D.↗

FINAL TECHINICAL REPORT THUNDERING BUFFALO HEALTH AND WELLNESS CENTER

This U.S. Department of Energy, Office of Indian Energy supported project consists of energy conservation measures (ECMs) and a solar photovoltaic (PV) system to reduce cost of utility bills in a newly constructed Fort Peck Wellness Center, for use by tribal members in improving their physical and mental wellness. Construction of the building was outside the scope of the DOE supported project. A new 2-story wellness center was designed and constructed in Poplar, Montana. The wellness center is comprised of fitness areas, gymnasium, pool and spa, offices, and BOH support areas. The building was completed and has been operational for more than a year. A final measurement and verification of energy savings was completed after one year of operation and the results are presented herein, showing an energy savings 20% higher than the originally models indicated.

14 SOLAR ENERGY↗