Engineering PapersSearch

SEARCH · Engineering Papers

Results for “log file analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

57 records · Page 4

SE-FIT

The mathematical theory of capillary surfaces has developed steadily over the centuries, but it was not until the last few decades that new technologies have put a more urgent demand on a substantially more qualitative and quantitative understanding of phenomena relating to capillarity in general. So far, the new theory development successfully predicts the behavior of capillary surfaces for special cases. However, an efficient quantitative mathematical prediction of capillary phenomena related to the shape and stability of geometrically complex equilibrium capillary surfaces remains a significant challenge. As one of many numerical tools, the open-source Surface Evolver (SE) algorithm has played an important role over the last two decades. The current effort was undertaken to provide a front-end to enhance the accessibility of SE for the purposes of design and analysis. Like SE, the new code is open-source and will remain under development for the foreseeable future. The ultimate goal of the current Surface Evolver Fluid Interface Tool (SEFIT) development is to build a fully integrated front-end with a set of graphical user interface (GUI) elements. Such a front-end enables the access to functionalities that are developed along with the GUIs to deal with pre-processing, convergence computation operation, and post-processing. In other words, SE-FIT is not just a GUI front-end, but an integrated environment that can perform sophisticated computational tasks, e.g. importing industry standard file formats and employing parameter sweep functions, which are both lacking in SE, and require minimal interaction by the user. These functions are created using a mixture of Visual Basic and the SE script language. These form the foundation for a high-performance front-end that substantially simplifies use without sacrificing the proven capabilities of SE. The real power of SE-FIT lies in its automated pre-processing, pre-defined geometries, convergence computation operation, computational diagnostic tools, and crash-handling capabilities to sustain extensive computations. SE-FIT performance is enabled by its so-called file-layer mechanism. During the early stages of SE-FIT development, it became necessary to modify the original SE code to enable capabilities required for an enhanced and synchronized communication. To this end, a file-layer was created that serves as a command buffer to ensure a continuous and sequential execution of commands sent from the front-end to SE. It also establishes a proper means for handling crashes. The file layer logs input commands and SE output; it also supports user interruption requests, back and forward operation (i.e. undo and redo), and others. It especially enables the batch mode computation of a series of equilibrium surfaces and the searching of critical parameter values in studying the stability of capillary surfaces. In this way, the modified SE significantly extends the capabilities of the original SE.

Chen, Yongkang

Architectural Analysis of Complex Evolving Systems of Systems

The goal of this collaborative project between FC-MD, APL, and GSFC and supported by NASA IV&V Software Assurance Research Program (SARP), was to develop a tool, Dynamic SAVE, or Dyn-SAVE for short, for analyzing architectures of systems of systems. The project team was comprised of the principal investigator (PI) from FC-MD and four other FC-MD scientists (part time) and several FC-MD students (full time), as well as, two APL software architects (part time), and one NASA POC (part time). The PI and FC-MD scientists together with APL architects were responsible for requirements analysis, and for applying and evaluating the Dyn-SAVE tool and method. The PI and a group of FC-MD scientists were responsible for improving the method and conducting outreach activities, while another group of FC-MD scientists were responsible for development and improvement of the tool. Oversight and reporting was conducted by the PI and NASA POC. The project team produced many results including several prototypes of the Dyn-SAVE tool and method, several case studies documenting how the tool and method was applied to APL s software systems, and several published papers in highly respected conferences and journals. Dyn-SAVE as developed and enhanced throughout this research period, is a software tool intended for software developers and architects, software integration testers, and persons who need to analyze software systems from the point of view of how it communicates with other systems. Using the tool, the user specifies the planned communication behavior of the system modeled as a sequence diagram. The user then captures and imports the actual communication behavior of the system, which is then converted and visualized as a sequence diagram by Dyn-SAVE. After mapping the planned to the actual and specifying parameter and timing constraints, Dyn-SAVE detects and highlights deviations between the planned and the actual behavior. Requirements based on the need to analyze two inter-system communication protocols that are representative of protocols used in the Aerospace industry have been specified. The protocols are related: APL s Common Ground System (CGS) as used in the MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) and the Radiation Belt Space Probes (RBSP) missions. The analyzed communications were implementations of the Telemetry protocol and the CCSDS File Delivery Protocol (CFDP) protocol. Based on these requirements, three prototypes of Dyn-SAVE were developed and applied to these protocols. The application of Dyn-SAVE to these protocols resulted in the detection of several issues. Dyn-SAVE was also applied to several Testbeds that have previously been used for experimentation earlier on this project, as well as, to other protocols and logs for testing its broader applicability. For example, Dyn-SAVE was used to analyze 1) the communication pattern between a web browser and a web server, 2) the system log of a computer in order to detect offnominal computer shut-down behavior, and 3) the actual test cases of NASA Goddard s Core Flight System (CFS) and automatically generated test cases in order to determine the overlap between the two sets of test cases. In all cases, Dyn-SAVE assisted in providing insightful conclusions about each of the cases identified above.

Lindvall, Mikael

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley