Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Impact of lunar and planetary missions on the space station: Preliminary STS logistics report

Space station requirements for lunar and planetary missions are discussed. Specific reference is made to projected Ceres and Kopff missions; Titan probes; Saturn and Mercury orbiters; and a Mars sample return mission. Such requirements as base design; station function; program definition; mission scenarios; uncertainties impact; launch manifest and mission schedule; and shuttle loads are considered. It is concluded that: (1) the impact of the planetary missions on the space station is not large when compared to the lunar base; (2) a quarantine module may be desirable for sample returns; (3) the Ceres and Kopff missions require the ability to stack and checkout two-stage OTVs; and (4) two to seven manweeks of on-orbit work are required of the station crew to launch a mission and, with the exception of the quarantine module, dedicated crew will not be required.

Source record↗

Intelligent Resource Management for Local Area Networks: Approach and Evolution

The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.

Meike, Roger↗

A CLIPS prototype for autonomous power system control

The model of the system assumes a constant power source and loads (experiments) whose power demands exceed the supply. Experiments are described by their name, power consumption, time for a complete run, present status and the state of the load. The power consumption of each load is set at a constant level but can be dynamically modified by the operator. The status specifies if the experiment is running, paused, completed or failed. The state compensates for the lack of actual feedback sensor data, by signifying the stability of the load. Experiments are scheduled to keep as many running as possible with the current system limitations. A graphics oriented user interface is embedded into the rule-based system to enable an operator to easily experiment with the system.

Vezina, James M.↗

Nonlinear dynamic simulation of single- and multi-spool core engines

In this paper a new computational method for accurate simulation of the nonlinear dynamic behavior of single- and multi-spool core engines, turbofan engines, and power generation gas turbine engines is presented. In order to perform the simulation, a modularly structured computer code has been developed which includes individual mathematical modules representing various engine components. The generic structure of the code enables the dynamic simulation of arbitrary engine configurations ranging from single-spool thrust generation to multi-spool thrust/power generation engines under adverse dynamic operating conditions. For precise simulation of turbine and compressor components, row-by-row calculation procedures were implemented that account for the specific turbine and compressor cascade and blade geometry and characteristics. The dynamic behavior of the subject engine is calculated by solving a number of systems of partial differential equations, which describe the unsteady behavior of the individual components. In order to ensure the capability, accuracy, robustness, and reliability of the code, comprehensive critical performance assessment and validation tests were performed. As representatives, three different transient cases with single- and multi-spool thrust and power generation engines were simulated. The transient cases range from operating with a prescribed fuel schedule, to extreme load changes, to generator and turbine shut down.

Schobeiri, T.↗

Use of Acoustic Emission to Monitor Progressive Damage Accumulation in Kevlar (R) 49 Composites

Acoustic emission (AE) data acquired during intermittent load hold tensile testing of epoxy impregnated Kevlar(Registeres TradeMark) 49 (K/Ep) composite strands were analyzed to monitor progressive damage during the approach to tensile failure. Insight into the progressive damage of K/Ep strands was gained by monitoring AE event rate and energy. Source location based on energy attenuation and arrival time data was used to discern between significant AE attributable to microstructural damage and spurious AE attributable to noise. One of the significant findings was the observation of increasing violation of the Kaiser effect (Felicity ratio < 1.0) with damage accumulation. The efficacy of three different intermittent load hold stress schedules that allowed the Felicity ratio to be determined analytically is discussed.

Waller, Jess M.↗

Rising Above the Cloud - Toward High-Rate Delay-Tolerant Networking in Low-Earth Orbit

The High Data Rate Architecture (HiDRA) project is implementing a High-rate Delay Tolerant Networking (HDTN) capability that can support Low Earth Orbit (LEO) applications and environments. The present state of the effort, future work, and other elements of the work to date are described in this paper. This implementation is intended to support applications that run at 1+ Gbps, per the requirements of modern optical and high-frequency RF links. Uniquely, this implementation is also tuned to support relay and data trunking applications, which might require support for large numbers of small bundles per second. The design for this platform is based entirely on commercial-off-the-shelf (COTS) components, and possesses buffering capabilities in the 5 TB range. This document takes results from previous individual tests and integrates them to demonstrate results in the presence of a coherent use-case: consider a network aboard the ISS which intends to utilize an upcoming optical communications capability. For this use-case, orbital analysis software is used to analyze orbital dynamics, from which a list of access times are generated that might take in to account weather, schedule competition, etc. A variant of Contact Graph Routing (CGR) is applied to these windows to determine an optimal schedule. This schedule is then loaded into the HDTN prototype and, in conjunction with various measurement tools, a complete end-to-end analysis of HDTN's performance is conducted. Various bottlenecks (including storage) are identified: these bottlenecks are expected to help us focus our future work on the elements of the system that are most likely to present issues moving forward. Finally, we discuss possible paths for evolution beyond the present rates supported by the system, including (but not limited to) hardware acceleration.

Hylton, Alan↗

Flying Schedule-Matching Descents to Explore Flight Crews' Perceptions of Their Load and Task Feasibility

Multiple studies have investigated the development and use of ground-based (controller) tools to manage and schedule traffic in future terminal airspace. No studies have investigated the impacts that such tools (and concepts) could have on the flight-deck. To begin to redress the balance, an exploratory study investigated the procedures and actions of ten Boeing-747-400 crews as they flew eight continuous descent approaches in the Los Angeles terminal airspace, with the descents being controlled using speed alone. Although the study was exploratory in nature, four variables were manipulated: speed changes, route constraints, clearance phraseology, and winds. Despite flying the same scenarios with the same events and timing, there was at least a 50 second difference in the time it took crews to fly the approaches. This variation is the product of a number of factors but highlights potential difficulties for scheduling tools that would have to accommodate this amount of natural variation in descent times. The primary focus of this paper is the potential impact of ground scheduling tools on the flight crews performance and procedures. Crews reported "moderate to low" workload, on average; however, short periods of intense and high workload were observed. The non-flying pilot often reported a higher level of workload than the flying-pilot, which may be due to their increased interaction with the Flight Management Computer, when using the aircraft automation to assist with managing the descent clearances. It is concluded that ground-side tools and automation may have a larger impact on the current-day flight-deck than was assumed and that studies investigating this impact should continue in parallel with controller support tool development.

Martin, Lynne Hazel↗

Tool for Merging Proposals Into DSN Schedules

A Practical Extraction and Reporting Language (Perl) script called merge7da has been developed to facilitate determination, by a project scheduler in NASA's Deep Space Network, of whether a proposal for use of the DSN could create a conflict with the current DSN schedule. Prior to the development of merge7da, there was no way to quickly identify potential schedule conflicts: it was necessary to submit a proposal and wait a day or two for a response from a DSN scheduling facility. By using merge7da to detect and eliminate potential schedule conflicts before submitting a proposal, a project scheduler saves time and gains assurance that the proposal will probably be accepted. merge7da accepts two input files, one of which contains the current DSN schedule and is in a DSN-standard format called '7da'. The other input file contains the proposal and is in another DSN-standard format called 'C1/C2'. merge7da processes the two input files to produce a merged 7da-format output file that represents the DSN schedule as it would be if the proposal were to be adopted. This 7da output file can be loaded into various DSN scheduling software tools now in use.

Khanampornpan, Teerapat↗

TTEthernet for Integrated Spacecraft Networks

Aerospace projects have traditionally employed federated avionics architectures, in which each computer system is designed to perform one specific function (e.g. navigation). There are obvious downsides to this approach, including excessive weight (from so much computing hardware), and inefficient processor utilization (since modern processors are capable of performing multiple tasks). There has therefore been a push for integrated modular avionics (IMA), in which common computing platforms can be leveraged for different purposes. This consolidation of multiple vehicle functions to shared computing platforms can significantly reduce spacecraft cost, weight, and design complexity. However, the application of IMA principles introduces significant challenges, as the data network must accommodate traffic of mixed criticality and performance levels - potentially all related to the same shared computer hardware. Because individual network technologies are rarely so competent, the development of truly integrated network architectures often proves unreasonable. Several different types of networks are utilized - each suited to support a specific vehicle function. Critical functions are typically driven by precise timing loops, requiring networks with strict guarantees regarding message latency (i.e. determinism) and fault-tolerance. Alternatively, non-critical systems generally employ data networks prioritizing flexibility and high performance over reliable operation. Switched Ethernet has seen widespread success filling this role in terrestrial applications. Its high speed, flexibility, and the availability of inexpensive commercial off-the-shelf (COTS) components make it desirable for inclusion in spacecraft platforms. Basic Ethernet configurations have been incorporated into several preexisting aerospace projects, including both the Space Shuttle and International Space Station (ISS). However, classical switched Ethernet cannot provide the high level of network determinism required by real-time spacecraft applications. Even with modern advancements, the uncoordinated (i.e. event-driven) nature of Ethernet communication unavoidably leads to message contention within network switches. The arbitration process used to resolve such conflicts introduces variation in the time it takes for messages to be forwarded. TTEthernet1 introduces decentralized clock synchronization to switched Ethernet, enabling message transmission according to a time-triggered (TT) paradigm. A network planning tool is used to allocate each device a finite amount of time in which it may transmit a frame. Each time slot is repeated sequentially to form a periodic communication schedule that is then loaded onto each TTEthernet device (e.g. switches and end systems). Each network participant references the synchronized time in order to dispatch messages at predetermined instances. This schedule guarantees that no contention exists between time-triggered Ethernet frames in the network switches, therefore eliminating the need for arbitration (and the timing variation it causes). Besides time-triggered messaging, TTEthernet networks may provide two additional traffic classes to support communication of different criticality levels. In the rate-constrained (RC) traffic class, the frame payload size and rate of transmission along each communication channel are limited to predetermined maximums. The network switches can therefore be configured to accommodate the known worst-case traffic pattern, and buffer overflows can be eliminated. The best-effort (BE) traffic class behaves akin to classical Ethernet. No guarantees are provided regarding transmission latency or successful message delivery. TTEthernet coordinates transmission of all three traffic classes over the same physical connections, therefore accommodating the full spectrum of traffic criticality levels required in IMA architectures. Common computing platforms (e.g. LRUs) can share networking resources in such a way that failures in non-critical systems (using BE or RC communication modes) cannot impact flight-critical functions (using TT communication). Furthermore, TTEthernet hardware (e.g. switches, cabling) can be shared by both TTEthernet and classical Ethernet traffic.

Loveless, Andrew↗

Autonomous Spacecraft Communication Interface for Load Planning

Ground-based controllers can remain in continuous communication with spacecraft in low Earth orbit (LEO) with near-instantaneous communication speeds. This permits near real-time control of all of the core spacecraft systems by ground personnel. However, as NASA missions move beyond LEO, light-time communication delay issues, such as time lag and low bandwidth, will prohibit this type of operation. As missions become more distant, autonomous control of manned spacecraft will be required. The focus of this paper is the power subsystem. For present missions, controllers on the ground develop a complete schedule of power usage for all spacecraft components. This paper presents work currently underway at NASA to develop an architecture for an autonomous spacecraft, and focuses on the development of communication between the Mission Manager and the Autonomous Power Controller. These two systems must work together in order to plan future load use and respond to unanticipated plan deviations. Using a nominal spacecraft architecture and prototype versions of these two key components, a number of simulations are run under a variety of operational conditions, enabling development of content and format of the messages necessary to achieve the desired goals. The goals include negotiation of a load schedule that meets the global requirements (contained in the Mission Manager) and local power system requirements (contained in the Autonomous Power Controller), and communication of off-plan disturbances that arise while executing a negotiated plan. The message content is developed in two steps: first, a set of rapid-prototyping "paper" simulations are preformed; then the resultant optimized messages are codified for computer communication for use in automated testing.

Controls↗

DTS: Building custom, intelligent schedulers

DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

Hansson, Othar↗

Advanced timeline systems

The Mission Planning Division of the Mission Operations Laboratory at NASA's Marshall Space Flight Center is responsible for scheduling experiment activities for space missions controlled at MSFC. In order to draw statistically relevant conclusions, all experiments must be scheduled at least once and may have repeated performances during the mission. An experiment consists of a series of steps which, when performed, provide results pertinent to the experiment's functional objective. Since these experiments require a set of resources such as crew and power, the task of creating a timeline of experiment activities for the mission is one of resource constrained scheduling. For each experiment, a computer model with detailed information of the steps involved in running the experiment, including crew requirements, processing times, and resource requirements is created. These models are then loaded into the Experiment Scheduling Program (ESP) which attempts to create a schedule which satisfies all resource constraints. ESP uses a depth-first search technique to place each experiment into a time interval, and a scoring function to evaluate the schedule. The mission planners generate several schedules and choose one with a high value of the scoring function to send through the approval process. The process of approving a mission timeline can take several months. Each timeline must meet the requirements of the scientists, the crew, and various engineering departments as well as enforce all resource restrictions. No single objective is considered in creating a timeline. The experiment scheduling problem is: given a set of experiments, place each experiment along the mission timeline so that all resource requirements and temporal constraints are met and the timeline is acceptable to all who must approve it. Much work has been done on multicriteria decision making (MCDM). When there are two criteria, schedules which perform well with respect to one criterion will often perform poorly with respect to the other. One schedule dominates another if it performs strictly better on one criterion, and no worse on the other. Clearly, dominated schedules are undesireable. A nondominated schedule can be generated by some sort of optimization problem. Generally there are two approaches: the first is a hierarchical approach while the second requires optimizing a weighting or scoring function.

Bulfin, R. L.↗

Upper Atmospheric Monitoring for Ares I-X Ascent Loads and Trajectory Evaluation on the Day-of-Launch

During the launch countdown of the Ares I-X test vehicle, engineers from Langley Research Center will use profiles of atmospheric density and winds in evaluating vehicle ascent loads and controllability. A schedule for the release of balloons to measure atmospheric density and winds has been developed by the Natural Environments Branch at Marshall Space Flight Center to help ensure timely evaluation of the vehicle ascent loads and controllability parameters and support a successful launch of the Ares I-X vehicle.

Roberts, Barry C.↗

Autonomous power system: Integrated scheduling

The Autonomous Power System (APS) project at NASA Lewis Research Center is designed to demonstrate the abilities of integrated intelligent diagnosis, control and scheduling techniques to space power distribution hardware. The project consists of three elements: the Autonomous Power Expert System (APEX) for fault diagnosis, isolation, and recovery (FDIR), the Autonomous Intelligent Power Scheduler (AIPS) to determine system configuration, and power hardware (Brassboard) to simulate a space-based power system. Faults can be introduced into the Brassboard and in turn, be diagnosed and corrected by APEX and AIPS. The Autonomous Intelligent Power Scheduler controls the execution of loads attached to the Brassboard. Each load must be executed in a manner that efficiently utilizes available power and satisfies all load, resource, and temporal constraints. In the case of a fault situation on the Brassboard, AIPS dynamically modifies the existing schedule in order to resume efficient operation conditions. A database is kept of the power demand, temporal modifiers, priority of each load, and the power level of each source. AIPS uses a set of heuristic rules to assign start times and resources to each load based on load and resource constraints. A simple improvement engine based upon these heuristics is also available to improve the schedule efficiency. This paper describes the operation of the Autonomous Intelligent Power Scheduler as a single entity, as well as its integration with APEX and the Brassboard. Future plans are discussed for the growth of the Autonomous Intelligent Power Scheduler.

Ringer, Mark J.↗

A survey of load methodologies for shuttle orbiter payloads

Loads methods currently being used to design planetary spacecraft to be launched on the shuttle orbiter are summarized. Experiences gained from expendable launch vehicle payloads are used to develop methodologies for the space shuttle orbiter payloads. The objectives for the development of a new methodology for the shuttle payloads are to reduce the cost and schedule for the payload load analysis by decoupling the payload analysis from the launch vehicle to the maximum extent possible. Methods are described for payload member load estimation or obtaining upper bounds for dynamic loads, as well as load prediction or calculating actual transient member load time histories.

Chen, J. C.↗

A survey of load methodologies for shuttle orbiter payloads

Loads methods currently being used to design shuttle orbiter payloads are summarized. Methods used for the design of payloads launched by expendable launch vehicles are described in historical perspective. Experiences gained from expendable launch vehicle payloads are used to develop methodologies for the space shuttle orbiter payloads. The objectives for the development of a new methodology for the shuttle payloads are to reduce the cost and schedule for the payload load analysis by decoupling the payload analysis from the launch vehicle to the maximum extent possible. Methods are described for payload member load estimation or obtaining upper bounds for dynamic loads, as well as load prediction or calculating actual transient member load time histories.

Chen, J. C.↗

Space power system scheduling using an expert system

A most pressing problem in space exploration is timely spacecraft power system sequence generation, which requires the scheduling of a set of loads given a set of resource constraints. This is particularly important after an anomaly or failure. This paper discusses the power scheduling problem and how the software program, Plan-It, can be used as a consultant for scheduling power system activities. Modeling of power activities, human interface, and two of the many strategies used by Plan-It are discussed. Preliminary results showing the development of a conflict-free sequence from an initial sequence with conflicts is presented. It shows that a 4-day schedule can be generated in a matter of a few minutes, which provides sufficient time in many cases to aid the crew in the replanning of loads and generation use following a failure or anomaly.

Bahrami, K. A.↗