Engineering PapersSearch

SEARCH · Engineering Papers

Results for “linac”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Automated RF Phase Adjustment for Beam Stabilization in the Fermilab Linac

The Fermilab Linac experiences longitudinal beam phase drift, leading to increased particle loss, conventionally cor- rected through labor-intensive manual RF adjustments. This project explores machine learning-based automation for drift correction, employing a prototype-based classification approach. Our model utilizes a 34-dimensional feature set (RF settings and BPM readings) and leverages a 7x27 response matrix for system modeling. To overcome limited real-world data, we generate synthetic data, enhancing model training and generalizability. Custom loss functions, including a sur- rogate energy-consistent loss and a temporal smoothness constraint, ensure physically plausible drift predictions. The goal is a robust system for autonomous phase adjustments, ensuring stable beam acceleration and reduced manual intervention.

Chichili, R. R. [U. Illinois, Chicago]

PIP-II Linac Cryogenic Distribution System Design Challenges

The PIP-II linac Cryogenic Distribution System (CDS) is characterized by extremely small heat inflows and robust mechanical design. It consists of a Distribution Valve Box (DVB), Intermediate Transfer Line, Tunnel Transfer Line, comprising 25 Bayonet Cans, and ends with a Turnaround Can. Multiple helium streams, each characterized by distinct helium parameters, flow through each of these elements. The CDS geometry allows maintaining an acceptable pressure drop for each helium stream, considering the planned flows and helium parameters in different operation modes. This is particularly crucial for the return line of helium vapors, which return from cryomodules to the cold compressors and thus have very restrictive pressure drop requirements. On both sides of the DVB there are fixed supports for process pipes. One of the DVB design challenges was to route the process pipes in such a way that their shape provided sufficient compensation for thermal shrinkage. This ensures th at the forces resulting from thermal shrinkage acting on the cryogenic valves remain at a level acceptable to the manufacturer. The required thermal budget of the CDS was achieved by thermo-mechanical optimization of its components, like process pipes fixed supports in Bayonet Cans.

43 PARTICLE ACCELERATORS

Beam Dynamics simulations for ERDC project -- SRF linac for industrial use

Compact conductively cooled SRF industrial linacs can provide unique parameters of the electron beam for industrial applications. (up to 10MeV, 1MW). For ERDC project we designed normal conducting RF injector with thermal RF gridded gun integrated in first cell of multi-cell cavities. For design of the RF gun we used MICHELLE software to simulate and optimize parameters of the beam. Output file was converted to ASTRA format and most beam dynamic simulations in multi-cell normal conducting cavity and cryomodule were performed by using ASTRA software. For cross-checking we compare results of MICHELLE and AS-TRA in first few cells. At the end of injector beam reach ~250keV energy which allow to trap bunch in acceleration regime without losses in TESLA like 1.3 GHz cavity. Short solenoid at the end of injector allow to regulate transverse beam size in cryomodule to match beam to extraction system and also reduce charge losses in accelerator.

43 PARTICLE ACCELERATORS

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴× speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously—previously impossible with conventional tools—while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208

Master Oscillator and Phase Reference Line Design for the PIP-II Linac

The phase averaging reference line system provides the RF phase reference, LO and clock signals to the LLRF and other accelerator sub-systems. The PIP-II linac has RF systems at three frequencies - 162.5 MHz, 325 MHz and 650 MHz. A temperature-stabilized, low-phase-noise oscillator is used as the master oscillator. Phase reference signals at 162.5 MHz, 325 MHz, and 650 MHz, along with LO signals at 182.5 MHz, 345 MHz, 670 MHz and LLRF clocks at 1320 MHz and 1300 MHz, are generated in temperature-controlled RF modules at each frequency section. A phase reference from each module travels to the next section, where it is doubled to produce required frequencies. The reference also travels alongside the accelerating cavities in the tunnel, allowing cavity probe and reference cables to temperature track and reduce measurement errors from temperature changes or phase drift.

Syed, A. [Fermilab]

Development and Testing of a new Current-Regulated Arc Modulator for the LINAC

In this study, the performance of a current-regulated arc modulator was investigated with a focus on its role in initiating and sustaining plasma discharge within the Magnetron Body of the LINAC system. The analysis centered on how switching components, circuit topology, and feedback loop architecture influence critical factors such as energy efficiency, discharge stability, and long-term plasma containment. Particular attention was given to variations in pulse termination behavior, as observed through oscilloscope traces, which revealed inconsistencies affecting the duty factor and cathode temperature. These fluctuations have downstream effects on the cesium-coated cathode surface, thereby impacting H⁻ ion production and beam reliability. Simulation-based testing in LTspice was used to evaluate noise suppression techniques and arc current regulation schemes, revealing how optimized snubber networks, improved pulse shaping, and feedback stability can mitigate modulator-induced noise. The results identified hardware level parameters that significantly enhance discharge repeatability and improve overall plasma performance under operational conditions.

Campos, Nathan [Unlisted, US; Fermilab]

Demonstration of a diamond anvil cell platform at the Linac Coherent Light Source: Capabilities and Outlook

A novel x-ray free electron laser (XFEL) diffraction setup for use with diamond anvil cells (DACs) at the Linac Coherent Light Source (LCLS) is described. Using the new diamond window at the Matter at Extreme Conditions (MEC) instrument, it allows hard x-ray experiments on DACs to be performed in air. The platform is described along with alignment and calibration procedures and details of the x-ray beam and diagnostics. Example data are presented, including a reversible XFEL induced phase transition in CsPbI3. The DAC setup was commissioned at MEC, but is applicable to most LCLS instruments where the unique pulse structures available at LCLS offer access to new ultrafast experimental techniques at high pressure.

Diamond Anvil Cells, LCLS, XFEL, High-Pressure

The chemRIXS Instrument for Solution-Phase Resonant Inelastic X-ray Scattering at the Linac Coherent Light Source

The chemRIXS instrument at the Linac Coherent Light Source (LCLS) offers new opportunities for studying solution-phase systems with time-resolved soft X-ray spectroscopic methods such as resonant inelastic X-ray scattering (RIXS) using the recently commissioned high-repetition-rate LCLS-II X-ray free electron laser. The orders-of-magnitude X-ray flux improvement provided by the superconducting accelerator, combined with corresponding advances in the optical laser system and the liquid jet recirculation system, enables studies on dilute systems with high signal-to-noise compared to what was possible with the LCLS-I copper accelerator. These capabilities open up time-resolved X-ray absorption spectroscopy and RIXS to entirely new classes of samples, as well as enabling the development of new soft X-ray spectroscopic methods on liquid samples. An overview of the beamline components and the first LCLS-II commissioning results are presented.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Nb$^{3}$Sn Technology for Low-beta linacs

Nb3Sn is the most advanced potential successor for niobium in superconducting RF accelerator cavities. Nb3Sn has a significantly higher critical temperature (18.3 K) compared to that of niobium (9.2 K). This has a large effect on the BCS surface resistance, and therefore, on the dynamic RF losses at 4.5 K. The higher critical temperature allows two important changes for cavity and cryomodule design. First, the lower BCS losses allow the designer to use a higher frequency, translating to physically smaller cavities and cryomodules. Second, the low dynamic losses allow the use of stand-alone cryocoolers instead of complex helium refrigerators and distribution systems. Fabrication of a prototype 218 MHz cavity, test results, and continuing challenges are discussed.

43 PARTICLE ACCELERATORS

LLRF System Analysis for the Fermilab PIP-II LINAC

Developing long-lived quantum processing units (QPUs) capable of supporting high-fidelity quantum operations is a crucial challenge on the path toward fault-tolerant quantum computing. TESLA-shaped superconducting RF (SRF) cavities, known for photon relaxation times on the order of seconds, provide an excellent foundation for 3D QPUs and quantum memory. This talk presents a novel design that leverages TESLA cavity modes coupled to ancillary transmon qubits, optimized to preserve coherence and control. By carefully engineering the package geometry, optimizing Hamiltonian parameters, and minimizing lossy participation ratios, we achieve photon relaxation times of over 16 ms and 20 ms for the two cavity modes, representing a significant improvement over previous multimode quantum memories. Despite the reduced coupling between the qubit and cavity modes, which is necessary to preserve long lifetimes, the platform supports robust and universal control schemes that are not limited by low coupling strength. We will also discuss how this architecture can lead to scalable, modular quantum computing systems.

Varghese, P. [Fermilab]

Contextual modeling and Bayesian Optimization for Improved Injection at the Fermilab Booster

The Fermilab accelerator complex delivers high-intensity proton beams to serve the lab’s neutrino, muon, and fixed-target programs. A normal-conducting Linac accelerates H− beam to 400 MeV and injects into the Booster rapid cycling synchrotron via charge exchange, which accelerates protons to 8 GeV. Injection from the Linac into the Booster is a critical area for high-power performance of the Fermilab proton complex. The Booster is a high-intensity proton ring with extreme space-charge forces which necessitates precise control over the beam losses through the acceleration cycle. The main challenge for the reliability of Booster performance is compensating for drifting conditions in the beam from the Linac, which can drift daily in energy by up to O(1) MeV w.r.t. design. Drifts in Linac orbit and energy must be corrected to match the Booster, while simultaneously accommodating interdependent drifts in transverse and longitudinal beam quality. Operationally, compensation for these changes is addressed by manual tuning of the Linac output energy and/or Booster acceptance, which can be inefficient and time-consuming. This works describes contextual Bayesian Optimization for injection tuning that takes into account the state of Linac beam via information from instrumentation in the injection line (Beam position monitors (BPMs), beam loss monitors (BLMs), wire scanners for transverse profiles (WSs)), as well as RF cavity setting parameters from the Linac.

Sharankova, R. [Fermilab] (ORCID:000000027014593X)

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]

Transfer Line at Fermilab

Beam loss in high-intensity H- linacs, such as the PIP-II linac at Fermilab, is a critical challenge that requires comprehensive study and understanding to ensure efficient and safe operation. This study explores the various beam loss mechanisms encountered in the PIP-II linac and its beam transfer line, drawing parallels from other high-intensity H- linacs. Key loss mechanisms include residual gas stripping, where H- ions interact with residual gas molecules leading to electron detachment; field stripping, caused by the interaction of H- ions with magnetic fields; and intra-beam stripping, resulting from interactions within the beam itself. Beam halo formation, particularly due to Twiss function mismatch, is another significant source of beam loss, which can be exacerbated by Landau damping mechanisms. Adhering to the 1 W/m loss criterion is essential to maintain hands-on maintenance capability and ensure the longevity of the accelerator components. By understanding these mechanisms and implementing targeted mitigation strategies, the PIP-II linac can achieve its design goals while maintaining safe and efficient operations.

Pathak, Abhishek

LAMP Emittance Budget, Rev. 1

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). This brief report summarizes the emittance budget for the LANSCE Modernization Project (LAMP). While the project Key Performance Parameters (KPPs) specify threshold and objective requirements for charge delivered to each experimental area, no upper limits on beam emittances are specified. To maintain low losses in the high-energy section of the LANSCE linac and hands-on maintenance, some upper limits on beam emittance need to be specified for the new LAMP front-end performance. The scope of the LAMP project replaces the injector section and drift-tube linac (DTL) up to 100 MeV of the existing LANSCE linac. This new design replacement will be integrated with the remaining coupled cavity linac (CCL) which makes up most of the accelerator at LANSCE and accelerates the beam to a final energy of 800 MeV. The initial approach that has been used to define an emittance budget for the new LAMP front end is based on recent and historical measured beam emittances at 100 MeV for the three beam types accelerated at LANSCE: H+ (protons for isotope production), LBEG (H- beam for delivery to proton radiography and to the Lujan neutron spallation target, and MPEG (H- beam for delivery to the Weapons Neutron Research facility). The emittance budget (upper limit) for each beam type has been selected to maintain the losses in the CCL to a level approximately equivalent to those observed in present operations to first order. However, the goal of the LAMP project is to improve the quality of the beams injected into the CCL, if possible, thus allowing for higher average current operation while also lowering beam losses and activation at high beam energies. The table below summarizes the beam measurements evaluated and used to establish a conservative emittance budget for LAMP based on known historical beam losses and activation. However, based on estimates of the CCL admittance and the Isotope Production Facility (IPF) beamline acceptance, a more relaxed transverse emittance upper limit of 0.095 π-cm-mrad, rms, normalized may be acceptable at 100 MeV while still meeting the LAMP performance requirements for charge delivery to each LANSCE experimental area and maintaining hands-on maintenance. This upper limit is supported by a recent analysis of operational data. Additionally, the present conceptual LAMP front-end design meets this requirement.

43 PARTICLE ACCELERATORS

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]

Status of 22 GeV CEBAF Upgrade Using FFA Arcs

Jefferson Lab is exploring an upgrade to extend CEBAF’s energy to ~22 GeV within the existing tunnel by incorporating Fixed-Field Alternating-Gradient (FFA) arcs. In this scheme, the two lowest-energy electromagnetic arcs are removed, the remaining arcs are reassigned to lower energies, and a new pair of high-energy FFA arcs enables six additional recirculations using the existing SRF linacs. The non-scaling FFA lattice employs Halbach-derived permanent magnets with provisions for dipole, quadrupole, and higher-order components, offering large momentum acceptance and reduced operating cost. Implementing this concept requires updated linac optics, modifications to the remaining arcs, and a redesigned electromagnetic switchyard. Ongoing beam-dynamics studies address synchrotron-radiation–induced energy loss and emittance growth, along with strategies for their mitigation.

Ogur, S. [Thomas Jefferson National Accelerator Fa

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa