Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Recent Cycle Time Reduction at Langley Research Center

The NASA Langley Research Center (LaRC) has been engaged in an effort to reduce wind tunnel test cycle time in support of Agency goals and to satisfy the wind tunnel testing needs of the commercial and military aerospace communities. LaRC has established the Wind Tunnel Enterprise (WTE), with goals of reducing wind tunnel test cycle time by an order of magnitude by 2002, and by two orders of magnitude by 2010. The WTE also plans to meet customer expectations for schedule integrity, as well as data accuracy and quality assurance. The WTE has made progress towards these goals over the last year with a focused effort on technological developments balanced by attention to process improvements. This paper presents a summary of several of the WTE activities over the last year that are related to test cycle time reductions at the Center. Reducing wind tunnel test cycle time, defined here as the time between the freezing of loft lines and delivery of test data, requires that the relationship between high productivity and data quality assurance be considered. The efforts have focused on all of the drivers for test cycle time reduction, including process centered improvements, facility upgrades, technological improvements to enhance facility readiness and productivity, as well as advanced measurement techniques. The application of internet tools and computer modeling of facilities to allow a virtual presence of the customer team is also presented.

Kegelman, Jerome T.↗

Nuclear Cryogenic Propulsion Stage Affordable Development Strategy

The development of nuclear power for space use in nuclear thermal propulsion (NTP) systems will involve significant expenditures of funds and require major technology development efforts. The development effort must be economically viable yet sufficient to validate the systems designed. Efforts are underway within the National Aeronautics and Space Administration's (NASA) Nuclear Cryogenic Propulsion Stage Project (NCPS) to study what a viable program would entail. The study will produce an integrated schedule, cost estimate and technology development plan. This will include the evaluation of various options for test facilities, types of testing and use of the engine, components, and technology developed. A "Human Rating" approach will also be developed and factored into the schedule, budget and technology development approach.

Doughty, Glen E.↗

Planning and Resource Management in an Intelligent Automated Power Management System

Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

Morris, Robert A.↗

Multi-Objective Multi-User Scheduling for Space Science Missions

We have developed an architecture called MUSE (Multi-User Scheduling Environment) to enable the integration of multi-objective evolutionary algorithms with existing domain planning and scheduling tools. Our approach is intended to make it possible to re-use existing software, while obtaining the advantages of multi-objective optimization algorithms. This approach enables multiple participants to actively engage in the optimization process, each representing one or more objectives in the optimization problem. As initial applications, we apply our approach to scheduling the James Webb Space Telescope, where three objectives are modeled: minimizing wasted time, minimizing the number of observations that miss their last planning opportunity in a year, and minimizing the (vector) build up of angular momentum that would necessitate the use of mission critical propellant to dump the momentum. As a second application area, we model aspects of the Cassini science planning process, including the trade-off between collecting data (subject to onboard recorder capacity) and transmitting saved data to Earth. A third mission application is that of scheduling the Cluster 4-spacecraft constellation plasma experiment. In this paper we describe our overall architecture and our adaptations for these different application domains. We also describe our plans for applying this approach to other science mission planning and scheduling problems in the future.

science planning↗

NASA Platform for Autonomous Systems (NPAS)

NASA Platform for Autonomous Systems (NPAS) is a disruptive software platform and processes being developed by SSC Autonomous Systems Laboratory (ASL). Autonomous operations are critical for the success, safety and crew survival of NASA deep space missions beyond low Earth orbit, including Lunar Orbital Platform-Gateway, and for the future of cost-effective ground mission operations. NPAS represents the embodiment of an innovative implementation for "thinking" autonomy in contrast to brute-force autonomy. It also uniquely addresses the requirements and integrates five primary functionalities for autonomous operations including: (1) Integrated System Health Management (ISHM), (2) autonomy, guided by health and system concepts of operations; (3) knowledge models of applications; (4) infrastructure to create, schedule, and execute mission plans; and (5) infrastructure to integrate distributed autonomous applications across networks.

Figueroa, Fernando↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration

Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.

Merrill, R. Gabe↗

Integration of On-board EOS Schedule Revision with Space Communication Emulation System

The need for on-board decision-making for planning science observations on Earth Observing Satellites is based on the fact that the desirability of acquiring an image can change dynamically, because of changes in meteorological conditions (e.g. cloud cover), unforeseen events such as fires, floods, or volcanic eruptions, or unexpected changes in satellite or ground station capability. In such cases, satellite resources, such as power and SSR capacity can potentially be better utilized taking another image that is of higher quality. Currently, typical Earth observing satellites cannot communicate directly with each other, and can only communicate with ground stations about 5% to 10% of the time. Because of the limited communication windows, as well as the cost and effort that would need to be expended in revising a mission schedule, a ground-based scheduler would have little or no opportunity to revise the schedule in response to the contingencies that may arise. For this reason, a distributed science planning system combining a ground-based scheduler with on-board schedule revision capabilities is warranted. This paper will describe algorithms for on-board decision-making for science planning and their integration with the advanced satellite control and communications technology developed at the Space Communication Emulation Facility (SCEF) at NASA Glenn Research Center. Our objective of demonstrating how advanced communications and scheduling technology can be combined to improve the scientific utility of images acquired by Earth observing systems will be discussed via a description of a number of realistic flight scenarios.

Khatib, Lina↗

Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

Smith, Janice F.↗

Launch processing for Spacelab 1

The final integration of Spacelab payloads with the Shuttle is described. Attention is given to launch processing planning, schedules, quality control, and problem reports and configuration maintenance. Also covered are the integration and checkout of individual and combined experiments, mounting the end cones, attachment of the transfer tunnel, and inclusion of an extra experiments pallet. The entire Spacelab module was subjected to a full systems simulation before deliverance to the Orbiter bay. Modular parts that were transferred from building-to-building were placed in sealed containers filled with a purged atmosphere during transport.

Mcbrayer, R. O.↗

Space Station power system autonomy demonstration

The Systems Autonomy Demonstration Program (SADP) represents NASA's major effort to demonstrate, through a series of complex ground experiments, the application and benefits of applying advanced automation technologies to the Space Station project. Lewis Research Center (LeRC) and Marshall Space Flight Center (MSFC) will first jointly develop an autonomous power system using existing Space Station testbed facilities at each center. The subsequent 1990 power-thermal demonstration will then involve the cooperative operation of the LeRC/MSFC power system with the Johnson Space Center (JSC's) thermal control and DMS/OMS testbed facilities. The testbeds and expert systems at each of the NASA centers will be interconnected via communication links. The appropriate knowledge-based technology will be developed for each testbed and applied to problems requiring intersystem cooperation. Primary emphasis will be focused on failure detection and classification, system reconfiguration, planning and scheduling of electrical power resources, and integration of knowledge-based and conventional control system software into the design and operation of Space Station testbeds.

Kish, James A.↗

Integrating Space Communication Network Capabilities via Web Portal Technologies

We have developed a service portal prototype as part of an investigation into the feasibility of using Java portlet technology as a means of providing integrated access to NASA communications network services. Portal servers provide an attractive platform for this role due to the various built-in collaboration applications they can provide, combined with the possibility to develop custom inter-operating portlets to extent their functionality while preserving common presentation and behavior. This paper describes various options for integration of network services related to planning and scheduling, and results based on use of a popular open-source portal framework. Plans are underway to develop an operational SCaN Service Portal, building on the experiences reported here.

web services↗

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler↗

Integrating payload design, planning, and control in the Dutch Utilisation Centre

Spacecraft payload design, experiment planning and scheduling, and payload control are traditionally separate areas of activity. This paper describes the development of a prototype software tool--the Activity Scheduling System (ASS)--which integrates these activity areas. ASS is part of a larger project to build a Dutch Utilisation Centre (DUC), intended eventually to support all space utilization activities in The Netherlands. ASS has been tested on the High Performance Capillary Electrophoresis payload. The paper outlines the integrated preparation and operations concept embodied in ASS. It describes the ASS prototype, including a typical session. The results of testing are summarized. Possible enhancement of ASS, including integration into DUC, is sketched.

Grant, T. J.↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Autonomous power system: Integrated scheduling

The Autonomous Power System (APS) project at NASA Lewis Research Center is designed to demonstrate the abilities of integrated intelligent diagnosis, control and scheduling techniques to space power distribution hardware. The project consists of three elements: the Autonomous Power Expert System (APEX) for fault diagnosis, isolation, and recovery (FDIR), the Autonomous Intelligent Power Scheduler (AIPS) to determine system configuration, and power hardware (Brassboard) to simulate a space-based power system. Faults can be introduced into the Brassboard and in turn, be diagnosed and corrected by APEX and AIPS. The Autonomous Intelligent Power Scheduler controls the execution of loads attached to the Brassboard. Each load must be executed in a manner that efficiently utilizes available power and satisfies all load, resource, and temporal constraints. In the case of a fault situation on the Brassboard, AIPS dynamically modifies the existing schedule in order to resume efficient operation conditions. A database is kept of the power demand, temporal modifiers, priority of each load, and the power level of each source. AIPS uses a set of heuristic rules to assign start times and resources to each load based on load and resource constraints. A simple improvement engine based upon these heuristics is also available to improve the schedule efficiency. This paper describes the operation of the Autonomous Intelligent Power Scheduler as a single entity, as well as its integration with APEX and the Brassboard. Future plans are discussed for the growth of the Autonomous Intelligent Power Scheduler.

Ringer, Mark J.↗

Winning Asset Management Improvement Team: Maintenance Planning and Scheduling in a Highly Regulated Environment

The Y-12 National Complex (Y-12) site has numerous aging facilities that are crucial to the Department of Energy and the national security strategy for the nation. Y-12’s commitment to safety and regulatory compliance is of the highest importance. The commitment to meet the national security mission also creates additional rigor and complexity to the everyday maintenance and planning process. Y-12 is a collection of many facilities, both old and new, nestled between two ridges in Oak Ridge, TN. Y-12 was made with the short-term focus of ending “The Great War” through the creation of the worlds’ first atomic bomb. Almost eighty (80) years have passed since the groundbreaking, with the mission of the site changing from decade to decade. While the mission has changed, the way Y-12 employees continuously meet the challenge has not. The site was created to react and overcome; Y-12 still takes pride in the ability to react and overcome. The difference is the site is no longer ignorant to the need for a better way to manage the aging facilities and infrastructure. Shear willpower and determination was once the way to reach the objectives, but as a wise man once said, “Work smarter, not harder.” The business case for change started within the senior leadership at Y-12. A team of managers sat down and dictated objectives to provide a clear scope for the maintenance planning and scheduling optimization team, to include our Eruditio integrated blended learning coaches. In addition to providing the direction, they also made themselves available for escalation of issues in the event the team ran in to road blocks.

99 GENERAL AND MISCELLANEOUS↗