Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

HBET V3.0 Installation Manual

The Hydropower Biological Evaluation Toolset (HBET) V3.0 now requires Python v3.11.0 to be installed, following the addition of the absolute fish injury rate prediction feature. This version introduces two new strike metrics—based on velocity and pressure—to provide a more precise understanding of the biological effects of fish collisions with rigid structures within the fish passage system. Additionally, SQL Server 2019 is the supported database for this release. This installation guide will walk users through the process of installing HBET V3.0 along with all necessary dependencies.

13 HYDRO ENERGY↗

Fermilab 2025 Summer Internship: Repairing Pre-Amplifiers with Mu2e Electronics Installation Team

The author spent nine weeks over summer 2025 working on the tracker electronics installation team for the Mu2e experiment. One of her main responsibilities was repairing high voltage (HV) and calibration (Cal) pre-amplifiers (pre-amps). During installation, the fragile wires connecting the two sockets to the pre-amp board must be bent, often leading to breakage. During production, the sockets and wires were initially soldered to the board at UC Berkely, then the whole pre-amp was coated in parylene before transport to Fermilab. The interns were able to expedite the repairs, and thus whole installation process, by using an alternative method on-site with epoxy. Another task they were responsible for, not included in the original project specifications, was attaching copper clips to specific vias on the Cals to reduce noise. The talk will give listeners insight into the daily problem-solving required by the novel technologies in the Mu2e project. The author would like to acknowledge her fellow Monmouth College undergraduate interns, Lizzie Durfee and Gianna Maughan, advisor and PI of the DOE RENEW Grant Dr. Christopher G. Fasano, and the Mu2e team lead by co-spokesperson Dr. Bob Bernstein and tracker L2 manager Dr. Brendan Kiburg.

de Zwart, Bronte [Monmouth Coll.]↗

Bolt installation and tensioning system

A bolt installation and removal (BIR) system is used for assembling and disassembling a nuclear vessel. The BIR system includes a platform with a stand for supporting the nuclear vessel. A track extends around an outside perimeter of the platform and multiple tool carts include wheels that roll on the track. Tool towers are located on the carts and include tool assemblies configured to install and remove bolts on the nuclear reactor vessel. Magazine towers also extend up from the tool carts next to the tool towers and include magazines that hold bolts for exchanging with the tool assemblies. Drive mechanisms move tool heads in the tool assemblies around a first vertical axis, vertically up and down, and laterally to more simply and reliably install and remove the bolts in a radioactive underwater environment.

Shaw, Steven W.↗

Strongly Tapered Helical Undulator System for Fast-greens Installation

RadiaBeam, in collaboration with UCLA and Fermilab, is developing a strongly tapered helical undulator system for the Tapering Enhanced Stimulated Superradiant Amplification experiment at 515 nm (TESSA-515). The experiment will be carried out at the FAST facility at Fermilab as a Gamma-Ray high Efficiency ENhanced Source (FAST-GREENS). The undulator system was designed by UCLA, engineered by RadiaBeam, and will be installed on the beamline at Fermilab (FNAL). The design is based on a permanent magnet Halbach scheme of four 1-meter long undulator sections; two of which have been completed and installed. The undulator period is fixed at 32 mm and the magnetic field amplitude can be tapered by tuning the gap along the interaction. Each magnet can be individually adjusted by 1 mm, offering up to 25% magnetic field tunability with a minimum gap of 5.58 mm. This paper discusses the design and engineering of the undulator system and the stage 0 installation status.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pyrolysis of Radioactive Spent Resins in the PRIME Installation - 20190

Montair and Belgoprocess developed the pilot PRIME (Pyrolysis Resins In Mobile Electric) Installation for treatment of spent resins in one single reactor without pre-treatment and without intermixing of other waste, allowing for easy traceability and isotopic characterization of the end product. Both low level waste (LLW, < 2 mSv/h) and medium level waste (MLW, > 2 mSv/h) can be treated in the installation. The PRIME pilot installation is designed to treat 2 batches of 100 liter of saturated ion exchange resins over a period of 24 hours. A dosing unit with screw feeder is used for the dosing of the saturated ion exchange resins to the pyrolysis reactor. This completely new developed innovative pyrolysis reactor contains a special design mechanical stirrer and can operate at a temperature of up to 600 deg. C under inert conditions. As a result, the organic molecules will decompose at an accelerated rate until only the mineralized material remains. The lower temperature and the absence of oxygen also prevent the breakdown of ion exchange resins into (powdery) ash, which is a considerable advantage during further handling. Gases that are released during drying and pyrolysis are treated in an also newly developed thermal oxidizer, which uses an innovative, electrically heated design instead of a traditional natural gas- or fuel oil secondary combustion chamber design. After passing through the thermal oxidizer, the gases are cooled down to saturation temperature and treated in the wet scrubbing system. An extraction fan keeps the system under negative pressure to prevent the possibility of any off-gas leakage out of the system. A series of tests were performed successfully with wet cationic resins, anionic resins and a mixture of both. The results of these tests are described in the presentation. For intellectual property protection, the system and process of pyrolysis of organic waste and the system of thermal oxidation of pyrolysis gases described in this paper are patent pending. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Preliminary Analysis of a U.S. Geothermal Heat Pump Installation Database

This paper seeks to addresses the significant gap in the literature regarding the installation and adoption of geothermal heat pump (GHP) systems in the United States. While the "2021 U.S. Geothermal Power Production and District Heating Market Report" published by the National Renewable Energy Laboratory (NREL) focused on direct-use geothermal district heating systems, it did not include an analysis of GHP installations (Robins et al. 2021). To bridge this gap, NREL has compiled a novel database currently containing 70,470 records of GHP installations, primarily sourced from state well permits and small-scale studies. Our methodology emphasizes the collection, cleaning, and standardization of data, addressing challenges such as inconsistent reporting formats and privacy concerns. Despite limitations in data on capacity, costs, and performance, our preliminary geospatial analysis reveals insights into the distribution of GHP systems across urban and rural areas and climate zones. The paper highlights the importance of publicly accessible data for advancing GHP technology adoption with a discussion of existing data sources and their limitations, advocating for improved collaboration between NREL and industry stakeholders.

data collection↗

Production and installation of wavelength-shifting reflective light enhancers for the Short-Baseline Near Detector

We report on the design, production, and installation of a wavelength-shifting reflective system on the cathode of the Short-Baseline Near Detector (SBND), a liquid argon time projection chamber located along the Fermilab Booster Neutrino Beam. To increase and homogenize scintillation-light collection, 64 double-sided plates were fabricated from FR4, laminated with specular reflector film and coated with 300 $μ$g/cm$^2$ of tetraphenyl butadiene (TPB) wavelength shifter using controlled physical vapor deposition. The coating uniformity was validated through dedicated measurements of deposited mass and profilometry studies. Because exposure to ambient blue/UV light could degrade the TPB, protective filtering and controlled storage conditions were implemented during handling and installation. The coated plates were assembled between conductive meshes for high-voltage compatibility and installed in situ during detector integration. This system constitutes the largest TPB-coated area deployed in a neutrino detector. It operates in conjunction with SBND's photon detection system, which consists of photomultiplier tubes and X-ARAPUCAs. Early light-collection measurements show high uniformity and light response across the detector, supporting improved triggering, calorimetry, and position reconstruction in SBND.

Acciarri, R. [Fermilab]↗

Revisiting the Effects of Photovoltaic Module Efficiency on Installed System Cost and Market Adoption

We conduct bottom-up analysis of how PV module efficiency could influence residential rooftop installed system costs, using models with improved representation of how soft costs and power electronics are affected by efficiency. We show that the amount of system installed cost savings resulting from high efficiency modules depends on whether or not the system is area-constrained, with much larger savings for the area-constrained case. We then estimate the fraction of physically area-constrained rooftops in the United States to be 61%, with variation between 20% to over 80% of rooftops depending on the state. We find that fraction of area-constrained systems could grow to over 88% by 2050 if building and transportation loads are electrified.

efficiency↗

EVI-LOCATE: One Stop Solution for Estimating Cost of Installing EV Charging Stations

EVI-LOCATE (Electric Vehicle Infrastructure-Locally Optimized Cost Assessment Tool and Estimator) is a site assessment tool to estimate costs to install EV charging stations. EVI-LOCATE enables users to generate site-specific, user-specific, and location-specific EV charging station installation designs and cost estimates. The tool integrates National Electrical Code, deep-learning pixel classification algorithm, and component-level costs to estimate the costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Increasing the Number of Installed Residential Heat Pump Water Heaters in the USA Through Improved Technology and Utility Programs

Heat pump water heaters (HPWHs) offer an efficient alternative to electric resistance water heaters, but they suffer from limited market penetration. This paper reviews the current state of HPWHs in the USA, focusing on technology developments and programs to increase adoption. What technological improvements are needed to make HPWHs a good fit in more homes? Additionally, what are the best ways of promoting HPWHs to consumers? Improved communication and controls will allow HPWHs to provide demand response and follow dynamic utility rates. To enable fuel-switching, HPWHs are being developed that only need a standard 120V outlet. Split HPWHs can alleviate the cooling and noise that limit the use of HPWHs in small homes, multifamily buildings, and cold climates. Additionally, new utility programs aim to train installers and provide incentives to distributors to increase the number of HPWHs installed. Some utilities offer novel incentive programs that have led to increased customer uptake. Those advances, coupled with improved controls for load shifting and new products such as split HPWHs and HPWHs that can run on 120V power, may finally move the market forward.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dynamic analysis of fully constrained Cable-Driven Parallel Robots for automated prefabricated component installation

This paper presents a dynamic analysis and validation framework to assess a fully constrained six-anchor Cable-Driven Parallel Robot (CDPR) for automated installation of prefabricated facade components. Compared with conventional eight-anchor systems, the six-anchor configuration simplifies setup and reduces cost, but it also reduces control authority, shrinks the wrench-feasible workspace, and tightens orientation limits. Consequently, it is unclear a priori whether dynamically feasible trajectories exist to move the end effector from pickup to the facade. A constrained trajectory optimization is formulated to enforce the system dynamics, cable-tension bounds, and pose/velocity limits, and the framework is evaluated in simulation at three levels: (i) an idealized reference model, (ii) a lab-scale prototype model incorporating measured anchor misalignments and identified damping, and (iii) a full-scale three-story building model with load decomposition for structural feasibility checks. Across these scenarios, the analysis shows that optimal, constraint-satisfying trajectories exist that move the end effector from pickup to installation while maintaining a near-plumb, level orientation at the final pose. Collectively, this multi-scale dynamic analysis and validation framework supports the deployment readiness of the six-anchor CDPR and provides a prototype-based sensitivity case study of how measured anchor placement deviations affect feasibility.

CDPR↗

Non-stationary precipitation design standards for stormwater infrastructure modernization at USAF installations

The resilience of defense infrastructure systems to a changing climate is critical for national security. Climate induced recurrent flooding is already impacting over 20 U.S. Air Force installations, underscoring the urgency of revisiting precipitation standards and stormwater infrastructure design. Despite growing scientific knowledge and an expanding set of tools for updating outdated precipitation standards based on the assumption of climate stationarity, the adoption of climate informed analyses remain limited in practice. This study utilizes an existing framework to update Intensity (or Depth)-Duration-Frequency (DDF) curves using an ensemble of future climate projections. Change factors in precipitation estimates are derived and applied to six USAF installations across the U.S. The analysis is further extended to evaluate the implications of climate-informed DDFs on stormwater infrastructure performance and flood analysis at Tyndall AFB. Results indicate that the current design precipitation estimates are likely to become obsolete in all six USAF bases by the end of the century. The wide range of change factors across 32 GCM ensembles highlights the need to integrate uncertainty and evolving scientific data into infrastructure planning. The study also finds that the impacts of a changing climate vary spatially and temporally, emphasizing the value of localized analysis for infrastructure decision-making. The work advances ongoing DoD and societal efforts to implement adaptation strategies aimed at enhancing infrastructure resilience.

Intensity-duration-frequency curves↗

Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector

The U.S. Spallation Neutron Source (SNS) is a state-of-the-art neutron scattering facility delivering the world’s most intense pulsed neutron beams to a wide array of instruments, which are used to conduct investigations in many fields of engineering, physics, chemistry, material science, and biology. Neutrons are produced by spallation of liquid Hg by the bombardment of short (∼1 µs), intense (∼35 A) pulses of protons delivered at 60 Hz by an accumulator ring which is fed by a high-intensity, 1 GeV, H− LINAC (linear accelerator). This facility has operated nearly continuously since 2006 but has recently undergone a 4-month maintenance period, which featured a complete replacement of the 2.5 MeV injector feeding the LINAC. The new injector was developed at ORNL in an off-line beam test facility and consists of an ion source, low energy beam transport, and a Radio Frequency Quadrupole (RFQ). This report first describes the installed configuration of the new injector detailing the ion source system. The first beam current, RFQ transmission, emittance, and energy measurements from the injector installed on the SNS are reported. These data not only show a significant performance improvement for our existing facility but will also make accessible the higher beam current requirements for future SNS upgrade projects: the proton power upgrade and second target station.

Welton, R. F.↗

Development of the high energy engineering X-ray (HEX) superconducting wiggler, magnetic measurement, installation, and commissioning

The High energy Engineering X-ray (HEX) diffraction beamline at the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Lab (BNL) is the first high-energy beamline capable of reaching 200 keV for a monochromatic beam. With the 3 GeV electron beam energy for the NSLS-II ring, only the superconducting wiggler (SCW) producing greater than 4 T peak field can cover these ranges with a sufficient number of photons. The 1.2 m-long HEX-SCW has a period length of 70 mm and a field strength on-axis of 4.3 T. It utilizes no liquid helium, and the vertical aperture size of the electron beam vacuum chamber is 8 mm. Unlike regular undulators/wigglers, there is no standard configuration for the magnetic measurement system for superconducting insertion devices. The NSLS-II Insertion Devices group has developed, in collaboration with the vacuum group, a novel in-vacuum Hall mapper with a 1.75 m in-vacuum linear motor and an in-vacuum flip coil system utilizing many commercial-off-the-shelf products. The measurements were conducted at the BNL, and the device was installed in the ring and commissioned. Here, this paper provides a description of the SCW and its magnetic measurement systems, as well as a brief account of the installation and commissioning efforts.

36 MATERIALS SCIENCE↗

LCLS-II helium cryoplant and cryo distribution system installation

The helium cryoplant and cryo distribution system (CDS) are key elements of the new superconducting Linac Coherent Light Source (LCLS-II) and will provide superfluid helium to the accelerator. The cryoplant consists of two helium refrigerators with an equivalent 4.5 K refrigeration capacity of 18 kW each. The 37 cryomodules of the LINAC will be operated at a temperature of 2.0 K to accelerate a 4 GeV electron beam that will generate extremely bright X-ray laser light. Two five-stage cold compressor cold boxes will be utilized to provide superfluid helium II for the superconducting cavity structures with a total cooling capacity of 8 kW at 2.0 K. This paper describes the installation of the LCLS-II cryoplant and CDS. The LCLS-II cryoplant was designed and contributed by Jefferson Lab. To expedite the project completion the reuse of proven design and technology from the Jefferson Lab CHL-2 cryoplant was the preferred strategy. The CDS consists of ~260 m thermally shielded and vacuum super insulated transfer lines, two distribution boxes and eight feed and end caps, and was designed and contributed by Fermilab. SLAC installed the cryoplant components into a newly erected building and the CDS components into the existing accelerator tunnel and klystron gallery with strong engineering support from both partner labs.

43 PARTICLE ACCELERATORS↗

Analysis of the Value Proposition of High-Efficiency, Multijunction Solar Modules for Residential Rooftop Installations

Utilizing detailed bottom-up models, we analyze the potential markets for high-efficiency photovoltaic modules in the United States. We first estimate the fraction of area-constrained residential rooftops that could benefit from increasing the availability of high-efficiency systems. We then model the impact of efficiency on installed system costs in these area-constrained scenarios. Finally, we explore the value proposition of high-efficiency, fixed-tilt micro-concentrator photovoltaic modules in a series of case studies of residential customers, modeling the levelized cost of energy, payback period, and annual bill savings. We find that efficiency can provide significant savings in installed system cost and improve value to the solar system owner. The improvement in value depends on location and the size of the rooftop, as well as the ability of a given technology to collect diffuse light and achieve low module costs.

14 SOLAR ENERGY↗

Capital Costs for Dual-Use Photovoltaic Installations: 2020 Benchmark for Ground-Mounted PV Systems with Pollinator-Friendly Vegetation, Grazing, and Crops

This report analyzes the installed system cost of various multi-land use PV system configurations. We used PV system bottom-up cost model accounting for all system and project-development costs incurred during the installation to model the costs for conventional PV systems, PV systems co-located with sheep grazing, PV systems co-located with pollinator friendly fields and PV systems co-located with crops. We also conducted extensive sensitivity analysis around different PV system design parameters given the nascent stage of this industry.

14 SOLAR ENERGY↗

Installation of Lysimeters and Monitoring Wells in Support of the Revised Approach to E-Area Performance Monitoring

Savannah River Site (SRS) has developed a revised approach to performance monitoring of the E Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised approach specifies modifications to the vadose zone monitoring program, the addition of new lysimeters at Engineered Trench 3 (ET3), and the installation of water table monitoring wells to complement the existing well network surrounding the ELLWF. This project summary report is intended to provide the final construction details and layout for the new vadose zone lysimeters at ET3 and the water table monitoring wells installed as part of the new saturated zone component of the revised performance monitoring program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗