Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “inspection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Enabling human–infrastructure interfaces for inspection using augmented reality

Decaying infrastructure maintenance cost allocation depends heavily on accurate and safe inspection in the field. New tools to conduct inspections can assist in prioritizing investments in maintenance and repairs. The industrial revolution termed as “Industry 4.0” is based on the intelligence of machines working with humans in a collaborative workspace. Contrarily, infrastructure management has relied on the human for making day-to-day decisions. New emerging technologies can assist during infrastructure inspections, to quantify structural condition with more objective data. However, today’s owners agree in trusting the inspector’s decision in the field over data collected with sensors. If data collected in the field is accessible during the inspections, the inspector decisions can be improved with sensors. New research opportunities in the human–infrastructure interface would allow researchers to improve the human awareness of their surrounding environment during inspections. This article studies the role of Augmented Reality (AR) technology as a tool to increase human awareness of infrastructure in their inspection work. The domains of interest of this research include both infrastructure inspections (emphasis on the collection of data of structures to inform management decisions) and emergency management (focus on the data collection of the environment to inform human actions). This article describes the use of a head-mounted device to access real-time data and information during their field inspection. The authors leverage the use of low-cost smart sensors and QR code scanners integrated with Augmented Reality applications for augmented human interface with the physical environment. This article presents a novel interface architecture for developing Augmented Reality–enabled inspection to assist the inspector’s workflow in conducting infrastructure inspection works with two new applications and summarizes the results from various experiments. The main contributions of this work to computer-aided community are enabling inspectors to visualize data files from database and real-time data access using an Augmented Reality environment.

Maharjan, D.↗

Annual Radioactive Waste Tank Inspection Program - 2018

The Department of Energy (DOE) requires that Savannah River Remediation LLC (SRR), the Liquid Waste contractor, maintain a robust and timely Structural Integrity Program for waste tanks that are leak-tight and for waste tanks that have leaked or are suspect. These requirements are promulgated in DOE Manual 435.1-1, Section II.Q.(2). A key aspect of SRR's implementation of these requirements is its annual tank inspection program. In 2018, the SRR Visual and In-Service Inspection Program used two visual imagery techniques to ascertain the integrity of the Savannah River Site (SRS) waste tanks: high resolution digital photography and closed-circuit television. The primary inspection method made use of direct photograph techniques, e.g., making a series of photographs providing detailed views of the tank and wide-angle photography for obtaining overviews of large areas. Closed-circuit television was then typically used to further investigate conditions found during the initial inspection. During 2018, a total of 4,853 photographs were taken and 47 video inspections were performed as part of this inspection program. Of the 51 waste tank systems at SRS that were designed, constructed, and placed into active service storing radioactive liquid waste, 43 remain in active service. Eight tanks have been cleaned, stabilized by filling with engineered grout, and removed from service (also known as operationally closed) -Tanks 5, 6, and 12 (Type I tanks); Tank 16 (Type II tank); and Tanks 17, 18, 19, and 20 (Type IV tanks). For the 43 waste tanks, inspections were successfully conducted in 2018 through all accessible annulus risers and inspection ports for nine Type I tanks, three Type II tanks, and 27 Type III/IIIA tanks; at least one inspection was made in the interior of four Type IV tanks (i.e., the tanks without annular spaces) above the liquid level in the tank. Rainwater continues periodically to be observed migrating into the annuli of some tanks. Evidence of this infiltration was primarily noted by observation of surface stains, and occasionally by calciferous deposits, changed configuration of salt deposits in the associated annulus, and mild surface corrosion. The conditions of the 43 tanks remained essentially unchanged from the conditions reported in 2017. The one key exception was the identification of eight new cracks in the Tank 15 primary tank wall. These newly identified cracks are located at 65, 67, 70, 76, 150, 152, 176 inches and 200 inches above the tank bottom. The identified cracks in Tank 15 do not constitute an impact on the structural integrity of the tank, as evaluated and confirmed in the referenced report, SRNS-STI-2008-00028, A Structural Impact Assessment of Flaws Detected During Ultrasonic Examination of Tank 15, and calculation, T-CLC-H-00890, Calculation of Critical Crack Lengths in HLW Tank 15. The 2018 inspection program confirmed the structural integrity and waste confinement capability of all 43 waste tanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SNL API-653 In-Service Tank Inspection and Evaluation Tank ID: 981-A2-T0 (West)

An API Standard 653 In-Service inspection was completed on Tank 981-A2-T0 (West) located at the Sandia National Laboratories TAIV tank farm in Albuquerque, NM on September 22, 2015. The inspection was completed to collect data to evaluate the mechanical integrity and fitness for continued service of the tank. No indication or records of any previous inspection were identified for this tank. The inspection and engineering evaluation were completed using API-653, 5 th Edition and conservative engineering practices. The tank was not removed from service, so an internal inspection could not be completed. The tank was also fully insulated. The insulation was removed in specified areas of the tank shell and tank chime to accommodate an acoustic emission scan of the tank and an ultrasonic thickness evaluation of portions of the tank. The acoustic emission scan resulted in a grade of B / I - II indicating an overall TANKPAC grade B and composite grade II indicating minor active damage with highly concentrated sources related to corrosion found in the southeast and west side section of the tank. Eight Potential Localized Damage sources were found mainly in the west side (re-test in 2 years). The tank chime could not be inspected due to the configuration of the insulation welded angle support. An ultrasonic guided bulk wave inspection was completed on the tank shell to assess the lower shell section. At the time of the inspection the limited data collected showed minimal material loss from the shell at the thickness monitoring locations, however, visual inspection and pit depth gauge measurements showed > 3/16” inch pitting and significant general external surface corrosion on the shell at the shell to floor joint. This corrosion is caused by the insulation sheeting support welded angle iron trapping moisture and dirt against the tank shell. This tank should be removed from service, internally inspected, and repaired. Ultrasonic thickness measurement locations were established on this tank and the data is included in this report. The limited data collected indicated minimal material loss at these locations, with the only noted corrosion occurring on the tank shell to floor joint as noted above. An API-653 Annex B Evaluation of Tank Bottom Settlement was completed and the results are included in this report. No significant settlement issues were identified.

42 ENGINEERING↗

Augmented Monitoring and Condition Assessment Program (AMCAP) Material Test Reactor (MTR) (Fuel Inspection Program Report)

The AMCAP MTR Fuel Inspection Program, a special inspection program comprised of four inspection campaigns, examined a total of ten (10) pre-selected aluminum-clad, aluminum-based fuel core spent nuclear fuel assemblies (ASNF) stored in the L Area Disassembly Basin (L Basin) at the Savannah River Site. A full description of the inspections and the results are reported. The fuel had been stored in bundled-tube storage (Vertical Tube Storage) for periods of 18 to 21 years. The prior service experience of the individual 10 assemblies varies, but all included irradiation followed by wet storage at international research reactor sites prior to shipment to the US and storage in L Basin. The 10 assemblies were expected to be among the “worst"’ in terms of prior corrosion damage of the entire inventory of the direct-bundle-stored ASNF in L Basin. The inventory of MTR ASNF in L Basin will continue to be stored in the bundled-tube configuration or in slug-storage buckets with inserts pending retrieval for ultimate disposition. The MTR fuel inspections focused on collecting information for characterization of the material condition of the ASNF considering various types of aluminum fuel corrosion degradation of its assembled materials in water storage. A custom-designed Fuel Inspection Table was used to stage the fuel for remote, enhanced visual examination (close-up video imaging & recording) with controlled lighting and positioning that enables reproducibility of imaging conditions. The inspections were conducted by fuel subject matter expert staff from Spent Fuel Project Engineering (SFPE) and the Savannah River National Laboratory (SRNL). Stills captured from the video records were used to compare the corrosion evolution from previous records, as available. This evaluation of the inspection results including the comparison to the previous inspection results demonstrate that the water quality and the storage configuration of ASNF in L Basin do not cause aggressive corrosion degradation of the fuel; mitigation of the prior corrosion degradation of the fuel also appears to have been achieved with the good water quality conditions of L Basin. Recommendations are made for future inspection of the fuel to trend corrosion degradation and demonstrate continued safe wet storage of the ASNF in L Basin. The next fuel examination is recommended to be performed in 5 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

43-0434 Bridge Inspection Report 2022

This report covers the inspection findings for the Routine Inspection of the Omega Bridge conducted on September 23-25, 2022 and the Fracture Critical Member (FCM) Inspection conducted on June 26-27, 2021. Note that due to complications with the under-bridge access unit, portions of the Routine Inspection and the entire FCM Inspection could not be completed in 2022. As a result, the superstructure condition reported herein is based on the 2021 inspection whereas the deck and substructure conditions are based on the 2022 inspection. The superstructure condition will be updated when the inspection is completed in 2023. The inspections were completed according to the standards referenced in EXHIBIT “D” SCOPE OF WORK AND TECHNICAL SPECIFICATIONS including the National Bridge Inspection Standards (23 CFR Part 650, dated 12/14/2004) and other FHWA, NMDOT, and AASHTO codes and standards.

42 ENGINEERING↗

Automated Inspection of Criticality Control Overpacks for Surplus Plutonium Disposition: Qualification Update – 25313

In an effort to reduce the amount of nuclear waste in South Carolina, the Department of Energy (DOE) tasked the Savannah River Site (SRS) with diluting and disposing of the amount of plutonium in the state. This process involves the movement and shipment of over 100,000 criticality control overpacks (CCOs) throughout the project lifespan, lending itself to the use of automation to reduce worker radiation exposure and more efficiently utilize human capital. Due to the large scope, this overarching process was broken down into several different “automation projects” to be developed. The first opportunity pursued was the receipt and inspection of empty CCO drums coming into SRS, identified as Automation Project 1 (AP1), and is the focus of this paper. AP1 was developed to unpack incoming CCOs and inspect them for unwanted foreign objects and any damage to the drum or its contents. This process is accomplished by the combination of an automated guided vehicle (AGV) that delivers CCOs to a robotic arm which uses a suite of custom tools to disassemble a CCO, inspect the inside and outside of the CCO and its inner criticality control container (CCC), reassemble the CCC and CCO, and apply a tamper indicating device (TID) to the inspected drum. In past years, the robotic work cell had been developed in a small-scale testing facility for proof-of-concept. This year, major improvements were made to the robotic work cell to perform the process, including integration into the final facility where CCOs will be inspected. Other technical improvements include the implementation of sensor feedback and safety relays into the control system to allow the state of the work cell to be better tracked, and additional development of the TID application process to complete the robotic inspection. Further enhancements were made to the robotic vision processes and robot pathing, as well as development on a computer vision inspection process to detect inspection criteria anomalies in CCOs. In addition to developmental improvements, the work cell underwent a six-month testing period to ensure the project requirements were met. Results of this testing period demonstrate the work cell’s capability to meet project throughput goals at an acceptable level, successfully document the status of each CCO inspected, and reduce the toll on technical operations’ human power by two thirds. At the time of this paper, the work cell is capable of autonomously handling up to eight CCOs with an AGV, delivering CCOs to and from the robot work cell, and having a robotic arm perform a full receipt and inspection procedure on each CCO. Moving forward, repeatability will be improved so that these CCOs can be run back-to-back seamlessly, as well as improving the system to handle more significant edge cases and failure modes.

Spivey, Nicholas↗

Robotic NDE inspection of advanced solid rocket motor casings

The Advanced Solid Rocket Motor program determined the need to inspect ASRM forgings and segments for potentially catastrophic defects. To minimize costs, an automated eddy current inspection system was designed and manufactured for inspection of ASRM forgings in the initial phases of production. This system utilizes custom manipulators and motion control algorithms and integrated six channel eddy current data acquisition and analysis hardware and software. Total system integration is through a personal computer based workcell controller. Segment inspection demands the use of a gantry robot for the EMAT/ET inspection system. The EMAT/ET system utilized similar mechanical compliancy and software logic to accommodate complex part geometries. EMAT provides volumetric inspection capability while eddy current is limited to surface and near surface inspection. Each aspect of the systems are applicable to other industries, such as, inspection of pressure vessels, weld inspection, and traditional ultrasonic inspection applications.

Mcneelege, Glenn E.↗

Automated Eddy Current Inspection on Space Shuttle Hardware

Over the life time of the Space Shuttle program, metal parts used for the Reusable Solid Rocket Motors (RSRMs) have been nondestructively inspected for cracks and surface breaking discontinuities using magnetic particle (steel) and penetrant methods. Although these inspections adequately screened for critical sized cracks in most regions of the hardware, it became apparent after detection of several sub-critical flaws that the processes were very dependent on operator attentiveness and training. Throughout the 1990's, eddy current inspections were added to areas that had either limited visual access or were more fracture critical. In the late 1990's. a project was initiated to upgrade NDE inspections with the overall objective of improving inspection reliability and control. An automated eddy current inspection system was installed in 2001. A figure shows one of the inspection bays with the robotic axis of the system highlighted. The system was programmed to inspect the various case, nozzle, and igniter metal components that make up an RSRM. both steel and aluminum. For the past few years, the automated inspection system has been a part of the baseline inspection process for steel components. Although the majority of the RSRM metal part inventory ts free of detectable surface flaws, a few small, sub-critical manufacturing defects have been detected with the automated system. This paper will summarize the benefits that have been realized with the current automated eddy current system, as well as the flaws that have been detected.

Hartmann, John↗

Double-Shell Tank Visual Inspection Changes Resulting from the Tank 241-AY-102 Primary Tank Leak

As part of the Double-Shell Tank (DST) Integrity Program, remote visual inspections are utilized to perform qualitative in-service inspections of the DSTs in order to provide a general overview of the condition of the tanks. During routine visual inspections of tank 241-AY-102 (AY-102) in August 2012, anomalies were identified on the annulus floor which resulted in further evaluations. In October 2012, Washington River Protection Solutions, LLC determined that the primary tank of AY-102 was leaking. Following identification of the tank AY-102 probable leak cause, evaluations considered the adequacy of the existing annulus inspection frequency with respect to the circumstances of the tank AY-102 1eak and the advancing age of the DST structures. The evaluations concluded that the interval between annulus inspections should be shortened for all DSTs, and each annulus inspection should cover > 95 percent of annulus floor area, and the portion of the primary tank (i.e., dome, sidewall, lower knuckle, and insulating refractory) that is visible from the annulus inspection risers. In March 2013, enhanced visual inspections were performed for the six oldest tanks: 241-AY-101, 241-AZ-101,241-AZ-102, 241-SY-101, 241-SY-102, and 241-SY-103, and no evidence of leakage from the primary tank were observed. Prior to October 2012, the approach for conducting visual examinations of DSTs was to perform a video examination of each tank's interior and annulus regions approximately every five years (not to exceed seven years between inspections). Also, the annulus inspection only covered about 42 percent of the annulus floor.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

What, why and when to go virtual: An international analysis of early adopters of virtual building energy codes inspections

To meet greenhouse gas reduction targets, several countries are pursuing more ambitious policies in their buildings and construction sectors, such as introducing zero net energy/carbon building codes. Countries often report not having enough qualified staff for performing building energy code inspections and many are exploring faster, easier, and more reliable methods to check the compliance of buildings with their codes. Building inspections are a critical element for ensuring code compliance and they have traditionally been performed in person. However, in-person inspections can be labor and travel intensive, costly, and prone to human error. In this paper, the authors explore how virtual inspections, particularly in light of the recent COVID-19 pandemic, have impacted processes for building code compliance checks in jurisdictions and communities around the world. Here, the authors collected data on four key parameters (time and financial savings, scope of inspections, changing practices and technological innovation, and benefits to consumers) from six jurisdictions and communities in five countries (Australia, Canada, Singapore, United Arab Emirates, and the United States) to analyze the impacts of virtual inspections on code compliance checks. The analysis found the greatest value from virtual inspections in geographically dispersed regions and for cities experiencing rapid building construction. The study also explored emerging technologies that are being piloted for virtual inspections. Although many of these technologies hold promise, more resources and capacity are needed to make them viable for use in building energy code inspections.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2010

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2010 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2010 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2009-00138, HLW Tank Farm Inspection Plan for 2010, were completed. Ultrasonic measurements (UT) performed in 2010 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 30, 31 and 32 and the findings are documented in SRNL-STI-2010-00533, Tank Inspection NDE Results for Fiscal Year 2010, Waste Tanks 30, 31 and 32. A total of 5824 photographs were made and 1087 visual and video inspections were performed during 2010. Ten new leaksites at Tank 5 were identified in 2010. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.5. Ten leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. None of these new leaksites resulted in a release to the environment. The leaksites were documented during wall cleaning activities and the waste nodules associated with the leaksites were washed away. Previously documented leaksites were reactivated at Tank 12 during waste removal activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-situ visual inspection of the CASTOR V/21 used nuclear fuel dry storage cask: a demonstration of camera system capabilities - 15505

On June 11, 2014 the Gesellschaft fur Nuklear Service (GNS) CASTOR V/21 spent fuel dry storage cask was inspected in-situ at the Idaho Nuclear Technology and Engineering Center (INTEC). The purpose of this inspection is to demonstrate and document the technology necessary to perform inspections of spent fuel dry storage casks. The inspection includes internal temperature measurement, internal radiation measurement, and a visual examination using a bore-scope type camera system inserted through the cask fill/drain penetration. It is concluded from this inspection that in-situ inspections of bolted lid spent fuel storage containers is possible using current camera technologies. Using 3D Phase Measurement Technology, measurements of entities such as cracks or corrosion are possible. The internal surfaces of the CASTOR V/21 cask that were inspected were free of corrosion and exhibited no evidence of degradation. One crack identified in previous inspections was examined and appeared the same as in the previous inspections. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

241-AY-102 Leak detection pit drain line visual inspection - 15678

In October 2012, Washington River Protection Solutions LLC (WRPS) determined that waste had leaked into the annulus of Tank 241-AY-102. WRPS conducted an extensive review of Tank AY-102 and increased both inspection and monitoring of the tank; however, the precise cause and location of the leak could not be determined. In parallel with the leak in the primary tank, the Tank AY-102 leak detection pit (LDP) was accumulating water through the drain system external to the secondary tank liner. Liquid collecting in the LDP is suspected to be from water intrusion and collects at a rate such that the LDP must be pumped routinely. Following a routine pumping event on June 20, 2013, elevated radiation dose rates were noted on the transfer hose and surface contamination readings were found on the transfer pump when it was removed from the Tank AY-102 LDP. These two field readings suggested that tank waste from a secondary liner breach could be leaking into the LDP. As a result, WRPS initiated a plan to ascertain the integrity of the secondary tank liner including a robotic inspection of the LDP. To perform the robotic visual inspection, a custom robotic crawler with a deployment device was designed, built, and operated by IHI Southwest for WRPS to inspect the 6 in (152 mm) leak detection pit drain line. To ensure success when deployed in the field, the inspection equipment was demonstrated at both the IHI facility in Denver, Colorado, and the Hanford Site using full scale piping mockups. On November 20, 2013 WRPS inspected the 6 in (152 mm) diameter drain line. The deployment device successfully attached to the drain line, and the crawler entered the drain line and traversed to within approximately 7 ft (2.1 m) of the central sump located under the center of the tank before losing traction. Crawler performance was satisfactory, and the quality of the camera image and lighting provided sufficient detail to document the current condition of the visible regions of the pipe. The inspection showed that the majority of the drain line was dry. Two wet areas were observed, a portion of the line nearest the LDP and a portion near the center of the tank. The portion nearest the LDP was under water prior to pumping on November 14, 2013. Although sediment and debris were seen during the inspection, it is believed to be construction debris and corrosion products. No material was found in the inspection that looked like tank waste or the material seen in the Tank AY-102 annulus (i.e., no greenish or yellowish deposits or dark fluids, dried salt deposits, or crystalline material). The contamination levels seen on the crawler were consistent with past values seen on LDP pumping equipment. Sampling and analysis of the recovered residues from the crawlers did not find material consistent with tank waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada, for Calendar Year 2007

This report presents data collected during the annual post-closure site inspection conducted at the Central Nevada Test Area Surface Corrective Action Unit (CAU) 417 in May 2007. The annual post-closure site inspection included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspection conducted at the UC-1 Central Mud Pit (CMP) indicated the site and soil cover were in good condition. No new cracks or fractures were observed in the soil cover during the annual inspection. A crack on the west portion of the cover was observed during the last quarterly inspection in December 2006. This crack was filled with bentonite as part of the maintenance activities conducted in February 2007 and will be monitored during subsequent annual inspections. The vegetation on the soil cover was adequate but showing signs of the area's ongoing drought. No issues were identified with the CMP fence, gate, or subsidence monuments. New DOE Office of Legacy Management signs with updated emergency phone numbers were installed as part of this annual inspection, no issues were identified with the warning signs and monuments at the other two UC-1 locations. The annual subsidence survey was conducted at UC-1 CMP and UC-4 Mud Pit C as part of the maintenance activities conducted in February 2007. The results of the subsidence surveys indicate that the covers are performing as expected, and no unusual subsidence was observed. A vegetation survey of the UC-1 CMP cover and adjacent areas was conducted as part of the annual inspection in May 2007. The vegetation survey indicated that revegetation continues to be successful, although stressed due to the area's prevailing drought conditions. The vegetation should continue to be monitored to document any changes in the plant community and to identify conditions that could potentially require remedial action to maintain a viable vegetation cover on the site. It is suggested that future vegetation surveys be conducted once every 2 years or as needed to help monitor the health of the vegetation.

54 ENVIRONMENTAL SCIENCES↗

Thermographic Inspection of Aerospace Tankage

Thermography has been shown to be the ideal technical and economic inspection method for two applications - post-machining evaluations and for field inspections of damage and repair. For most manufacturing applications ultrasonic inspections are already available and established. There is no question about the detectability or cost when inspecting hardware out of the autoclave. But when the part is too large to bring to the scanning inspection system or you do not want to remove the hardware from its current setup then a more portable or field applicable inspection is required. This paper will describe two applications of thermography on composite inspections. The NASA NDE Team and Lockheed Martin conducted the work at NASA s George C. Marshall Space Flight Center (MSFC). The first application was inspecting machined hardware. The technique and example data will be presented along with the advantages of thermography. Examples of drilling holes and trimming the edges will be discussed. The second application will be the evaluation of damage in a composite part and the subsequent repair of the region will be presented. The technique, data, and benefits of this application will also be presented along with the follow-up inspection of the post- repaired hardware.

Bouvier, Carl↗

Full Life-Cycle Defect Management Assessment: Initial Inspection Data Collection Results and Research Questions for Further Study

It is often the case in software projects that when schedule and budget resources are limited, the Verification and Validation (V&V) activities suffer. Fewer V&V activities can be afforded and moreover, short-term challenges can result in V&V activities being scaled back or dropped altogether. As a result, too often the default solution is to save activities for improving software quality until too late in the life-cycle, relying on late-term code inspections followed by thorough testing activities to reduce defect counts to acceptable levels. As many project managers realize, however, this is a resource-intensive way of achieving the required quality for software. The Full Life-cycle Defect Management Assessment Initiative, funded by NASA s Office of Safety and Mission Assurance under the Software Assurance Research Program, aims to address these problems by: Improving the effectiveness of early life-cycle V&V activities to make their benefits more attractive to team leads. Specifically, we focus on software inspection, a proven method that can be applied to any software work product, long before executable code has been developed; Better communicating this effectiveness to software development teams, along with suggestions for parameters to improve in the future to increase effectiveness; Analyzing the impact of early life-cycle V&V on the effectiveness and cost required for late life-cycle V&V activities, such as testing, in order to make the tradeoffs more apparent. This white paper reports on an initial milestone in this work, the development of a preliminary model of inspection effectiveness across multiple NASA Centers. This model contributes toward reaching our project goals by: Allowing an examination of inspection parameters, across different types of projects and different work products, for an analysis of factors that impact defect detection effectiveness. Allowing a comparison of this NASA-specific model to existing recommendations in the literature regarding how to plan effective inspections. Forming a baseline model which can be extended to incorporate factors describing: the numbers and types of defects that are missed by inspections; how such defects flow downstream through software development phases; how effectively they can be caught by testing activities in the late stages of development. The model has been implemented in a prototype web-enabled decision-support tool which allows developers to enter their inspection data and receive feedback based on a comparison against the model. The tool also allows users to access reusable materials (such as checklists) from projects included in the baseline. Both the tool itself and the model underlying it will continue to be extended throughout the remainder of this initiative. As results of analyzing inspection effectiveness for defect containment are determined, they can be shared via the tool and also via updates to existing training courses on metrics and software inspections. Moreover, the tool will help satisfy key CMMI requirements for the NASA Centers, as it will enable NASA to take a global view across peer review results for various types of projects to identify systemic problems. This analysis can result in continuous improvements to the approach to verification.

Shull, Forrest↗

Novel Serpentine Robot Combinations for Inspection in Hard-to-Reach Areas of Damaged or Decommissioned Structures - 17335

U.S. government agencies, particularly the Dept. of Energy, need robotic tools to handle and inspect high-consequence materials - materials for which mishandling would result in great risk to both application operators and the general public. The remediation and documentation of nuclear waste has become a problem of national significance and it cannot be addressed without robotic tools. The use of robots bypasses the danger and decreases the preparation time to handle harmful materials. In the 1980's and 90's, the US Dept. of Energy (DOE) invested heavily in robotic technologies as part of a comprehensive program of research and development aimed at enabling safer and more efficient cleanup of nuclear waste sites. For the next generation of harder, more complex clean-up problems, there is a clear need for more R and D. There is a clear need for flexible, quickly deployable robotic technologies that can be configured to respond to unforeseen situations -- or can be purpose-built for planned activities -- while keeping human workers safe, yet effective. Modularity and inter-operability are core capabilities for inspection tasks in contaminated facilities with a large variety of inspection problems. With any tool, familiarity breeds ingenuity, and ingenuity leads to new innovations in efficiency, effectiveness, safety, and performance. For example, the simple screwdriver can be held fourteen different ways by an experienced machinist who knows exactly what he or she wants to accomplish at any given moment. As a tool, robots are no different. To maximize the efficiency, effectiveness, safety and performance, redeployment and reuse of familiar tools is essential. Modularity can assist with re-deployment and modularity manifests itself in both hardware and software. In some applications of inspection of high-consequence materials, a common concern has been the simplicity of the tool -- often correlated with cost (which is not always accurate) -- in case it becomes unrecoverable. In the case of robots, which have complex user interfaces and complex dynamics of interaction, the lack of familiarity can lead to clumsy operations and reduced accumulation of knowledge. As a result, while incremental successes may be achieved with sequential uses of different robots, there often is little knowledge gain that is generalizable across multiple uses. Total cost often goes down when a more sophisticated, but more familiar tool, can be used more frequently.An example is the inspection of the H-Canyon Exhaust Air Tunnel at the Savannah River Site nuclear waste facility in the United States [1]. This is a particularly nasty environment, due to the acidic gases, large amounts of erosion and debris, and wet, mucky puddles. Over the past twelve years, six inspections have been attempted with five different robotic vehicles. In fact, these inspections have been successful with their limited, but progressively increasing objectives, although most robots have been abandoned in the tunnel. While each vehicle has cost less than $75,000 (the sacrificial part), the total costs of development have been much higher. The robots used to investigate changed much from iteration to iteration and it is not clear a strong body of generalizable expertise was built up across trials. The authors of this study demonstrated the combination of two types of modular, serpentine, re-configurable robots for locomotion over complex terrains and the inspection of hard-to-reach areas. The MOTHERSHIP is a tread/limb/serpentine hybrid robot design for locomotion over complex terrains, while the CMU snake robot provides highly articulated inspection of highly confined spaces. The demonstration at the Portsmouth Gaseous Diffusion Plant involves a combination of the two whereby gross locomotion is achieved with the MOTHERSHIP and the CMU Snake deploys a sensor package to gather data from behind and under obstacles. Although statically configured in its present state, the combined robot is built of individual modules for which reconfiguration has been demonstrated in both labs at Purdue and CMU. In future work, much higher degrees of reconfiguration and re-purposing of both software and hardware are easily achievable with these unique platforms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dry coupled magnetostrictive transducers for robotic inspection of dry storage casks - 15304

The lack of a national repository for used nuclear fuel has lead to the usage of dry storage casks as the de facto long term storage solution, the usage of which is prevalent throughout the United States. Furthermore, as shown in figure 3, the usage of dry storage is only expected to increase over time. Because these casks were originally intended as only an interim measure, there is an urgent need to develop methods to monitor their structural health over the long-term. Additionally, when concerns about the susceptibility of these casks to cracking is considered, the need for inspection becomes even more apparent. The use of robotic devices to inspect the interior of these casks for signs of damage has been proposed, but in order for this to be realized, advances in sensing technology must occur. We develop a novel type of transducer for non-destructive evaluation to aid in these efforts. We construct a prototype sensor, demonstrate simple defect detection with it, and present a design for an inspection robot equipping these transducers. Ultrasonic inspection is a well known method of non-destructive evaluation which works by measuring the response of ultrasonic waves propagating through a material. In through-transmission inspection, a transmitter and receiver are used to generate and detect waves in the material to be inspected. The presence of a crack or defect in the material will scatter some of the transmitted wave's energy, reducing the strength of the response at the receiver. Magnetostrictive transducers are often used to generate and detect guided waves. These transducers depend on the magnetostrictive effect, where certain materials will deform in the presence of a magnetic field. The typical construction of one of these transducers is shown in figure 5, consisting of a magnetostrictive foil, meandering coil, and a biasing magnet. Materials typically used for the foil include Fe-Co and Terfenol-D. For wave generation, a high-frequency alternating current is supplied to the coil of the transducer, which generates an oscillating magnetic field that causes the foil to deform. For reception, the inverse occurs: deformation of the foil results in a current in the coil that can be detected. The deformation of the foil is usually coupled to the material to be inspected with an adhesive, and waves are transmitted through this bond. Obviously, an inspection robot cannot have its sensors bound to the surface of the cask. A robot is being designed for inspection, and it must deal with many challenges inside the cask, including tight confines, right-angle transitions, high temperatures, and radiation. For our initial design, we consider only the geometrical constraints, and present a design for a prototype that can be assembled from COTS components. The robot needs to be articulated to navigate the bends in the cask, so each wheel is individually actuated. The robot is controlled via a tether, which also supplies electrical power and compressed air. For localization, ultrasonic range-finders and a camera are equipped. Using the basic transducer, we experimented with various configurations of materials and geometry. In order to gather relevant data, we used force sensitive resistors to measure applied force, and a Matec computer system to generate and measure ultrasonic waves. A testing rig was constructed to simulate the geometrical constraints of the interior of the cask, and we experimented using deadweights, a pneumatic cylinder, and an air bladder to apply the force. It was discovered early in the testing process that the performance of the transducer was very sensitive to the alignment of the components, and the method by which the foil was attached. To maximize performance, we designed an enclosure that would hold the components in alignment while still allowing the foil to float. To test the effectiveness of our new transducer, we cut circular holes of varying diameter in 2 mm aluminum plate, and measured the response across them. It can be seen that there is a clear relationship between the strength of the received signal and the force applied, and to a lesser extent, the size of the defect. This design performs adequately as a proof of concept, and a more precisely fabricated enclosure should further increase the accuracy of its measurements.

42 ENGINEERING↗