Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Insights for Canadian electricity generation planning from an integrated assessment model: Should we be more cautious about hydropower cost overruns?

Hydropower accounts for approximately 60% of electricity generation in Canada, with growth expected in the coming decades as part of renewable energy transitions; however, frequent cost overruns threaten the viability of this growth. Here, using the integrated assessment model GCAM, we develop an endogenous representation of hydropower for Canada that accounts for market dynamics, thus permitting analysis of hydropower competition with other electricity generation technologies, both with and without cost overruns. Results show that modelling hydropower resources endogenously increases Canadian hydropower deployment relative to an assumption of fixed hydropower production, from 417 to 495 TWh annually by 2050. In scenarios that apply cost overruns at historical levels, hydropower loses market share to more easily scalable technologies like wind power. When including high cost overrun assumptions, the model determines that hydropower falls from about 73% to 65% of Canadian electricity generation by 2050, while wind power increases from about 8% to 11%. Countries may be better able to achieve electrification and renewable energy targets at lower cost by avoiding large-scale, overrun-prone hydropower and nuclear generation projects. Model results support that cost overruns are important considerations for policy decisions related to electricity sector development in Canada and elsewhere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating power grid model hydropower feasibility with a river operations model

Production cost models (PCMs) simulate dispatch of generators across a large power grid and are used widely by planners to study the reliability of electricity supply. As energy systems transition away from the thermoelectric technologies that have traditionally balanced electricity supply and demand, hydropower and its representation in PCMs is of increasing importance. A limitation of PCMs applied to continental power grids with diverse generation portfolios is that hydropower generation is simulated without full consideration of complex river dynamics, leading to possible misrepresentation of grid flexibility and performance. In addition, data used in PCMs may reflect outdated operating policies. In this paper we propose a hydropower generation feasibility test for PCMs. The approach uses a detailed hydropower model to determine whether the hourly hydropower schedule from a PCM with simplified monthly parameterization can be attained after accounting for realistic river dynamics and operating policies, such as spill requirements and general water movement and balance through a cascade reservoir system. We perform this hydropower generation test for the ‘Big 10’ hydropower system on the Columbia River (part of the Western Interconnect of the United States), revealing 9% overestimation of available hydropower generation in a PCM solution in an average hydrologic year. Our evaluation provides insight on the cost and opportunities for better representing hydropower in PCMs.

54 ENVIRONMENTAL SCIENCES↗

Hydropower operation in future power grid with various renewable power integration

Hydropower generation may play an increasingly important role in the power grid under increasing contribution of variable renewable sources such as wind and solar. An improved understanding of the changes to hydropower dispatch under future higher VRE grid conditions reveals research gap that should be informed power grid planning and reservoir water releases policies considering multiple other water uses and varying hydrologic condition. Here this study aims to understand the role of hydropower in a changing power grid by employing a production cost model, PLEXOS, across future power system scenarios, planning horizons, and regions. We explore optimized hydropower dispatch to understand its potential role in minimizing the system cost and renewable curtailment. We also examine the sensitivity of hydropower revenue under various grid scenarios of the Eastern U.S. and hydrology conditions. Results indicate hydropower generation follows net load and compensates for the variability of solar and wind generation. Although energy prices are lower during some periods in the future grid scenarios, there is a potential for higher revenue for hydropower by providing both energy and ancillary services during times of stress. Additionally, hydropower revenue is sensitive to hydrology in the SERC region, which we considered as an example. The feasibility of hydropower dispatching with higher ramps between low and high hourly-capacity factors, as indicated in the optimization model, requires further study to consider other water use and ecology constraints.

13 HYDRO ENERGY↗

Environmental DNA as a tool for hydropower impact assessments: current status, special considerations, and future integration

Globally there is an urgent need to find sustainable solutions to balance energy production with the protection of vulnerable species and conservation of biodiversity. This is particularly critical for freshwater ecosystems, habitats, and species that may be impacted by hydropower development and operations needed to meet energy grid demands. Reliable and accurate environmental impact assessments (EIAs) that identify the biological, physical, or social impacts of hydropower are key to ensure biodiversity, ecosystem, and societal sustainability. The analysis of environmental DNA (eDNA) has the potential to transform hydropower EIAs, management and mitigation planning, and decision-making procedures. Further, the incorporation of eDNA surveys into EIAs during both hydropower planning and continued operations may streamline regulatory processes by improving our understanding of potentially impacted biota and habitats and evaluating environmental impacts mitigation. Here, we: (i) highlight current understanding and use of eDNA in freshwater environments; (ii) examine critical considerations for eDNA integration into hydropower EIAs and biological monitoring; (iii) identify knowledge gaps in eDNA analysis and applications unique to hydropower-regulated systems; and (iv) discuss future opportunities to bolster the incorporation of eDNA into hydropower research including regulatory acceptance and public engagement. While we acknowledge that there are several factors that may complicate the broad adoption of eDNA as a tool for assessing the impacts of hydropower, we anticipate that growing confidence in eDNA through hydropower-specific protocols, calibrations, and validations will overcome these inherent uncertainties.

aquatic biodiversity↗

Consolidated Hydropower Data Repository: Value and Opportunities

Hydropower is one of several types of generating assets that provides energy, capacity, and services to electric power systems. It does so under rubrics and objectives—market driven and regulated, internal and external to asset and fleet owners—that address reliability, cost, price, and, increasingly, flexibility of output. The aggregation of data from multiple hydropower units can provide insights into asset operations and maintenance practices and needs and assist in meeting hydropower objectives. This paper examines the concept and potential benefits of aggregating hydropower asset data—primarily supervisory control and data acquisition (SCADA) information—with examples of insights developed from data aggregated by the Hydropower Research Institute (HRI). Data aggregation as discussed herein, and as implemented by the HRI, extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. Examples of research and analytics from such aggregated datasets range from unit load dependency analyses to modeling sensor measurements to detect and diagnose anomalies in assets. These examples showed the benefits of utilizing the entire dataset for insights into how the sensor layout of a single unit or set of units compares to the hydropower industry overall. Such insights include whether additional sensors are needed to complete analyses or to make decisions. In addition, utilizing multiple sensors of the same kind within a unit can provide an indication of possible current or upcoming problems with equipment. Although other analyses are possible, their use requires the development of complex models and, potentially, access to types of data that are currently not included with the example dataset used in this study. However, the examples studied herein confirmed the value of data aggregation in the fleet and unit contexts, and the value extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. The assessments also provided insights into potential extensions to the data aggregation concept that could further add to their value to the hydropower community, and these are included in this document as a set of recommendations.

13 HYDRO ENERGY↗

Price Formation in Zero-Carbon Electricity Markets: The Role of Hydropower

In April 2019, Water Power Technologies Office (WPTO) launched the HydroWIRES Initiative to understand, enable, and improve hydropower and pumped storage hydropower’s (PSH’s) contributions to reliability, resilience, and integration in the rapidly evolving U.S. electricity system. The unique characteristics of hydropower, including PSH, make it well suited to provide a range of storage, generation flexibility, and other grid services to support the cost-effective integration of variable renewable resources. The U.S. electricity system is rapidly evolving, bringing both opportunities and challenges for the hydropower sector. While increasing deployment of variable renewables such as wind and solar have enabled low-cost, clean energy in many U.S. regions, it has also created a need for resources that can store energy or quickly change their operations to ensure a reliable and resilient grid. Hydropower (including PSH) is not only a supplier of bulk, low-cost, renewable energy but also a source of large-scale flexibility and a force multiplier for other renewable power generation sources. Realizing this potential requires innovation in several areas: understanding value drivers for hydropower under evolving system conditions, describing flexible capabilities and associated tradeoffs associated with hydropower meeting system needs, optimizing hydropower operations and planning, and developing innovative technologies that enable hydropower to operate more flexibly.

13 HYDRO ENERGY↗

Needs and Opportunities for Testing of Hydropower Technology Innovations

Despite hydropower’s status as a well-established technology, changes in the global energy sector have prompted a variety of necessary hydropower technological innovations. Examples include efficient lowhead turbines, more flexible and dispatchable hydropower and pumped storage systems to complement variable and intermittent renewable resources, and technologies providing higher environmental performance. However, while innovative technologies are currently being proposed to meet these development challenges, small hydropower facility owners do not have sufficient risk-bearing capacity to adopt new, unvalidated technologies. This discourages manufacturers from bringing nascent technologies to market and stalls the technological growth of the sector. To reduce the risks associated with new technologies and promote further innovation, systemic (and sometimes unconventional) validation activities and new testing capabilities for hydropower are highly desired. These testing capabilities must demonstrate the safety, environmental acceptability, reliability, and performance of innovative technologies to quantify their value compared with existing technologies. Establishing these capabilities through dedicated testing facilities will be key to promoting hydropower growth in the United States. Following direction from the House Energy and Water Development Committee, the US Department of Energy’s Water Power Technologies Office (WPTO) has been tasked with understanding the state of hydropower testing in the United States. This scoping report discusses the needs and opportunities of hydropower testing in the United States, with a specific focus on small hydropower. Future developments will likely mostly target low-head sites with less than 30 ft (9.1 m) from new stream-reach developments, non-powered dam retrofits, and rehabilitation/upgrade of existing plants.

13 HYDRO ENERGY↗

Hydropower Infrastructure – LAkes, Reservoirs, and RIvers (HILARRI)

HILARRI is a database of links between major datasets of operational hydropower dams and powerplants, and inland water bodies. These connections are critical for conducting large-scale analysis of hydropower infrastructure and their associated natural and engineered water systems. Features include: – Dams from the National Inventory of Dams (2024) and the Global Reservoir and Dam Database (GRanD v1.3) – Hydropower plants from the Existing Hydropower Assets dataset (EHA 2024) These hydropower infrastructure features are linked to several major datasets that provide hydrologic and hydraulic information relevant for analysis of hydropower systems that includes the integral water resources. That information comes from: – Products from the National Hydrography Dataset (NHD) – NHDPlusV2 Medium Resolution river network flowlines, – NHD waterbodies (limited to lakes and reservoirs), – NHD Watershed Boundary Dataset (HUC12-level for the Conterminous United States (CONUS)) – NHD High Resolution waterbodies – HydroLAKES water bodies (lakes and reservoirs) – LAGOS-US lakes and reservoirs – EPA National Lakes Assessment (2007, 2012, 2017, and 2022) – The Reservoir Sedimentation Database (RESSED) Unique identifiers are used to facilitate joining to the original full datasets. For example, characteristics of NHD flowlines such as estimated average flow rate can be joined from the NHDPlusV2 dataset to a dam or power plant listed in HILARRI based on the ID field, “COMID”, that is common to both datasets. HILARRI only includes basic information about identifiers, location, and data quality or usage notes. It does not contain the attributes or time series data associated with these sites. The HILARRI dataset incorporates information from several datasets to facilitate more effective and accurate analysis of hydropower infrastructure and their associated waterbodies. For example, dams were checked against the most recent American Rivers Dam Removal Database to identify and flag facilities that may no longer exist. Additionally, dams that are listed multiple times in the NID are identified and flagged to avoid double-counting when analyzing and summarizing information. Other quality flags include certainty of operational hydropower (i.e., if one or more datasets indicates hydropower at a particular location), whether an associated water body is accurate or composed of multiple polygons, or whether there is a known issue with reported characteristics in one of the underlying datasets. These additional data flags are designed to increase confidence in data usage for individual to large-scale analyses.

13 HYDRO ENERGY↗

Integrated modeling for assessing climate change impacts on water resources and hydropower potential in the Himalayas

Regional hydroclimatic variability and change can affect water resources and hydropower generation. It is essential to assess hydropower potential under current and future climatic conditions to inform the design and operation of hydropower infrastructures. Here, we employ an integrated modeling framework to assess the impact of projected hydroclimatic conditions on water resource systems and hydropower generation. The integrated framework samples climate model outputs under different scenarios to force a hydrologic model and produces streamflow projections. The projected streamflows are inputs for the future hydropower potential assessment. We implement the framework in the central Himalayan river basin. Our results demonstrate substantial spatiotemporal variability in different water balance components (precipitation, evapotranspiration, and water yield) under current and future climatic conditions. For the Himalayan Tila river basin, the annual average energy production is expected to increase under future hydroclimatic conditions (up to 39% in Tila-2 hydropower project, suggested by ensemble mean). Furthermore, this increase in energy is driven mainly by the increased streamflow projections, particularly during the dry season and in the late century. Our results highlight the impacts of hydroclimatic variability in hydropower productions and are of practical use to provide decision-relevant information for designing and operating hydropower infrastructures. The integrated modeling framework presented here is region-specific; however, the approach is reproducible, and the overall insights are generalizable across the Himalayan region.

54 ENVIRONMENTAL SCIENCES↗

Assessing concurrent effects of climate change on hydropower supply, electricity demand, and greenhouse gas emissions in the Upper Yangtze River Basin of China

Hydropower importantly provides flexible low-carbon electricity, however, climate change will affect the hydropower system through altering hydrologic regimes while also affecting electricity demands for heating and cooling that hydropower resources serve. This study assesses the effect of climate change on hydropower and electricity demand in the Upper Yangtze River Basin (UYRB) in China on the regional net electric load and greenhouse gas (GHG) emissions. This is accomplished by using climate projections from five global climate models (GCMs) to simultaneously force (1) a physically-based hydrological model and a statistically-based hydropower model to estimate the future generating capacity of 21 large hydropower plants in the UYRB and (2) an empirical electricity demand model accounting for socioeconomic and climatic factors. Under climate change, the projected hydropower generation in the UYRB tends to increase in the 21st century but is far less than the increase in electricity demand, increasing the gap between demand and supply. Future increases in overall electricity demand are driven by GDP growth, but climate change will alter the distribution of the seasonal electricity demand. Climate warming decreases electricity demand for heating in winter and increases electricity demand for cooling in summer, but ultimately increases demand. Meanwhile, there is an increasing mismatch between electricity demand and hydropower supply associated with inter- and intra-annual variations, owing to the temporal climate change and increase in compound climate extremes (droughts and heatwaves). Finally, meeting the gap between supply and demand due to climate change is estimated to contribute 79.0–184.6 and 50.6–316.2 MMT CO 2e /yr of additional GHG emissions by the mid and end of 21st century, respectively.

13 HYDRO ENERGY↗

Barriers and Opportunities for U.S. Hydropower Industry Engagement in Brazil and Argentina

This Barriers and Opportunities for U.S. Hydropower Industry Engagement in Brazil and Argentina project seeks to enhance the understanding of hydropower resources, existing installations, and opportunities for U.S. company involvement in hydropower development in Brazil and Argentina. It covers conventional hydropower, pumped storage hydropower, run-of-river-hydropower, in-conduit generation, hydropower upgrades to existing facilities, and similar systems. This work recognizes that each of these countries, and even regions within the countries, have varied topography, weather, existing grid infrastructure, social, economic, and other factors, leading to relatively unique opportunities and challenges for hydropower development.

13 HYDRO ENERGY↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Hydropower Flexibility Framework (Final Technical Report)

The Hydropower Flexibility Framework (HFF) tool focuses on providing the hydropower community with an effective means of assessing optimized hydropower plant outcomes. This tool combines both site specific characteristics, which act to constrain plant operation, and the hydrologic and grid characteristics which drive hydropower plant operation. The hydropower community faces a confluence of factors which drive the importance of developing such a capability, including an aging hydropower fleet subject to a range of modernization opportunities, a large number of hydropower plant relicensing activities which may affect operational requirements, an electrical grid with increasing levels of variable resources which must be balanced to maintain grid stability, and climate change influencing riverine hydrologic patterns outside of design characteristics. With support from the hydropower community, the project team developed the HFF tool and demonstrated the tool through a series of Use Cases. This guidance was developed as a part of the larger HFF tool User’s Manual (see Appendix B), a resource designed to inform other users and to empower community uptake of the tool. The HFF tool, hosted at https://hfftool.com/, was developed with the support of the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO). EPRI is currently exploring alternatives to support the continued maintenance and functionally of the online tool.

13 HYDRO ENERGY↗

Basin-Wide Approaches to Hydropower Licensing

This presentation summarizes findings from a 2020 NREL technical report including the FERC relicensing process for non-federal hydropower projects, analyzes FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing. In the United States there are 1,043 active FERC-licensed hydroelectric projects with a total capacity of 56,097 MW. Of those, 647 with a total capacity of 21,870 MW have license expiration dates from 2018-2037. The expected workload in conjunction with the time, cost, and complexity associated with issuing a single new license has led to initiatives that aim to increase the efficiency of the relicensing process. Federal and state regulators and licensees in California, Maine, New York, and Wisconsin have begun to develop approaches to look at hydropower relicensing as part of a larger system - a river basin. These basin-wide approaches seek to coordinate different stages of the relicensing process for multiple projects at the same time. The goal of these basin-wide approaches is to increase the efficiency of the relicensing process and allow for a more comprehensive analysis of the cumulative impacts of the projects within the basin. These innovative approaches to relicensing could also reduce the workload for regulators and costs associated with relicensing. This presentation discusses some of the findings from the Basin-wide Approaches to Hydropower Relicensing: Case Studies and Considerations including a summary of the key considerations for the FERC relicensing process for non-federal hydropower projects, key findings from the analysis of FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing.

basin-wide↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Costs of mitigating the environmental impacts of hydropower projects in the United States

Developers are required to mitigate the environmental impacts of hydropower projects in the United States (U.S.) but there is very little accessible information on the associated costs. This work compiles and analyses a dataset of environmental impacts mitigation costs for 182 hydropower projects based on documents obtained from the U.S. Federal Energy Regulatory Commission (FERC). The analysis shows that environmental costs vary wildly across hydropower project classes and mitigation measures, even when normalized by plant capacity. Capital costs per kilowatt are generally higher for relicensed conventional hydropower plants, and lower for new and relicensed pumped storage hydropower plants, relative to other project classes. Smaller plants tend to spend a higher share of total project costs on mitigating environmental impacts than larger plants, and measures related to Aquatic Species, Project Operations, and Recreation have the highest capital cost per kilowatt. These findings mean that environmental costs could become a key decision variable for new hydropower developments in the U.S. due to the small scale of most of the remaining potential and the increasing stringency of environmental requirements. Therefore, technologies to reduce the environmental impacts and costs of hydropower would be important for future project developments.

54 ENVIRONMENTAL SCIENCES↗

Using energy storage systems to extend the life of hydropower plants

Despite their advantages, distributed energy resources (DERs) bring inherent uncertainty and variability into the landscape of modern power systems. As DER penetration grows, conventional generators like hydropower plants have to respond more often to arrest the imbalance in the net load. Hydropower turbines provide their best operational performance with minimal wear and tear when operating at regions of maximum efficiency. However, the current needs for hydropower plants require them to operate under varying load conditions and thus sub-optimal operating points leading to additional stress. To relieve the hydropower plants, this paper proposes a hybridization strategy where a hydropower unit is paired with an energy storage system (ESS) to increase operational flexibility and mitigate damage to the hydro plant. Models are developed to represent the operation of the hybrid system, quantify degradation, and assess economic benefits. Moreover, an innovative controller disaggregates the market dispatch signal into separate control setpoints for the ESS and hydropower unit. In case studies performed on a real-world hydropower facility, it was found that the ESS-based hybridization can extend the life of the hydropower plant by 5% on average. Notably, the economic benefits from reduced maintenance and deferred investment are estimated to be around $3.6 million.

13 HYDRO ENERGY↗

Evidence-based indicator approach to guide preliminary environmental impact assessments of hydropower development

Global expansion of hydropower resources has increased in recent years to meet growing energy demands and fill worldwide gaps in electricity supply. However, hydropower induces significant environmental impacts on river ecosystems - impacts that are addressed through environmental impact assessment (EIA) processes. The need for effective EIA processes is increasing as environmental regulations are either stressed in developing countries undertaking rapid expansion of hydropower capacity or time- and resource-intensive in developed countries. Part of the challenge in implementing EIAs lies in reaching a consensus among stakeholders regarding the most important environmental factors as the focus of impact studies. To help address this gap, we developed a weight-of-evidence approach (and toolkit) as a preliminary and coarse assessment of the most relevant impacts of hydropower on primary components of the river ecosystem, as identified using river function indicators. Through a science-based questionnaire and predictive model, users identify which environmental indicators may be impacted during hydropower development as well as those indicators that have the highest levels of uncertainty and require further investigation. Furthermore, an assessment tool visualizes inter-dependent indicator relationships, which help formulate hypotheses about causal relationships explored through environmental studies. We apply these tools to four existing hydropower projects and one hypothetical new hydropower project of varying sizes and environmental contexts. We observed consistencies between the output of our tools and the Federal Energy Regulatory Commission licensing process (inclusive of EIAs) but also important differences arising from holistic scientific evaluations (our toolkit) versus regulatory policies. The tools presented herein are aimed at increasing the efficiency of the EIA processes that engender environmental studies without loss of rigor or transparency of rationale necessary for understanding, considering, and mitigating the environmental consequences of hydropower.

54 ENVIRONMENTAL SCIENCES↗