Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “function unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Conducting Research on the International Space Station Using the EXPRESS Rack Facilities

Eight "Expedite the Processing of Experiments to Space Station" (EXPRESS) Rack facilities are located within the International Space Station (ISS) laboratories to provide standard resources and interfaces for the simultaneous and independent operation of multiple experiments within each rack. Each EXPRESS Rack provides eight Middeck Locker Equivalent locations and two drawer locations for powered experiment equipment, also referred to as sub-rack payloads. Payload developers may provide their own structure to occupy the equivalent volume of one, two, or four lockers as a single unit. Resources provided for each location include power (28 Vdc, 0-500 W), command and data handling (Ethernet, RS-422, 5 Vdc discrete, +/- 5 Vdc analog), video (NTSC/RS 170A), and air cooling (0-200 W). Each rack also provides water cooling (500 W) for two locations, one vacuum exhaust interface, and one gaseous nitrogen interface. Standard interfacing cables and hoses are provided on-orbit. One laptop computer is provided with each rack to control the rack and to accommodate payload application software. Four of the racks are equipped with the Active Rack Isolation System to reduce vibration between the ISS and the rack. EXPRESS Racks are operated by the Payload Operations Integration Center at Marshall Space Flight Center and the sub-rack experiments are operated remotely by the investigating organization. Payload Integration Managers serve as a focal to assist organizations developing payloads for an EXPRESS Rack. NASA provides EXPRESS Rack simulator software for payload developers to checkout payload command and data handling at the development site before integrating the payload with the EXPRESS Functional Checkout Unit for an end-to-end test before flight. EXPRESS Racks began supporting investigations onboard ISS on April 24, 2001 and will continue through the life of the ISS.

Thompson, Sean W.↗

Conducting Research on the International Space Station using the EXPRESS Rack Facilities

Eight "Expedite the Processing of Experiments to Space Station" (EXPRESS) Rack facilities are located within the International Space Station (ISS) laboratories to provide standard resources and interfaces for the simultaneous and independent operation of multiple experiments within each rack. Each EXPRESS Rack provides eight Middeck Locker Equivalent locations and two drawer locations for powered experiment equipment, also referred to as sub-rack payloads. Payload developers may provide their own structure to occupy the equivalent volume of one, two, or four lockers as a single unit. Resources provided for each location include power (28 Vdc, 0-500 W), command and data handling (Ethernet, RS-422, 5 Vdc discrete, +/- 5 Vdc analog), video (NTSC/RS 170A), and air cooling (0-200 W). Each rack also provides water cooling for two locations (500W ea.), one vacuum exhaust interface, and one gaseous nitrogen interface. Standard interfacing cables and hoses are provided on-orbit. One laptop computer is provided with each rack to control the rack and to accommodate payload application software. Four of the racks are equipped with the Active Rack Isolation System to reduce vibration between the ISS and the rack. EXPRESS Racks are operated by the Payload Operations Integration Center at Marshall Space Flight Center and the sub-rack experiments are operated remotely by the investigating organization. Payload Integration Managers serve as a focal to assist organizations developing payloads for an EXPRESS Rack. NASA provides EXPRESS Rack simulator software for payload developers to checkout payload command and data handling at the development site before integrating the payload with the EXPRESS Functional Checkout Unit for an end-to-end test before flight. EXPRESS Racks began supporting investigations onboard ISS on April 24, 2001 and will continue through the life of the ISS.

Thompson, Sean W.↗

Short Exploration Extravehicular Mobility Unit Testing Setup: Evaluation Under Realistic Pressure and Thermal Conditions

The purpose of Short Exploration Extravehicular Mobility Unit (SxEMU) thermal vacuum testing was to verify the functionality of the Design Verification Testing (DVT) prototype xEMU (SxEMU for this test) at vacuum pressures and extreme space and lunar surface temperature conditions. The SxEMU Thermal Vacuum Test was the culmination of the DVT xEMU project. This paper’s focus is on the pre-Extravehicular Activity (EVA) test setup, and general performance of the SxEMU Portable Life Support Subsystem (xPLSS), with focus on the performance of the Primary Oxygen Assembly (POA) and Secondary Oxygen Assembly (SOA), including Secondary Oxygen Regulator (SOR) takeover and the POA and SOA low-setpoint change inhibit. The initial pre-EVA test preparation included recharging the batteries and replenishing consumables, including test-system water, oxygen assemblies (with gaseous nitrogen), and the integrated thermal loops, including the Feedwater Supply Assemblies. xPLSS functionality testing included carbon dioxide (CO2) removal via the Rapid Cycle Amine swingbed system, thermal loop temperature control, and monitoring of suit ventilation loop pressure, temperature, and CO2 percentages. Testing evaluated automatic takeover of suit pressure control by the SOR after the primary oxygen supply is depleted. The Primary Oxygen Regulator and SOR low-setpoint change inhibit function prevents the crewmember from inadvertently setting the primary regulator to a low pressure setpoint during an EVA.

xPLSS↗

Near Earth Asteroid Scout Solar Sail Engineering Development Unit Test Suite

The Near Earth Asteroid (NEA) Scout project is a 6U reconnaissance mission to investigate a near Earth asteroid utilizing an 86m(sub 2) solar sail as the primary propulsion system. This will be the largest solar sail NASA has launched to date. NEA Scout is currently manifested on the maiden voyage of the Space Launch System in 2018. In development of the solar sail subsystem, design challenges were identified and investigated for packaging within a 6U form factor and deployment in cis-lunar space. Analysis was able to capture understanding of thermal, stress, and dynamics of the stowed system as well as mature an integrated sail membrane model for deployed flight dynamics. Full scale system testing on the ground is the optimal way to demonstrate system robustness, repeatability, and overall performance on a compressed flight schedule. To physically test the system, the team developed a flight sized engineering development unit with design features as close to flight as possible. The test suite included ascent vent, random vibration, functional deployments, thermal vacuum, and full sail deployments. All of these tests contributed towards development of the final flight unit. This paper will address several of the design challenges and lessons learned from the NEA Scout solar sail subsystem engineering development unit. Testing on the component level all the way to the integrated subsystem level. From optical properties of the sail material to fold and spooling the single sail, the team has developed a robust deployment system for the solar sail. The team completed several deployments of the sail system in preparation for flight at half scale (4m) and full scale (6.8m): boom only, half scale sail deployment, and full scale sail deployment. This paper will also address expected and received test results from ascent vent, random vibration, and deployment tests.

Lockett, Tiffany Russell↗

Plated wire memory subsystem

The design, construction, and test history of a 4096 word by 18 bit random access NDRO Plated Wire Memory for use in conjunction with a spacecraft input/output and central processing unit is reported. A technical and functional description is given along with diagrams illustrating layout and systems operation. Test data is shown on the procedures and results of system level and memory stack testing, and hybrid circuit screening. A comparison of the most significant physical and performance characteristics of the memory unit versus the specified requirements is also included.

Carpenter, K. H.↗

Thematic mapper flight model preshipment review data package. Volume 4: Appendix. Part E: Electronics module data

Tests to verify the as-designed performance of all circuits within the thematic mapper electronics module unit are described. Specifically, the tests involved the evaluation of the scan line corrector driver, shutter drivers function, cal lamp controller function, post amplifier function, command decoder verification unit, and the temperature and actuator controllers function.

Source record↗

International Space Station (ISS) Bacterial Filter Elements (BFEs): Filter Efficiency and Pressure Testing of Returned Units

The air revitalization system aboard the International Space Station (ISS) provides the vital function of maintaining a clean cabin environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of sedimentation due to the microgravity environment in Low Earth Orbit (LEO). The ISS Environmental Control and Life Support (ECLS) system architecture in the U.S. Segment uses a distributed particulate filtration approach consisting of traditional High-Efficiency Particulate Adsorption (HEPA) media filters deployed at multiple locations in each U.S. Segment module; these filters are referred to as Bacterial Filter Elements, or BFEs. These filters see a replacement interval, as part of maintenance, of 2-5 years dependent on location in the ISS. In this work, we present particulate removal efficiency, pressure drop, and leak test results for a sample set of 8 BFEs returned from the ISS after filter replacement. The results can potentially be utilized by the ISS Program to ascertain whether the present replacement interval can be maintained or extended to balance the on-ground filter inventory with extension of the lifetime of ISS beyond 2024. These results can also provide meaningful guidance for particulate filter designs under consideration for future deep space exploration missions.

Filtration↗

A programmable heater control circuit for spacecraft

Spacecraft thermal control is accomplished for many components through use of multilayer insulation systems, electrical heaters, and radiator systems. The heaters are commanded to maintain component temperatures within design specifications. The programmable heater control circuit (PHCC) was designed to obtain an effective and efficient means of spacecraft thermal control. The hybrid circuit provides use of control instrumentation as temperature data, available to the spacecraft central data system, reprogramming capability of the local microprocessor during the spacecraft's mission, and the elimination of significant spacecraft wiring. The hybrid integrated circuit has a temperature sensing and conditioning circuit, a microprocessor, and a heater power and control circuit. The device is miniature and housed in a volume which allows physical integration with the component to be controlled. Applications might include alternate battery-powered logic-circuit configurations. A prototype unit with appropriate physical and functional interfaces was procured for testing. The physical functionality and the feasibility of fabrication of the hybrid integrated circuit were successfully verified. The remaining work to develop a flight-qualified device includes fabrication and testing of a Mil-certified part. An option for completing the PHCC flight qualification testing is to enter into a joint venture with industry.

Nguyen, D. D.↗

Shake test of rotor test apparatus in the 40- by 80-foot wind tunnel

A shake test was conducted to determine the dynamic characteristics of a rotor test apparatus on strut systems. The rotor-off hub transfer function (acceleration per unit force as a function of frequency) was measured in the longitudinal and lateral directions, using a combination of broadband and discrete frequency excitation techniques. The dynamic data is summarized for the configurations tested, giving the following properties for each mode identified: the natural frequency, the hub response at resonance, and the fixed system damping. The complete transfer functions are presented, and the detailed test results are included as an appendix. Data analysis techniques developed to obtain on-line measurements of the system modal properties, including the damping coefficient and the damping ratio are discussed.

Johnson, W.↗

Increasing software testability with standard access and control interfaces

Testing is the most common method of determining whether a software system satisfies its requirements. Traditionally, testing starts with the detailed examination of individual functions or methods, progresses through the integration of functions or methods into subsystems, and ends with testing the functionality and behavior of the completely integrated system. At each stage of testing, the amount of functionality and behavior of the artifact being tested is increasingly limited. One reason for this is that it becomes impossible to test all paths through the system within a reasonable amount of time. However, another reason for this progressive decrease of test coverage has to do with increasingly limited control of and visibility into the state of the artifact being tested. During unit test, it is rather simple to control the inputs of individual functions or methods or view their internal state - modem development environments provide adequate facilities for doing so. However, these facilities do not scale up to the testing of partially or completely integrated systems. Control of and visibility into the system's state is then limited to the input and output facilities provided by the software itself as well as the hardware on which the software is hosted during the test. These facilities are usually insufficient to precisely control the state of individual components or sets of components of the system; they are also inadequate to the task of displaying on demand the state of specific components. We describe an approach to improving the testability of complex software systems with software constructs modeled after the hardware JTAG bus, used to provide visibility and controllability in testing digital circuits.

Tamir, Yuval↗

Data management system CIU and DIU. Appendix A: CIU and DIU schematics

The Computer Interface Unit (CIU) and the Data Interface Unit (DIU) of the Data Management System (DMS) were described as to their functional location, purpose and function. This describes the CIU and DIU at the unit level illustrating their interface thru the Data Bus (DBUS) and to other DMS units. All unit level interfaces are defined as to function and characteristics. The controls, indicators, test points and connectors are listed and function, location and application are described for each. The mechanical configuration is defined and illustrated to provide card and component location for modification or repair purposes. Unique disassembly and assembly requirements are outlined where applicable. A unit internal functional block diagram level description is provided.

Source record↗

Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained engineering team. The engineers on the team are capable of functioning in two to three engineering disciplines which allows highly efficient interdisciplinary engineering collaboration. NASA Ames is actively proposing mission concepts to use the COTSAT platform to accomplish science. If the COTSAT team validates this approach, it will allow the possibility for remote sensing missions to produce a high science yield for minimal cost and reduced schedule. Another aim of this approach is to yield an accelerated pathway from a Phase A study to mission launch. Leaders in the aerospace industry have shown interest in this methodology. Several visits and tours have been given in the lab. Although the concept of low-cost development is initially met with skepticism from some within the prohibitive aerospace industry, the project's efforts have been highly praised for the accomplishments met within a limited time and budget. Overall the development has progressed tremendously well and the team is answering critical questions for current and future low-cost small satellite developments. COTSAT subsystems are not limited to a specific weight class and could be adapted to produce smaller platforms and to fit various launch vehicles.

Spremo, Stevan↗

Self testing and repairing computer - A concept

STAR computer has five redundant modular function units, fixed store, arithmetic, memory, input, and output. Each unit is connected to a diagnostic control unit, each is coded for error detection and error correction. Separation into function units permits assembly of many different systems from the set of units.

Avizienis, A. A.↗

Application of low-power, high-rate PCM telemetry in a helicopter instrumentation system

The use of low-power, high-rate pulse code modulation (PCM) in a helicopter instrumentation system is examined. A Helicopter Instrumentation and Recording System (HIARS) was developed to obtain main rotor blade measurements and fuselage performance measurements. The HIARS consists of a low-power PCM telemeter, a digital PCM system, an optical rotor position sensor, and a PCM decommutation unit; the components and functions of these subsystems are described. Flight tests were conducted to evaluate the ability of the HIARS to measure aircraft parameters. The test data reveal that the PCM telemetry is applicable to helicopter instrumentation systems.

Thomas, Mitchel E.↗

Design and testing of the U.S. Space Station Freedom primary propulsion system

The primary propulsion system (PPS) for the Space Station Freedom is discussed in terms of salient design characteristics and key testing procedures. The rocket engine modules contain reboost and attitude control thrusters, and their designs are illustrated showing the mounting structures, thruster solenoid valves, and thrust chambers. The propellant tank assembly for storing gaseous N pressurant and hydrazine propellant is described as are the system avionics, thruster solenoid valves, and latching isolation valves. PPS testing conducted on the development systems includes the use of a propulsion-module development unit, a development test article, and system qualification testing. Specific test articles include functional heaters, mass/thermal simulated components, flight-quality structures, and software control operations.

Morano, Joseph S.↗

Pulsed Plasma Thruster (PPT) Technology: Earth Observing-1 PPT Operational and Advanced Components Being Developed

In 2002 the pulsed plasma thruster (PPT) mounted on the Earth Observing-1 spacecraft was operated successfully in orbit. The two-axis thruster system is fully incorporated in the attitude determination and control system and is being used to automatically counteract disturbances in the pitch axis of the spacecraft. The first tests conducted in space demonstrated the full range of PPT operation, followed by calibration of control torques from the PPT in the attitude control system. Then the spacecraft was placed in PPT control mode. To date, it has operated for about 30 hr. The PPT successfully controlled pitch momentum during wheel de-spin, solar array acceleration and deceleration during array rewind, and environmental torques in nominal operating conditions. Images collected with the Advanced Landsat Imager during PPT operation have demonstrated that there was no degradation in comparison to full momentum wheel control. In addition, other experiments have been performed to interrogate the effects of PPT operation on communication packages and light reflection from spacecraft surfaces. Future experiments will investigate the possibility of orbit-raising maneuvers, spacecraft roll, and concurrent operation with the Hyperion imager. Future applications envisioned for pulsed plasma thrusters include longer life, higher precision, multiaxis thruster configurations for three-axis attitude control systems or high-precision, formationflying systems. Advanced components, such as a "dry" mica-foil capacitor, a wear-resistant spark plug, and a multichannel power processing unit have been developed under contract with Unison Industries, General Dynamics, and C.U. Aerospace. Over the last year, evaluation tests have been conducted to determine power processing unit efficiency, atmospheric functionality, vacuum functionality, thruster performance evaluation, thermal performance, and component life.

Pencil, Eric J.↗

NASA Glenn SmallSat/CubeSat Activities and Capabilities

This presentation provides an overview of recent activities at NASA Glenn Research Center (GRC) in the development and performance test characterization of electric propulsion subsystems intended for small satellite (SmallSat) and cubesat missions. The status and recent progress of several on-going development activities related to smallsat/cubesat missions at GRC will be discussed. These projects and activities include Sub-Kilowatt Electric Propulsion (SKEP), iodine compatibility testing of Hall thruster components, performance testing of a cold gas propulsion system for BioSentinel, and performance testing of the Massachusetts Institute of Technology electrospray propulsion units. The functions and capabilities of GRC's Electric Propulsion Systems Branch will be covered. These capabilities are available to provide propulsion subsystem manufacturers independent, third-party assessments of their technologies for use on future NASA missions. A plan to generate standards for the development of smallsat/cubesat propulsion systems for Class D missions has been initiated and will be outlined in this presentation.

Pencil, Eric↗

Lessons Learned From the EMU Fire

In April 1980, a Space Shuttle Extravehicular Mobility Unit (EMU) was destroyed in a flash fire during a functional test in the Johnson Space Center's crew systems laboratory. During this lecture, Mr. Nowetner discussed what happened to cause this failure, what safety message resulted from it, lessons learned from these mistakes, and how to leverage earned knowledge.

Cinda Chullen↗