Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “function unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

Experimenting Galileo on Board the International Space Station

The SCaN Testbed is an advanced integrated communications system and laboratory facility installed on the International Space Station (ISS) in 2012. The testbed incorporates a set of new generation of Software Defined Radio (SDR) technologies intended to allow researchers to develop, test, and demonstrate new communications, networking, and navigation capabilities in the actual environment of space. Qascom, in cooperation with ESA and NASA, is designing a Software Defined Radio GalileoGPS Receiver capable to provide accurate positioning and timing to be installed on the ISS SCaN Testbed. The GalileoGPS waveform will be operated in the JPL SDR that is constituted by several hardware components that can be used for experimentations in L-Band and S-Band. The JPL SDR includes an L-Band Dorne Margolin antenna mounted onto a choke ring. The antenna is connected to a radio front end capable to provide one bit samples for the three GNSS frequencies (L1, L2 and L5) at 38 MHz, exploiting the subharmonic sampling. The baseband processing is then performed by an ATMEL AT697 processor (100 MIPS) and two Virtex 2 FPGAs. The JPL SDR supports the STRS (Space Telecommunications Radio System) that provides common waveform software interfaces, methods of instantiation, operation, and testing among different compliant hardware and software products. The standard foresees the development of applications that are modular, portable, reconfigurable, and reusable. The developed waveform uses the STRS infrastructure-provided application program interfaces (APIs) and services to load, verify, execute, change parameters, terminate, or unload an application. The project is divided in three main phases. 1)Design and Development of the GalileoGPS waveform for the SCaN Testbed starting from Qascom existing GNSS SDR receiver. The baseline design is limited to the implementation of the single frequency Galileo and GPS L1E1 receiver even if as part of the activity it will be to assess the feasibility of a dual frequency implementation (L1E1+L5E5a) in the same SDR platform.2)Qualification and test the GalileoGPS waveform using ground systems available at the NASA Glenn Research Center. Experimenters can have access to two SCaN Testbed ground based systems for development and verification: the Experimenter Development System (EDS) that is intended to provide initial opportunity for software testing and basic functional validation and the Ground Integration Unit (GIU) that is a high fidelity version of the SCaN Testbed flight system and is therefore used for more controlled final development testing and verification testing.3)Perform in-orbit validation and experimentation: The experimentation phase will consists on the collection of raw measurements (pseudorange, Carrier phase, CN0) in space, assessment on the quality of the measurements and the receiver performances in terms of signal acquisition, tracking, etc. Finally computation of positioning in space (Position, Velocity and time) and assessment of its performance.(Complete abstract in attached document).

GPS↗

Experimenting Galileo on Board the International Space Station

The SCaN Testbed is an advanced integrated communications system and laboratory facility installed on the International Space Station (ISS) in 2012. The testbed incorporates a set of new generation of Software Defined Radio (SDR) technologies intended to allow researchers to develop, test, and demonstrate new communications, networking, and navigation capabilities in the actual environment of space. Qascom, in cooperation with ESA and NASA, is designing a Software Defined Radio GalileoGPS Receiver capable to provide accurate positioning and timing to be installed on the ISS SCaN Testbed. The GalileoGPS waveform will be operated in the JPL SDR that is constituted by several hardware components that can be used for experimentations in L-Band and S-Band. The JPL SDR includes an L-Band Dorne Margolin antenna mounted onto a choke ring. The antenna is connected to a radio front end capable to provide one bit samples for the three GNSS frequencies (L1, L2 and L5) at 38 MHz, exploiting the subharmonic sampling. The baseband processing is then performed by an ATMEL AT697 processor (100 MIPS) and two Virtex 2 FPGAs. The JPL SDR supports the STRS (Space Telecommunications Radio System) that provides common waveform software interfaces, methods of instantiation, operation, and testing among different compliant hardware and software products. The standard foresees the development of applications that are modular, portable, reconfigurable, and reusable. The developed waveform uses the STRS infrastructure-provided application program interfaces (APIs) and services to load, verify, execute, change parameters, terminate, or unload an application. The project is divided in three main phases. 1)Design and Development of the GalileoGPS waveform for the SCaN Testbed starting from Qascom existing GNSS SDR receiver. The baseline design is limited to the implementation of the single frequency Galileo and GPS L1E1 receiver even if as part of the activity it will be to assess the feasibility of a dual frequency implementation (L1E1+L5E5a) in the same SDR platform.2)Qualification and test the GalileoGPS waveform using ground systems available at the NASA Glenn Research Center. Experimenters can have access to two SCaN Testbed ground based systems for development and verification: the Experimenter Development System (EDS) that is intended to provide initial opportunity for software testing and basic functional validation and the Ground Integration Unit (GIU) that is a high fidelity version of the SCaN Testbed flight system and is therefore used for more controlled final development testing and verification testing.3)Perform in-orbit validation and experimentation: The experimentation phase will consists on the collection of raw measurements (pseudorange, Carrier phase, CN0) in space, assessment on the quality of the measurements and the receiver performances in terms of signal acquisition, tracking, etc. Finally computation of positioning in space (Position, Velocity and time) and assessment of its performance.(Complete abstract in attached document).

Galileo↗

Suit Port Aft Bulkhead Mockup 2008 Test Results

The Lunar Electric Rover (LER), formerly called the Small Pressurized Rover (SPR), is currently being carried as an integral part of the current Lunar Surface Architectures under consideration in the Constellation program. One element of the LER is the suit port, the means by which the crew performs Extravehicular Activities (EVAs). Two suit port deliverables were produced in fiscal year 2008: an aft bulkhead mockup for functional integrated testing with the 1-G LER mockup and a functional and pressurizable Engineering Unit (EU). This paper focuses on the aft bulkhead mockup test results from Desert Research and Technology Studies (D-RATS) October 2008 testing at Black Point Lava Flow (BPLF), Arizona. Refer to 39th International Conference on Environmental Systems (ICES) for test results of the EU. The suit port aft bulkhead mockup was integrated with the mockup of the LER cabin and chassis. It is located on the aft bulkhead of the LER cabin structure and includes hatches, a locking mechanism, seals, interior and exterior suit don/doff aids, and exterior platforms to accommodate different crewmember heights. A lightweight mockup of the Mark III suit was tested with the suit port aft bulkhead mockup. There are several limitations to the suit port and mockup suits, and results of the suit port evaluation are presented and interpreted within the context of the limitations.

Romig, Barbara A.↗

NOR Flash Memory Scrubbing Application for Boot File Preservation of NASA’s Descent and Landing Computer (DLC)

Progress on NASA’s Safe and Precise Landing Integrated Capabilities Evolution (SPLICE) project continues, specifically with this development of the Descent and Landing Computer (DLC). One of the DLC’s primary contributions as a SPLICE technology is its implementation of algorithms and operation of sensors to autonomously guide a spacecraft in performing more precise and safer landings on celestial bodies such as the Moon and Mars [1]. The second iteration of the DLC is known as the Engineering Test Unit (ETU) and one of its desired functionalities is the ability to preserve the fidelity of the system’s boot file through the use of memory scrubbing [2]. The ETU has two primary boards, one for housing a Multi-Processor System on a Chip (MPSoC) and the other for housing a Xilinx Kintex Ultrascale FPGA*. To emulate a memory scrubbing function implemented on the ETU’s FPGA board, the design and testing of a software application was performed on a Xilinx KCU105 FPGA evaluation board. The memory scrubbing application had to meet certain key criteria such as (1) properly utilize with the flash memory’s Serial Peripheral Interface (SPI) to read, write, and erase flash memory properly, (2) be able to detect arbitrarily large or small amounts of bit-errors, (3) be able to correct all detected errors, and (4) perform memory scrubbing indefinitely and autonomously. A prototype implementation was constructed and tested, demonstrating successful detection and correction of bit errors in multiple configurations. In the form of burst errors or singular bit flips, and in amounts of errors ranging from one to fifteen (per 256 Bytes), the application was successful in preserving memory fidelity.

Flash memory↗

Acceptable testing of VLSI components which contain error correctors

If a VLSI chip is partitioned into functional units (FU's) and redundant FU's are added, error correcting codes may be employed to increase the yield and/or reliability of the chip. Acceptable testing is defined to be testing the chip with the error corrector functioning, thus obtaining the maximum increase in yield afforded by the error correction. The acceptable testing theorem shows that the use of coding and error correction in conjunction with acceptable testing can significantly increase the yield of VLSI chips without seriously compromising their reliability.

Cliff, R. A.↗

Thoroughly testing and integrating hundreds of Pull Requests per month: ROOT’s new Cost-efficient and Feature Rich GitHub-based CI

ROOT is an open source framework, freely available on GitHub, at the heart of data acquisition, processing and analysis of HE(N)P experiments, and beyond. It is developed collaboratively: contributions are not authored only by ROOT team members, but also by the user community at large: developers and scientists from universities, labs as well as the private sector. More than 1500 GitHub Pull Requests are merged on average per year. It is in this context that code integration acquires a primary role. The review of code contributions isn’t enough: not only they need to be thoroughly reviewed, they also need to be thoroughly tested through a powerful CI infrastructure on several different platforms to comply with the high code quality standards of the project. Since the end of 2023, ROOT moved its continuous integration system from Jenkins to GitHub Actions. In this contribution, we characterise the transition to the GitHub CI, focussing on our strategy, its implementation and the lessons learned, as well as the advantages the new system offers with respect to the previous one. Particular emphasis will be given to the evaluation of the cost-benefit ratio for Jenkins and GitHub Actions for the ROOT project. We also describe how we manage to run in less than one hour thousands of unit, integration, functional and end-to-end tests on different flavours of Windows, four versions of macOS, as well as about ten of the most used Linux distributions, taking advantage of the CERN computing infrastructure.

Piparo, Danilo [CERN]↗

JPL control/structure interaction test bed real-time control computer architecture

The Control/Structure Interaction Program is a technology development program for spacecraft that exhibit interactions between the control system and structural dynamics. The program objectives include development and verification of new design concepts - such as active structure - and new tools - such as combined structure and control optimization algorithm - and their verification in ground and possibly flight test. A focus mission spacecraft was designed based upon a space interferometer and is the basis for design of the ground test article. The ground test bed objectives include verification of the spacecraft design concepts, the active structure elements and certain design tools such as the new combined structures and controls optimization tool. In anticipation of CSI technology flight experiments, the test bed control electronics must emulate the computation capacity and control architectures of space qualifiable systems as well as the command and control networks that will be used to connect investigators with the flight experiment hardware. The Test Bed facility electronics were functionally partitioned into three units: a laboratory data acquisition system for structural parameter identification and performance verification; an experiment supervisory computer to oversee the experiment, monitor the environmental parameters and perform data logging; and a multilevel real-time control computing system. The design of the Test Bed electronics is presented along with hardware and software component descriptions. The system should break new ground in experimental control electronics and is of interest to anyone working in the verification of control concepts for large structures.

Briggs, Hugh C.↗

Production and Performance of High Sulfur Concentration Waste Glasses (FY21)

In FY21 Savannah River National Laboratory (SRNL) was tasked to investigate the practical aspects of low activity waste (LAW) glass production with high sulfur loading for the Office of River Protection (ORP). Relationships between sulfur solubility, retention, and melter resonance need to be evaluated to refine waste loading limits and the super saturated melting (triple melt, grind, and wash) methodology. The impact of high sulfur concentration on durability and phase stability (crystallization and liquid-liquid immiscibility) during slow cooling also needs to be further evaluated. To accomplish this, SRNL proposed scaled melter testing using simulants with matched physicochemical properties to melter feed, as opposed to laboratory reagents. This type of testing is expected to validate applicability to design parameters and functional criteria expected during unit operations. This work was expected to commence in FY21, with the first melter tests being performed near the end of the FY. However, reduced access to Savannah River Site and personnel availability during the COVID-19 pandemic significantly reduced the amount of time and resources available to perform the task. This report documents the experimental plan and progress towards this task. The following is a summarized list of scheduled testing that will be performed on feed, condensate, cold cap and glass: 1) Melter runs; 2) Product consistency test (PCT); 3) Inductively coupled plasma optical emission spectroscopy (ICP-OES); and 4) Optical (OM) and scanning electron microscopy (SEM).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tethered satellite system dynamics and control review panel and related activities, phase 3

Two major tests of the Tethered Satellite System (TSS) engineering and flight units were conducted to demonstrate the functionality of the hardware and software. Deficiencies in the hardware/software integration tests (HSIT) led to a recommendation for more testing to be performed. Selected problem areas of tether dynamics were analyzed, including verification of the severity of skip rope oscillations, verification or comparison runs to explore dynamic phenomena observed in other simulations, and data generation runs to explore the performance of the time domain and frequency domain skip rope observers.

Source record↗

HDU Deep Space Habitat (DSH) Overview

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project Deep Space Habitat (DSH) analog that will be field-tested during the 2011 Desert Research and Technologies Studies (D-RATS) field tests. The HDU project is a technology pull project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU Pressurized Excursion Module (PEM) that was field tested in the 2010 D-RATS, adding habitation functionality to the prototype unit. The 2010 configuration of the HDU-PEM consisted of a lunar surface laboratory module that was used to bring over 20 habitation-related technologies together in a single platform that could be tested as an advanced habitation analog in the context of mission architectures and surface operations. The 2011 HDU-DSH configuration will build upon the PEM work, and emphasize validity of crew operations (habitation and living, etc), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The HDU project consists of a multi-center team brought together in a skunkworks approach to quickly build and validate hardware in analog environments. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 analog field test will include Multi Mission Space Exploration Vehicles (MMSEV) and the DSH among other demonstration elements to be brought together in a mission architecture context. This paper will describe overall objectives, various habitat configurations, strategic plan, and technology integration as it pertains to the 2011 field tests.

Kennedy, Kriss J.↗

Smart command recognizer (SCR) - For development, test, and implementation of speech commands

The SCR, a rapid prototyping system for the development, testing, and implementation of speech commands in a flight simulator or test aircraft, is described. A single unit performs all functions needed during these three phases of system development, while the use of common software and speech command data structure files greatly reduces the preparation time for successive development phases. As a smart peripheral to a simulation or flight host computer, the SCR interprets the pilot's spoken input and passes command codes to the simulation or flight computer.

Simpson, Carol A.↗

Simulator for heterogeneous dataflow architectures

A new simulator is developed to simulate the execution of an algorithm graph in accordance with the Algorithm to Architecture Mapping Model (ATAMM) rules. ATAMM is a Petri Net model which describes the periodic execution of large-grained, data-independent dataflow graphs and which provides predictable steady state time-optimized performance. This simulator extends the ATAMM simulation capability from a heterogenous set of resources, or functional units, to a more general heterogenous architecture. Simulation test cases show that the simulator accurately executes the ATAMM rules for both a heterogenous architecture and a homogenous architecture, which is the special case for only one processor type. The simulator forms one tool in an ATAMM Integrated Environment which contains other tools for graph entry, graph modification for performance optimization, and playback of simulations for analysis.

Malekpour, Mahyar R.↗

Autonomous Airborne Refueling Demonstration: Phase I Flight-Test Results

The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small.

Dibley, Ryan P.↗

Autonomous Airborne Refueling Demonstration, Phase I Flight-Test Results

The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the NASA Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small

Dibley, Ryan P.↗

Conducting Research on the International Space Station Using the EXPRESS Rack Facilities

Conducting Research on the International Space Station using the EXPRESS Rack Facilities. Sean W. Thompson and Robert E. Lake. NASA Marshall Space Flight Center, Huntsville, AL, USA. Eight "Expedite the Processing of Experiments to Space Station" (EXPRESS) Rack facilities are located within the International Space Station (ISS) laboratories to provide standard resources and interfaces for the simultaneous and independent operation of multiple experiments within each rack. Each EXPRESS Rack provides eight Middeck Locker Equivalent locations and two drawer locations for powered experiment equipment, also referred to as sub-rack payloads. Payload developers may provide their own structure to occupy the equivalent volume of one, two, or four lockers as a single unit. Resources provided for each location include power (28 Vdc, 0-500 W), command and data handling (Ethernet, RS-422, 5 Vdc discrete, +/- 5 Vdc analog), video (NTSC/RS 170A), and air cooling (0-200 W). Each rack also provides water cooling (500 W) for two locations, one vacuum exhaust interface, and one gaseous nitrogen interface. Standard interfacing cables and hoses are provided on-orbit. One laptop computer is provided with each rack to control the rack and to accommodate payload application software. Four of the racks are equipped with the Active Rack Isolation System to reduce vibration between the ISS and the rack. EXPRESS Racks are operated by the Payload Operations Integration Center at Marshall Space Flight Center and the sub-rack experiments are operated remotely by the investigating organization. Payload Integration Managers serve as a focal to assist organizations developing payloads for an EXPRESS Rack. NASA provides EXPRESS Rack simulator software for payload developers to checkout payload command and data handling at the development site before integrating the payload with the EXPRESS Functional Checkout Unit for an end-to-end test before flight. EXPRESS Racks began supporting investigations onboard ISS on April 24, 2001 and will continue through the life of the ISS.

Thompson, Sean W.↗