Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “forecast scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network↗

Further studies of methods for reducing community noise around airports

A simplified method of analysis was used in which all flights at a 'simulated' airport were assumed to operate from one runway in a single direction. For this simulated airport, contours of noise exposure forecast were obtained and evaluated. A flight schedule of the simulated airport which is representative of the 23 major U. S. airports was used. The effect of banning night-time operations by four-engine, narrow-body aircraft in combination with other noise reduction options was studied. The reductions in noise which would occur of two- and three-engine, narrow-body aircraft equipped with a refanned engine was examined. A detailed comparison of the effects of engine cutback on takeoff versus the effects of retrofitting quiet nacelles for narrow-body aircraft was also examined. A method of presenting the effects of various noise reduction options was treated.

Petersen, R. H.↗

Estimating the cost of production stoppage

Estimation model considers learning curve quantities, and time of break to forecast losses due to break in production schedule. Major parameters capable of predicting costs are number of units made prior to production sequence, length of production break, and slope of learning curve produced prior to break.

Delionback, L. M.↗

Ground Delay Program Analytics with Behavioral Cloning and Inverse Reinforcement Learning

We used historical data to build two types of model that predict Ground Delay Program implementation decisions and also produce insights into how and why those decisions are made. More specifically, we built behavioral cloning and inverse reinforcement learning models that predict hourly Ground Delay Program implementation at Newark Liberty International and San Francisco International airports. Data available to the models include actual and scheduled air traffic metrics and observed and forecasted weather conditions. We found that the random forest behavioral cloning models we developed are substantially better at predicting hourly Ground Delay Program implementation for these airports than the inverse reinforcement learning models we developed. However, all of the models struggle to predict the initialization and cancellation of Ground Delay Programs. We also investigated the structure of the models in order to gain insights into Ground Delay Program implementation decision making. Notably, characteristics of both types of model suggest that GDP implementation decisions are more tactical than strategic: they are made primarily based on conditions now or conditions anticipated in only the next couple of hours.

Bloem, Michael↗

Occupant Preference-Aware Load Scheduling for Resilient Communities

The load scheduling of resilient communities in the islanded mode is subject to many uncertainties such as weather forecast errors and occupant behavior stochasticity. To date, it remains unclear how occupant preferences affect the effectiveness of the load scheduling of resilient communities. This paper proposes an occupant thermal preference-aware load scheduler for resilient communities operating in the islanded mode. First, key resilience indicators are selected to quantify its impacts on the load scheduling of a resilient community. A deterministic model predictive control-based load scheduling framework is adopted as the baseline. Then, a chance-constrained controller is proposed to address the occupant-induced uncertainty in room temperature setpoints. Finally, the chance-constrained controller is compared with the deterministic controller on a virtual community testbed based on a real-world net-zero energy community in Florida, U.S. Results have shown that the proposed chance-constrained controller performs better in terms of serving occupants’ thermal preference and the required battery sizes compared to the deterministic controller with the presence of the assumed stochastic occupant behavior. This work indicates that it is necessary to consider the stochasticity of the occupant behavior when designing optimal load schedulers for resilient communities.

Wang, Jing↗

Ice storage model-predictive control in an office building with PV: scenario, error and sensitivity analysis

Thermal energy storage (TES) can enable more building-sited renewable electricity generation and lower utility bill costs for buildings owners and occupants, especially when there are high demand and variable time-of-use (TOU) charges. A model predictive control (MPC) strategy can offer additional savings over a schedule-based control with added complexity and reliance on forecasts. Here, this study examines savings for medium office buildings with chiller plants in three locations with building-installed solar photovoltaics (PV) to understand the impact of MPC. Control setpoints are fixed by a schedule-based control or optimized by nonlinear MPC. These control setpoints are actuated within EnergyPlus building models to simulate the utility cost of the chiller plant. NLP solutions can be unstable or unrealistic, but our results show that by regularizing the NLP, the solutions can be reasonably followed by the building model. MPC models make simplifications that lead to errors once the controller is participating in and changing the operation of the building. These errors average 9 % across the cases, showing that the most important parts of the system are represented. The no-thermal load costs are computed to show that the optimization can in some cases achieve both the minimum TOU and minimum monthly demand costs by demand management while reducing TOU energy costs by energy arbitrage. The MPC saves 35–66 % in the annual chiller plant operating costs, which is an additional savings above the schedule by 1–33 %. PV and TES are complementary and mostly independent, but a load with PV often results in better performance for the schedule. Our case study and sensitivity analysis show the importance of modeling and optimization for complex rates, but also the circumstances wherein a simpler strategy achieves the same performance with less potential for error.

14 SOLAR ENERGY↗

Assessing the Impact of Advanced Satellite Observations in the NASA GEOS-5 Forecast System Using the Adjoint Method

The adjoint of a data assimilation system provides a flexible and efficient tool for estimating observation impacts on short-range weather forecasts. The impacts of any or all observations can be estimated simultaneously based on a single execution of the adjoint system. The results can be easily aggregated according to data type, location, channel, etc., making this technique especially attractive for examining the impacts of new hyper-spectral satellite instruments and for conducting regular, even near-real time, monitoring of the entire observing system. In this talk, we present results from the adjoint-based observation impact monitoring tool in NASA's GEOS-5 global atmospheric data assimilation and forecast system. The tool has been running in various off-line configurations for some time, and is scheduled to run as a regular part of the real-time forecast suite beginning in autumn 20 I O. We focus on the impacts of the newest components of the satellite observing system, including AIRS, IASI and GPS. For AIRS and IASI, it is shown that the vast majority of the channels assimilated have systematic positive impacts (of varying magnitudes), although some channels degrade the forecast. Of the latter, most are moisture-sensitive or near-surface channels. The impact of GPS observations in the southern hemisphere is found to be a considerable overall benefit to the system. In addition, the spatial variability of observation impacts reveals coherent patterns of positive and negative impacts that may point to deficiencies in the use of certain observations over, for example, specific surface types. When performed in conjunction with selected observing system experiments (OSEs), the adjoint results reveal both redundancies and dependencies between observing system impacts as observations are added or removed from the assimilation system. Understanding these dependencies appears to pose a major challenge for optimizing the use of the current observational network and defining requirements for future observing systems.

Gelaro, Ron↗

MSASGCN : Multi-Head Self-Attention Spatiotemporal Graph Convolutional Network for Traffic Flow Forecasting

Traffic flow forecasting is an essential task of an intelligent transportation system (ITS), closely related to intelligent transportation management and resource scheduling. Dynamic spatial-temporal dependencies in traffic data make traffic flow forecasting to be a challenging task. Most existing research cannot model dynamic spatial and temporal correlations to achieve well-forecasting performance. The multi-head self-attention mechanism is a valuable method to capture dynamic spatial-temporal correlations, and combining it with graph convolutional networks is a promising solution. Therefore, we propose a multi-head self-attention spatiotemporal graph convolutional network (MSASGCN) model. It can effectively capture local correlations and potential global correlations of spatial structures, can handle dynamic evolution of the road network, and, in the time dimension, can effectively capture dynamic temporal correlations. Experiments on two real datasets verify the stability of our proposed model, obtaining a better prediction performance than the baseline algorithms. The correlation metrics get significantly reduced compared with traditional time series prediction methods and deep learning methods without using graph neural networks, according to MAE and RMSE results. Compared with advanced traffic flow forecasting methods, our model also has a performance improvement and a more stable prediction performance. We also discuss some problems and challenges in traffic forecasting.

Cao, Yang↗

Integrating Survival Analysis with Bayesian Statistics to Forecast the Remaining Useful Life of a Centrifugal Pump Conditional to Multiple Fault Types

To improve the viability of nuclear power plants, there is a need to reduce their operational costs. Operational costs account for a significant portion of a plant’s yearly budget, due to their scheduled-based maintenance approach. In order to reduce these costs, proactive methods are required that estimate and forecast the state of a machine in real time to optimize maintenance schedules. In this research, we use Bayesian networks to develop a framework that can forecast the remaining useful life of a centrifugal pump. To do so, we integrate survival analysis with Bayesian statistics to forecast the health of the pump conditional to its current state. We complete our research by successfully using the Bayesian network on a case study. This solution provides an informed probabilistic viewpoint of the pumping system for the purpose of predictive maintenance.

42 ENGINEERING↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PROMIS (Procurement Management Information System)

The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

Source record↗

Application of Hybrid Optimization-Expert System for Optimal Power Management on Board Space Power Station

The space power system has two sources of energy: photo-voltaic blankets and batteries. The optimal power management problem on-board has two broad operations: off-line power scheduling to determine the load allocation schedule of the next several hours based on the forecast of load and solar power availability. The nature of this study puts less emphasis on speed requirement for computation and more importance on the optimality of the solution. The second category problem, on-line power rescheduling, is needed in the event of occurrence of a contingency to optimally reschedule the loads to minimize the 'unused' or 'wasted' energy while keeping the priority on certain type of load and minimum disturbance of the original optimal schedule determined in the first-stage off-line study. The computational performance of the on-line 'rescheduler' is an important criterion and plays a critical role in the selection of the appropriate tool. The Howard University Center for Energy Systems and Control has developed a hybrid optimization-expert systems based power management program. The pre-scheduler has been developed using a non-linear multi-objective optimization technique called the Outer Approximation method and implemented using the General Algebraic Modeling System (GAMS). The optimization model has the capability of dealing with multiple conflicting objectives viz. maximizing energy utilization, minimizing the variation of load over a day, etc. and incorporates several complex interaction between the loads in a space system. The rescheduling is performed using an expert system developed in PROLOG which utilizes a rule-base for reallocation of the loads in an emergency condition viz. shortage of power due to solar array failure, increase of base load, addition of new activity, repetition of old activity etc. Both the modules handle decision making on battery charging and discharging and allocation of loads over a time-horizon of a day divided into intervals of 10 minutes. The models have been extensively tested using a case study for the Space Station Freedom and the results for the case study will be presented. Several future enhancements of the pre-scheduler and the 'rescheduler' have been outlined which include graphic analyzer for the on-line module, incorporating probabilistic considerations, including spatial location of the loads and the connectivity using a direct current (DC) load flow model.

Momoh, James↗

Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

scheduling↗

Update to the Lightning Probability Forecast Equations at Kennedy Space Center/Cape Canaveral Air Force Station, Florida

This conference presentation describes the improvement of a set of lightning probability forecast equations that are used by the 45th Weather Squadron forecasters for their daily 1100 UTC (0700 EDT) weather briefing during the warm season months of May- September. This information is used for general scheduling of operations at Cape Canaveral Air Force Station and Kennedy Space Center. Forecasters at the Spaceflight Meteorology Group also make thunderstorm forecasts during Shuttle flight operations. Five modifications were made by the Applied Meteorology Unit: increased the period of record from 15 to 17 years, changed the method of calculating the flow regime of the day, calculated a new optimal layer relative humidity, used a new smoothing technique for the daily climatology, and used a new valid area. The test results indicated that the modified equations showed and increase in skill over the current equations, good reliability, and an ability to distinguish between lightning and non-lightning days.

Lambert, Winifred↗

Objective Lightning Probability Forecast Tool Phase II

This presentation describes the improvement of a set of lightning probability forecast equations that are used by the 45th Weather Squadron forecasters for their daily 1100 UTC (0700 EDT) weather briefing during the warm season months of May-September. This information is used for general scheduling of operations at Cape Canaveral Air Force Station and Kennedy Space Center. Forecasters at the Spaceflight Meteorology Group also make thunderstorm forecasts during Shuttle flight operations. Five modifications were made by the Applied Meteorology Unit: increased the period of record from 15 to 17 years, changed the method of calculating the flow regime of the day, calculated a new optimal layer relative humidity, used a new smoothing technique for the daily climatology, and used a new valid area. The test results indicated that the modified equations showed and increase in skill over the current equations, good reliability, and an ability to distinguish between lightning and non-lightning days.

Lambert, Winnie↗

Update to the Objective Lightning Probability Forecast Tool in use at Cape Canaveral Air Force Station, Florida

This conference poster describes the improvement of a set of lightning probability forecast equations that are used by the 45th Weather Squadron forecasters for their daily 1100 UTC (0700 EDT) weather briefing during the warm season months of May-September. This information is used for general scheduling of operations at Cape Canaveral Air Force Station and Kennedy Space Center. Forecasters at the Spaceflight Meteorology Group also make thunderstorm forecasts during Shuttle flight operations. Five modifications were made by the Applied Meteorology Unit: increased the period of record from 15 to 17 years, changed the method of calculating the flow regime of the day, calculated a new optimal layer relative humidity, used a new smoothing technique for the daily climatology, and used a new valid area. The test results indicated that the modified equations showed and increase in skill over the current equations, good reliability and an ability to distinguish between lightning and non-lightning days.

Lambert, Winifred↗

Update to the Lightning Probability Forecast Equations at Kennedy Space Center/Cape Canaveral Air Force Station, Florida

This conference presentation describes the improvement of a set of lightning probability forecast equations that are used by the 45th Weather Squadron forecasters for their daily 1100 UTC (0700 EDT) weather briefing during the warm season months of May-September. This information is used for general scheduling of operations at Cape Canaveral Air Force Station and Kennedy Space Center. Forecasters at the Spaceflight Meteorology Group also make thunderstorm forecasts during Shuttle flight operations. Five modifications were made by the Applied Meteorology Unit: increased the period of record from 15 to 17 years, changed the method of calculating the flow regime of the day, calculated a new optimal layer relative humidity, used a new smoothing technique for the daily climatology, and used a new valid area. The test results indicated that the modified equations showed and increase in skill over the current equations, good reliability, and an ability to distinguish between lightning and non-lightning days.

Lambert, Winifred↗

Update to the Objective Lightning Probability Forecast Tool in Use at Cape Canaveral Air Force Station, Florida

This conference presentation describes the improvement of a set of lightning probability forecast equations that are used by the 45th Weather Squadron forecasters for their daily 1100 UTC (0700 EDT) weather briefing during the warm season months of May-September. This information is used for general scheduling of operations at Cape Canaveral Air Force Station and Kennedy Space Center. Forecasters at the Spaceflight Meteorology Group also make thunderstorm forecasts during Shuttle flight operations. Five modifications were made by the Applied Meteorology Unit: increased the period of record from 15 to 17 years, changed the method of calculating the flow regime of the day, calculated a new optimal layer relative humidity, used a new smoothing technique for the daily climatology, and used a new valid area. The test results indicated that the modified equaitions showed and increase in skill over the current equations, good reliability, and an ability to distinguish between lightning and non-lightning days.

Lambert, Winifred↗