Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fluid management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

NASA cryogenic fluid management space experiment efforts

A history of technological development for subcritical cryogenic fluid management (CFM) through space experiments is given for the period 1960 to 1990. Space experiments with liquid hydrogen were conducted in the early 1960s. Efforts since then have consisted of studies and designs of potential space experiments. A chronology of CFM space experiments and design efforts is included.

Glover, Daniel↗

Study of toluene rotary fluid management device and shear flow condenser performance for a space-based organic Rankine power system

Management of two-phase fluid and control of the heat transfer process in microgravity is a technical challenge that must be addressed for an orbital Organic Rankine Cycle (ORC) application. A test program was performed in 1-g that satisfactorily demonstrated the two-phase management capability of the rotating fluid management device (RFMD) and shear-flow condenser. Operational tests of the RFMD and shear flow condenser in adverse gravity orientations, confirmed that the centrifugal forces in the RFMD and the shear forces in the condenser were capable of overcoming gravity forces. In a microgravity environment, these same forces would not have to compete against gravity and would therefore be dominant. The specific test program covered the required operating range of the Space Station Solar Dynamic Rankine Cycle power system. Review of the test data verified that: fluid was pumped from the RFMD in all attitudes; subcooled states in the condenser were achieved; condensate was pushed uphill against gravity; and noncondensible gases were swept through the condenser.

Havens, Vance↗

Modeling, simulation and control for a cryogenic fluid management facility, preliminary report

The synthesis of a control system for a cryogenic fluid management facility was studied. The severe demand for reliability as well as instrumentation and control unique to the Space Station environment are prime considerations. Realizing that the effective control system depends heavily on quantitative description of the facility dynamics, a methodology for process identification and parameter estimation is postulated. A block diagram of the associated control system is also produced. Finally, an on-line adaptive control strategy is developed utilizing optimization of the velocity form control parameters (proportional gains, integration and derivative time constants) in appropriate difference equations for direct digital control. Of special concern are the communications, software and hardware supporting interaction between the ground and orbital systems. It is visualized that specialist in the OSI/ISO utilizing the Ada programming language will influence further development, testing and validation of the simplistic models presented here for adaptation to the actual flight environment.

Turner, Max A.↗

LeRC cryogenic fluid management program overview

An overview is given of the Lewis Research Center's cryogenic fluid management program in the form of viewgraphs. Objectives, approach, program elements, cost analysis, modeling, and flight experiment development are outlined.

Symons, E. P.↗

NASA cryogenic fluid management space experiment efforts, 1960-1990

A history of technological development for subcritical cryogenic fluid management (CFM) through space experiments is given for the period 1960 to 1990. Space experiments with liquid hydrogen were conducted in the early 1960's. Efforts since then have consisted of studies and designs of potential space experiments. A chronology of CFM space experiments and design efforts is included.

Glover, Daniel↗

The NASA cryogenic fluid management technology program plan

During the past three decades, NASA has been designing and using large quantities of cryogenic fluids for propulsion system propellants, coolants for experiments, and for environmental control systems. As a consequence, an erroneous conclusion has been drawn that the technology exists for using large quantities of cryogens in space for long periods of time. The attempt here is to dispel that myth and to present the technology needs that require development in order to support the NASA programs of the future. A NASA program, developed through the impetus of the Marshall Space Flight Center and the Lewis Research Center and supported by all NASA centers is outlined. The current state of the art is discussed along with specific needs for near future missions. Then, using the Space Exploration Initiative mission set, cost/benefit projections are made for the development of advanced cryogenic fluid management techniques. Earth based and space based test programs are discussed relative to the technology requirements for liquid storage, supply, and transfer for fluid transfer and advanced instrumentation.

Faddoul, James R.↗

Thermal Performance of a Cryogenic Fluid Management Cubesat Mission

Development for an in-space demonstration of a CubeS at as a Cryogenic Fluid Management (CFM) test bed is currently underway. The favorable economics of CubeSats make them appealing for technology development activity. While their size limits testing to smaller scales, many of the regimes relevant to CFM can still be achieved. The first demo flight of this concept, CryoCube®-1, will focus on oxygen liquefaction and low-gravity level sensing using Reduced Gravity CryoTracker®. An extensive thermal modeling effort has been underway to both demonstrate concept feasibility and drive the prototype design. The satellite will utilize both a sun- and earth-shield to passively cool its experimental tank below 115 K. An on-board gas generator will create high pressure gaseous oxygen, which will be throttled into a bottle in the experimental node and condensed. The resulting liquid will be used to perform various experiments related to level sensing. Modeling efforts have focused on the spacecraft thermal performance and its effects on condensation in the experimental node. Parametric analyses for both optimal and suboptimal conditions have been considered and are presented herein.

Berg, J. J.↗

Centaur Test Bed (CTB) for Cryogenic Fluid Management

Future missions such as NASA s space exploration vision and DOD satellite servicing will require significant increases in the understanding and knowledge of space based cryogenic fluid management (CFM), including the transfer and storage of cryogenic fluids. Existing CFM capabilities are based on flight of upper stage cryogenic vehicles, scientific dewars, a few dedicated flight demonstrations and ground testing. This current capability is inadequate to support development of the CEV cryogenic propulsion system, other aspects of robust space exploration or the refueling of satellite cryo propulsion systems with reasonable risk. In addition, these technologies can provide significant performance increases for missions beyond low-earth orbit to enable manned missions to the Moon and beyond. The Centaur upper-stage vehicle can provide a low cost test platform for performing numerous flight demonstrations of the full breadth of required CFM technologies to support CEV development. These flight demonstrations can be performed as secondary mission objectives using excess LH2 and/or LO2 from the main vehicle propellant tanks following primary spacecraft separation at minimal cost and risk.

Sakla, Steven↗

Cryogenic Fluid Management for the Artemis Program and Beyond

NASA is endeavoring on an ambitious return to the Moon and eventually on to Mars through the Artemis Program leveraging innovative technologies to establish sustainable exploration architectures collaborating with US commercial and international partners [1]. Future NASA architectures have baselined cryogenic propulsion systems to support lunar missions and ultimately future missions to Mars. NASA has been investing in maturing CFM active and passive storage, transfer, and gauging technologies over the last decade plus primarily focused on ground development with a few small-scale microgravity fluid experiments. Recently, NASA created a Cryogenic Fluid Management (CFM) Technology Roadmap identifying the critical gaps requiring further development to reach a technology readiness level (TRL) of 6 prior to infusion to flight applications. To address the technology gaps the Space Technology Mission Directorate (STMD) strategically plans to invest in a diversified CFM portfolio approach through ground and flight demonstrations, collaborating with international partners, and leveraging Public Private Partnerships (PPPs) opportunities with US industry through the Tipping Point and Announcement of Collaborative Opportunities (ACO) solicitations. Once proven, these system capabilities will enable the high performing cryogenic propellant systems needed for the Artemis Program and beyond.

Cryogenic Fluid Management↗

Cryogenic Fluid Management Technologies Enabling for the Artemis Program and Beyond

NASA is endeavoring on an ambitious return to the Moon and eventually on to Mars through the Artemis Program leveraging innovative technologies to establish sustainable exploration architectures collaborating with US commercial and international partners[1]. Future NASA architectures have baselined cryogenic propulsion systems to support lunar missions and ultimately future missions to Mars. NASA has been investing in maturing CFM active and passive storage, transfer, and gauging technologies over the last decade plus primarily focused on ground development with a few small-scale microgravity fluid experiments. Recently, NASA created a Cryogenic Fluid Management (CFM)Technology Roadmap identifying the critical gaps requiring further development to reach a technology readiness level (TRL) of 6 prior to infusion to flight applications. To address the technology gaps the Space Technology Mission Directorate(STMD)strategically plans to invest in a diversified CFM portfolio approach through ground and flight demonstrations ,collaborating with international partners, and leveraging Public Private Partnerships (PPPs) opportunities with US industry through the Tipping Point and Announcement of Collaborative Opportunities (ACO) solicitations. Once proven, these system capabilities will enable the high performing cryogenic propellant systems needed for the Artemis Program and beyond.

Cryogenic Fluid Management↗

A Summary of Recent SBIR and STTR Projects in Support of Cryogenic Fluid Management Modeling

Over the last five years, NASA has invested in development of sub-models to improve the current capabilities of Computational Fluid Dynamics (CFD) codes utilized for cryogenic fluid management (CFM) predictions. The goal is for the submodels to be modular so that they can easily be implemented into NASA’s CFD codes such as ANSYS Fluent, Siemens STAR-CCM+, and Streamline Numerics Loci-Stream. These technologies are being developed through Small Business Innovative Research (SBIR) and Small Business Technology Transfer (STTR) contracts under the CFM subtopic solicitation and funded by the CFM Portfolio Project. All contracts presented include cryogenic experiments to enable model validation. A sub-grid boiling model has been developed by Combustion Research and Flow Technology Inc. and Massachusetts Institute of Technology for cryogenic line chilldown predictions and has completed Phase III. A spray chill-and-fill model for cryogenic tankage is being developed by Combustion Research and Flow Technology Inc. and University of Connecticut and is currently in Phase II. Last, film condensation modeling to support cryogenic liquefaction was progressed through a Phase I contract with Combustion Research and Flow Technology Inc. and University of Connecticut. A summary of accomplishments for each contract is presented.

cryogenics↗

Cryogenic fluid management experiment trunnion fatigue verification

A subcritical liquid hydrogen orbital storage and transfer experiment was designed for flight in the Shuttle cargo bay. The Cryogenic Fluid Management Experiment (CFME) includes a liquid hydrogen tank supported in a vacuum jacket by two fiberglass epoxy trunnion mounts. This composite material was selected for the trunnions since it provides desirable strength, weight and thermal characteristics for supporting cryogenic tankage. An experimental program was conducted to provide material property and fatigue data for S-glass epoxy composite materials at ambient and liquid hydrogen temperatures and to verify structural integrity of the CFME trunnion supports.

Bailey, W. J.↗

Cryogenic Fluid Management Technology Development for Nuclear Thermal Propulsion

The purpose of this paper is to investigate, facilitate a discussion and determine a path forward for technology development of cryogenic fluid management technology that is necessary for long duration deep space missions utilizing nuclear thermal propulsion systems. There are a number of challenges in managing cryogenic liquids that must be addressed before long durations missions into deep space, such as a trip to Mars can be successful. The leakage rate of hydrogen from pressure vessels, seals, lines and valves is a critical factor that must be controlled and minimized. For long duration missions, hydrogen leakage amounts to large increases in hydrogen and therefore vehicle mass. The size of a deep space vehicle, such as a mars transfer vehicle, must be kept small to control cost and the logistics of a multi launch, assembled in orbit vehicle. The boil off control of the cryogenic fluid is an additional obstacle to long duration missions. The boil off caused by heat absorption results in the growth of the propellant needs of the vehicle and therefore vehicle mass. This is a significant problem for a vehicle using nuclear (fission) propulsion systems. Radiation from the engines deposits large quantities of heat into the cryogenic fluid, greatly increasing boil off beyond that caused by environmental heat leakage. Addressing and resolving these challenges is critical to successful long duration space exploration. This paper discusses the state of the technology needed to address these challenges and discuss the path forward needed in technology development.

Taylor, Brian↗

Flight Development for Cryogenic Fluid Management in Support of Exploration Missions

This paper describes the results of the "Experimentation for the Maturation of Deep Space Cryogenic Refueling Technology" study. The purposes of this study were to identify cryogenic fluids management technologies requiring low gravity flight experiments to bring to technology readiness level (TRL) 5-6; to study many possible flight experiment options; and to develop near-term low-cost flight experiment concepts to mature core technologies of refueling. A total of twenty-five white papers were prepared in the course of this study. Each white paper is briefly summarized and relevant references cited. A total of 90 references are cited.

Chato, David J.↗

Fitting Leak Test Report: Ground-Based Cryogenic Leak Test of Fittings for Cryogenic Fluid Management

EXECUTIVE SUMMARY Mechanically connected joints used in cryogenic fluid lines as part of space flight elements need to survive launch vibrations and remain leak-free to minimize the loss of on-board commodity and hazardous gas accumulation. In 2020, a cryogenic test apparatus was developed which can evaluate the leak performance of pressurized threaded fluid fittings. The fittings were mounted in the TVAC and cooled to cryogenic test temperature and pressurized with helium while the leak rate was measured using a calibrated GHe leak detector. The test articles for the initial proof of concept testing were ¼ and 1 inch Swagelok VCR fittings with three different types of seal rings copper, nickel, and Ni. Each fitting configuration (size/seal material) was subjected to two consecutive cryogenic thermal cycles, followed by exposure to a launch vibration profile at ambient temperature, after which two additional TVAC cycle tests were performed. The testing reported here is a continuation of the 2020 tests with a statistically significant large number of samples and test runs. Three Swagelok VCR fitting sizes were tested ¼, ½ and 1 inch, and five (5) samples of each fitting size, each sample was tested with SST and Ni seal rings (Total of 30 unique test articles). Each test article was subjected to four (4) thermal cycles. Half of these cycles were performed before vibration testing and half were performed after vibration testing. The vibration testing was performed to evaluate the ability of the fittings to survive launch-type vibration profiles and remain leak-free. Leak checking of each fitting was completed at temperatures between 20K – 30K. The test procedure in Section 8.0 was designed to facilitate a qualification test program by allowing a higher test throughput rate coupled with repeatable test profiles. Results were very positive and show that out of the 30 samples they all passed with leak rates a factor of 2-3 lower than the established 10-6sccs GHe leak threshold. The result showed the Ni seals had lower leak rate, but the SST was more rugged. There were two deviations where damage to the Ni seal ring during assembly resulted in a leaky fitting, this is discussed in Section 10.7 Test Deviations. These fittings show great promise for space flight use and further testing is recommended to fully qualify the fittings per the ASTM F1387-19 and/or other relevant NASA specifications. The test equipment hardware and software capability developed for this testing is generic and not restricted to VCR fittings. It can be employed to evaluate/qualify the leak performance of other types of fittings and a wide range of other cryogenic fluid components such as valves, gages, connectors, etc.

Cryogenic↗

Cryogenic fluid management technology requirements for the Space Transfer Vehicle

An in-house study was performed to design a cryogenic Space Transfer Vehicle (STV) for the late 1990s that can evolve with the demanding mission requirements of the manned exploration initiatives. An assessment of cryogenic fluid management technology issues associated with the STV was performed to identify technology gaps and propose advanced development activities.

Cramer, John M.↗

Microgravity fluid management requirements of advanced solar dynamic power systems

The advanced solar dynamic system (ASDS) program is aimed at developing the technology for highly efficient, lightweight space power systems. The approach is to evaluate Stirling, Brayton and liquid metal Rankine power conversion systems (PCS) over the temperature range of 1025 to 1400K, identify the critical technologies and develop these technologies. Microgravity fluid management technology is required in several areas of this program, namely, thermal energy storage (TES), heat pipe applications and liquid metal, two phase flow Rankine systems. Utilization of the heat of fusion of phase change materials offers potential for smaller, lighter TES systems. The candidate TES materials exhibit large volume change with the phase change. The heat pipe is an energy dense heat transfer device. A high temperature application may transfer heat from the solar receiver to the PCS working fluid and/or TES. A low temperature application may transfer waste heat from the PCS to the radiator. The liquid metal Rankine PCS requires management of the boiling/condensing process typical of two phase flow systems.

Migra, Robert P.↗

AF cryogenic and fluid management spacecraft technology program

Viewgraphs are given that outline the program objectives of long term cryogenic storage programs. Diagrams of the orbit transfer vehicle, thermal insulation blankets, cryogenic storage tanks, the advanced liquid feed experiment, and the acoustic measurement on satellite experiment are presented. The objectives, goals, and payoffs of the fluid management space experiment and the liquid droplet radiator are outlined.

Silver, Roy↗