Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flow meter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Preliminary characterization of active MEMS valves.

Partial characterization of a series of electrostatically actuated active microfluidic valves is to be performed. Tests are performed on a series of 24 valves from two different MEMS sets. Focus is on the physical deformation of the structures under variable pressure loadings, as well as voltage levels. Other issues that inhibit proper performance of the valves are observed, addressed and documented as well. Many microfluidic applications have need for the distribution of gases at finely specified pressures and times. To this end a series of electrostatically actuated active valves have been fabricated. Eight separate silicon die are discussed, each with a series of four active valves present. The devices are designed such that the valve boss is held at a ground, with a voltage applied to lower contacts. Resulting electrostatic forces pull the boss down against a series of stops, intended to create a seal as well as prevent accidental shorting of the device. They have been uniquely packaged atop a stack of material layers, which have inlaid channels for application of fluid flow to the backside of the valve. Electrical contact is supplied from the underlying printed circuit board, attached to external supplies and along traces on the silicon. Pressure is supplied from a reservoir of house compressed air, up to 100 Psig. This is routed through a Norgren R07-200-RGKA pressure regulator, rated to 150 Psig. From there flow passes a manually operated ball valve, and to a flow meter. Two flow meters were utilized; initially an Omega FMA1802 rated at 10 sccm, and followed by a Flocat model for higher flow rates up to 100 sccm. An Omega DPG4000-500 pressure gauge produced pressure measurements. Optical measurements were returned via a WYKO Interferometry probe station. This would allow for determination of physical deformations of the device under a variety of voltage and pressure loads. This knowledge could lead to insight as to the failure mechanisms of the device, yielding improvements for subsequent fabrications.

47 OTHER INSTRUMENTATION↗

Data system for multiplexed water-current meters

Flow rates at 32 flood plain locations are measured simultaneously by single digital logic unit with high noise immunity. Water flowing through pygmy current meters rotates element that closes electrical contact once every resolution, so flow rate is measured by counting number of closures in time interval.

Ramsey, C. R.↗

Primary coolant flow measurement for integral pressurized water reactors using ultrasonic technique - 182

Several pressurized water reactor (PWR) systems under development employ integral primary coolant loop designs, where the primary coolant does not leave the reactor pressure vessel during operation (I{sup 2}S-LWR, mPower, NuScale). The absence of primary coolant piping inhibits traditional pressurized water reactor primary coolant flow measurement, in which the differential pressure across the steam generator is correlated to flow rate. To address this, a transit time, reflection mode, ultrasonic flow meter is proposed. An experimental flow loop utilizing a test section representative of a thin azimuthal slice of the down-comer region of an integral PWR has been constructed to test the efficacy of the General Electric AT600 ultrasonic flow meter (UFM) in such an application. A Great Plains Industries TM300 turbine flow meter (TFM), reporting volumetric flow rate and installed in-line with the flow loop piping, is used as the reference meter. UFM performance is affected by several factors, including flow development and symmetry. The UFM was installed on three locations along the flow path of water through the test section. The meter performed the best at the downstream end of the test section, where the fluid flow is the most developed. Performance, measured by percent error in UFM average reading with respect to the TFM average reading, generally improved with increasing flow rate at all locations, though absolute difference between meter readings increased with flow rate. This research suggests that ultrasonic approaches hold promise for non-invasive measurement of primary coolant flow in integral PWRs. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

State-of-charge coulometer

A coulometer for accurately measuring the state-of-charge of an open-cell battery utilizing an aqueous electrolyte, includes a current meter for measuring the battery/discharge current and a flow meter for measuring the rate at which the battery produces gas during charge and discharge. Coupled to the flow meter is gas analyzer which measures the oxygen fraction of the battery gas. The outputs of the current meter, flow meter, and gas analyzer are coupled to a programmed microcomputer which includes a CPU and program and data memories. The microcomputer calculates that fraction of charge and discharge current consumed in the generation of gas so that the actual state-of-charge can be determined. The state-of-charge is then shown on a visual display.

Rowlette, J. J.↗

Liquid Oxygen/Liquid Methane Test Results of the RS-18 Lunar Ascent Engine at Simulated Altitude Conditions at NASA White Sands Test Facility

Tests were conducted with the RS-18 rocket engine using liquid oxygen (LO2) and liquid methane (LCH4) propellants under simulated altitude conditions at NASA Johnson Space Center White Sands Test Facility (WSTF). This project is part of NASA's Propulsion and Cryogenics Advanced Development (PCAD) project. "Green" propellants, such as LO2/LCH4, offer savings in both performance and safety over equivalently sized hypergolic propulsion systems in spacecraft applications such as ascent engines or service module engines. Altitude simulation was achieved using the WSTF Large Altitude Simulation System, which provided altitude conditions equivalent up to ~122,000 ft (~37 km). For specific impulse calculations, engine thrust and propellant mass flow rates were measured. LO2 flow ranged from 5.9 - 9.5 lbm/sec (2.7 - 4.3 kg/sec), and LCH4 flow varied from 3.0 - 4.4 lbm/sec (1.4 - 2.0 kg/sec) during the RS-18 hot-fire test series. Propellant flow rate was measured using a coriolis mass-flow meter and compared with a serial turbine-style flow meter. Results showed a significant performance measurement difference during ignition startup due to two-phase flow effects. Subsequent cold-flow testing demonstrated that the propellant manifolds must be adequately flushed in order for the coriolis flow meters to give accurate data. The coriolis flow meters were later shown to provide accurate steady-state data, but the turbine flow meter data should be used in transient phases of operation. Thrust was measured using three load cells in parallel, which also provides the capability to calculate thrust vector alignment. Ignition was demonstrated using a gaseous oxygen/methane spark torch igniter. Test objectives for the RS-18 project are 1) conduct a shakedown of the test stand for LO2/methane lunar ascent engines, 2) obtain vacuum ignition data for the torch and pyrotechnic igniters, and 3) obtain nozzle kinetics data to anchor two-dimensional kinetics codes. All of these objectives were met with the RS-18 data and additional testing data from subsequent LO2/methane test programs in 2009 which included the first simulated-altitude pyrotechnic ignition demonstration of LO2/methane.

Melcher, John C., IV↗

Electromagnetic flow rate meter

A liquid metal, whose flow rate is to be determined, is directed through a chamber made of electrically-insulating material on which there is impressed a magnetic field perpendicular to the direction of flow of the liquid metal. The magnetic field is made to increase in strength in a downstream direction of the flow of liquid metal. At least a pair of electrodes are disposed in the chamber traversely and perpendicular to the direction of flow and an ammeter is connected between the electrodes. Electrodes may be disposed in the top or the bottom of the chamber and each may be segmented. Oppositely disposed electrodes may be used with at least one dividing wall extending from each electrode to cause reversal of the direction of flow of the liquid metal. The magnetic field may be provided by electromagnets or permanent magnets such as shaded pole permanent magnets.

Banks, B. A.↗

Performance Demonstration of an Occupancy Sensor-enabled Integrated Solution for Commercial Buildings

Traditionally, a single-loop fixed-gain controller is applied to supply fan (SF) and cooling coil (CC) valve controls while a fixed-damper position control is applied to outdoor air (OA) damper control at air handling units (AHUs) in commercial buildings. With the increasing application of occupancy sensors, the information generated by occupancy sensors is applied to not only reduce the electricity loads from lighting and controllable plug loads, but also reset OA intake and minimum supply airflow setpoints. Meanwhile, these intermittent operation actions greatly elevate the dynamics of AHU systems, which may introduce unstable SF and CC valve operations and inaccurate OA flow control at AHUs and consequently degrade maximum energy efficiency gains. With virtual fan and valve flow meter technologies, two advanced controls, including cascade control and gain scheduling control, can be implemented on both the SF and CC valve, and an advanced control using a virtual OA flow meter can be implemented on OA damper integrated with occupancy sensors. The goal of this project is to demonstrate the savings, cost, and performance of an integrated solution that integrates the three advanced HVAC controls with occupancy sensors to allow accurate and stable AHU operations in real buildings. The project objectives are to: 1) develop and validate an advance SF control algorithm; 2) develop and validate an advanced CC valve control algorithm; 3) validate an algorithm to implement a virtual OA flow meter; and 4) demonstrate the savings, cost, and performance of the integrated solution in real buildings. The technical approaches are to: 1) select a test system at the University of Oklahoma; 2) develop and implement the algorithms of advanced SF and CC valve controls and validate the performance; 3) develop and implement the advanced OA control using a virtual OA flow meter and validate the performance; 4) demonstrate the savings, cost, and performance of the proposed integrated solution with and without three advanced HVAC controls; and 5) disseminate the project results through publications and presentations. For the SF control, both the gain scheduling and cascade controls can improve the fan energy performance by reducing the fan power during the transient period and the fan control performance at lower speeds by reducing fan speed variation. Moreover, the gain scheduling control provides a simple and low-cost solution and is recommended. The fan power savings can reach 30% in a transient period. For the CC valve control, the gain scheduling control can considerably reduce the supply air temperature oscillation range and frequency under both higher and lower load conditions and the control valve response is much more stable. As a result, the gain scheduling control is recommended. The projected pump energy consumption can be reduced by 68.5%. With the developed virtual OA flow meter, the OA can be accurately controlled at its setpoint, which is determined based on the actual number of occupants in the building provided by occupancy sensors. The RMSE of the proposed OA control is 15.9 L/s. The energy data shows that the fan power and CC cooling energy were significantly reduced. On the other hand, the energy savings majorly results from the occupancy sensors and the energy savings by the advanced HVAC controls is minimal because that the controllers in the test AHU were tuned with very slow response. An annual technical savings potential is estimated as 0.5 quads in the commercial sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electromagnetic flowmeter.

Transducer and electronic detector of electromagnetic flow meter for volumetric flow measurement for both electrically conducting and dielectric fluids

FLOW METER↗

Fluid Flow Technology that Measures Up

From 1994 to 1996, NASA s Marshall Space Flight Center conducted a Center Director's Discretionary Fund research effort to apply artificial intelligence technologies to the health management of plant equipment and space propulsion systems. Through this effort, NASA established a business relationship with Quality Monitoring and Control (QMC), of Kingwood, Texas, to provide hardware modeling and artificial intelligence tools. Very detailed and accurate Space Shuttle Main Engine (SSME) analysis and algorithms were jointly created, which identified several missing, critical instrumentation needs for adequately evaluating the engine health status. One of the missing instruments was a liquid oxygen (LOX) flow measurement. This instrument was missing since the original SSME included a LOX turbine flow meter that failed during a ground test, resulting in considerable damage for NASA. New balanced flow meter technology addresses this need with robust, safe, and accurate flow metering hardware.

Source record↗

Flow Boiling and Condensation Experiment Flight Hardware Development

The Flow Boiling and Condensation Experiment (FBCE) to be manifested on the International Space Station (ISS) consists of a fluid system and the associated electronics to provide for conditioning the test fluid (normal-PerFluorohexane or nPFH-C6F14) to the proper thermodynamic state prior to entering a test module, which can be interchangeable based on the science objectives. Two separate test modules have been manufactured for the FBCE, the Flow Boiling Module (FBM), which investigates flow boiling for a subcooled liquid, saturated liquid, or two phase mixture, and the Condensation Module Heat Transfer (CM-HT), which investigates condensation of a flowing saturated or superheated vapor. The test fluid heating is accomplished using the Bulk Heater Module (BHM), which heats the fluid to various states based on the demands of the currently installed test module. ISS Internal Thermal Control System (ITCS) water is utilized to cool the test fluid prior to entering the circulation pump, and is also utilized for cooling for condensation in CM-HT, for cooling of a camera in FBM. An adjustable pressure bellows-type accumulator is used to set the pressure at the inlet of the test section, but does not provide active pressure control during testing. The flow of the test fluid is achieved using a gear pump controlled by a coriolis flow meter, which also provides the flow rate measurement. Flow rates for the ITCS water loops are measured and controlled using coriolis flow meters with directly controlled proportional valves. During execution of FBCE operations, the FBM is scheduled to collect data for three months before being exchanged with CM-HT for another three month data collection run. In this work, we present the development of the flight hardware, the associated challenges experienced during the development such as packaging flight system hardware, and the lessons learned in overcoming the encountered challenges.

Guzik, Monica C.↗

TESTING OF THE DUAL ROTARY FILTER SYSTEM

The Savannah River National Laboratory (SRNL) installed and tested two hydraulically connected SpinTek rotary microfilter (RMF) units to determine the behavior of a multiple filter system. Both units were successfully controlled by a control scheme written in DELTA-V architecture by Savannah River Remediation (SRR) Process Control Engineering personnel. The control system was tuned to provide satisfactory response to changing conditions during the operation of the multi-filter system. Stability was maintained through the startup and shutdown of one of the filter units while the second was still in operation. The installation configuration originally proposed by the Small Colum Ion Exchange (SCIX) project of independent filter and motor mountings may be susceptible to vibration. Significant stiffening of the filter and motor mounts was required to minimize the vibration. Alignment of the motor to the filter was a challenge in this test configuration. The deployment configuration must be easy to manipulate and allow for fine adjustment. An analysis of the vibration signature of the test system identified critical speeds. Whether it corresponds to the resonance frequency of a rotor radial vibration mode that was excited by rotor unbalance is uncertain based upon the measurements. A relative motion series should be completed on the filter with the final shaft configuration to determine if the resonances exist in the final filter design. The instrumentation selected for deployment, including the concentrate discharge control valve and flow meters, performed well. Automation of the valve control integrated well with the control scheme and when used in concert with the other control variables, allowed automated control of the dual RMF system. The one area of concern with the instrumentation was the condition resulting when the filtrate flow meter operated with less than three gpm. This low flow was at the lower range of performance for the flow meter. This should not be an issue in deployment where the desired flow rate will be within the normal operating range of the meter. Testing demonstrated that the use of a flexible line for the filtrate discharge is highly desired at the outlet of the rotary union to transition to the system piping. Isolating the vibration from the rotary union will significantly improve the lifetime of the seals. Methods to monitor and isolate individual filters should be considered during deployment. The ability to diagnose issues and isolate individual filters would allow isolation prior to failure. Thus, filters may be cleaned or repaired instead of requiring complete replacement if the condition were to continue unnoticed. Isolating the filtrate line of each filter during startup will minimize the premature buildup of solids on the filter disks. Several tests have shown that the method of filter startup can improve performance lifetime of the filters. The installation must factor in an air inlet for the draining of a filter that does not involve a reverse flow through the filter disks. The reverse flow may cause deformation of the disks or may damage other components of the filters themselves.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Dual Aerodynamic Nozzle Model for the NTF Semi-Span Model Support System

The recent addition of a dual flow air delivery system to the NASA Langley National Transonic Facility was experimentally validated with a Dual Aerodynamic Nozzle semi-span model. This model utilized two Stratford calibration nozzles to characterize the weight flow system of the air delivery system. The weight flow boundaries for the air delivery system were identified at mildly cryogenic conditions to be 0.1 to 23 lbm/sec for the high flow leg and 0.1 to 9 lbm/sec for the low flow leg. Results from this test verified system performance and identified problems with the weight-flow metering system that required the vortex flow meters to be replaced at the end of the test.

Jones, Greg S.↗

Behavior of turbine and Venturi flowmeters in superfluid helium

An apparatus which forces liquid helium from a calibrated bellows through a flow meter is used to calibrate turbine and Venturi flow meters in both normal and superfluid helium. The bellows are driven by an ambient temperature stepping motor. Flow rates range up to 0.35 L/s, and helium temperatures range from 1.25-4.0 K. For the case of a 9.3-mm bore turbine meter, identical meter factors are found for normal and superfluid helium. For the Venturi meter, discharge coefficients between 0.98 and 1.0 are found with normal and superfluid helium.

Daney, D. E.↗

Experimental Activities with the IELLLO Lithium-Lead Facility

Fusion power offers the prospect of an almost inexhaustible source of energy for future generations. Although this may be true, it also presents so far serious scientific and engineering challenges. Breeding Blanket is one of key components of future fusion reactors, since it directly involves tritium breeding and energy extraction, both of them critical to development of fusion power. To deal with the development of Breeding Blankets, ENEA (Italian National Agency for New Technologies, Energy and Sustainable Economic Development) designed and built a lead lithium loop (IELLLO: Integrated European Lead Lithium Loop): the experiment aims to support R and D activities for the conceptual and preliminary design of the European test blanket systems. IELLLO was completed, installed and operated at ENEA Brasimone Research Centre. The purpose of this work is to describe the experimental activities that have been carried out concerning the qualification of the facility, and relative instrumentations, for lead lithium applications. A series of thermo-hydraulic investigations on IELLLO facility has been elaborated: lead lithium pressure transducers, heat exchanger, permanent magnet pumping system, mass flow meters and air cooler have been tested. The absolute pressure meter in contact with Pb-16Li was qualified in pressure range up to 10 bar and temperature up to 400 deg. C. The installation of new kinds of Pb-16Li differential pressure transducers will allow to check the pump characteristic curve and accurately calculate valves pressure drops. These factors could give a better information for the thermo-hydraulic qualification of the facility. Vortex Mass Flow Meter has shown good results in terms of accuracy. The performance has been validated by thermal balance with a dedicated heating system. Nevertheless, the installations of different types of mass flow meters will enable to test IELLLO at ITER relevant conditions, and at lower mass flow rates than those tested up to now. The new pumping system with a PM Pump, was qualified for the first time in Pb-16Li, and the procedure for the operation and maintenance of the pump was developed. The pump is able to supply a mass flow rate in the range from 1.2 to 2.4 kg/s with a temperature of Pb-16Li up to 550 deg. C in the test section. Significant results have been obtained also for the heat exchanger, which has shown high efficiencies, even more than expected. Likewise, the Air Cooler has been verified to be able to cool Pb-16Li in a relatively short time, even at the worst temperature and mass flow conditions. (authors)

42 ENGINEERING↗

Liquid Oxygen/Liquid Methane Test Summary of the RS-18 Lunar Ascent Engine at Simulated Altitude Conditions at NASA White Sands Test Facility

Tests were conducted with the RS18 rocket engine using liquid oxygen (LO2) and liquid methane (LCH4) propellants under simulated altitude conditions at NASA Johnson Space Center White Sands Test Facility (WSTF). This project is part of NASA s Propulsion and Cryogenics Advanced Development (PCAD) project. "Green" propellants, such as LO2/LCH4, offer savings in both performance and safety over equivalently sized hypergolic propellant systems in spacecraft applications such as ascent engines or service module engines. Altitude simulation was achieved using the WSTF Large Altitude Simulation System, which provided altitude conditions equivalent up to approx.120,000 ft (approx.37 km). For specific impulse calculations, engine thrust and propellant mass flow rates were measured. Propellant flow rate was measured using a coriolis-style mass-flow meter and compared with a serial turbine-style flow meter. Results showed a significant performance measurement difference during ignition startup. LO2 flow ranged from 5.9-9.5 lbm/sec (2.7-4.3 kg/sec), and LCH4 flow varied from 3.0-4.4 lbm/sec (1.4-2.0 kg/sec) during the RS-18 hot-fire test series. Thrust was measured using three load cells in parallel. Ignition was demonstrated using a gaseous oxygen/methane spark torch igniter. Data was obtained at multiple chamber pressures, and calculations were performed for specific impulse, C* combustion efficiency, and thrust vector alignment. Test objectives for the RS-18 project are 1) conduct a shakedown of the test stand for LO2/methane lunar ascent engines, 2) obtain vacuum ignition data for the torch and pyrotechnic igniters, and 3) obtain nozzle kinetics data to anchor two-dimensional kinetics codes.

Melcher, John C., IV↗