Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fleet”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Optimizing Energy For Delivery Drones - A Comprehensive Tool Set For Drone Energy Calculation And Drone Fleet Optimization

This tool is intended to be deployed for potential customers to compare the energy profiles across various drone types/classes. The primary factors considered were design of the drone, the weight of the drone, the weight of the payload, and how the drone is flown. It has energy comparison metrics like "Drone (A) vs Drone (B) ", "Drone vs Ground Vehicle", "Drone Energy from delivery via landing versus hovering". It also includes the ability to determine the number of drones and batteries needed to optimally deliver goods from a chosen location to a set of destinations.

Mendadhala, Rohit [Idaho National Laboratory (INL)↗

Fleet Size Requirements for Each GSE Type at Each Airport

This dataset contains the required number of vehicles for each GSE type at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse-vehicles-chargers.png) Number of GSE vehicles per GSE type and chargers required for different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Grid Reliability and U.S. Coal Fleet Attributes: Considerations for State Regulators

This briefing paper provides state utility regulators with a comprehensive and current understanding of the reliability attributes of coal as a generation resource, potential reliability impacts associated with near-term coal plant retirements, and possible mitigation strategies to ensure a stable and resilient energy system.

01 COAL, LIGNITE, AND PEAT↗

Drone Fleet Summary: NNLEMS UxS Rolodex entry for Sandia

Sandia’s UAS Aviation Operations Unit (UAOU) was established in 2019 to be the single entity at Sandia conducting UAS Ops in support the labs Uncrewed Aircraft Systems (UAS) activities. The UAOU currently consists of >330 FAA Registered UAS with a large variety of primarily Class 1&2 UAS: fixed wing (>90), multi-rotor (>230), hybrids, VTOLs, jets, and balloons. Many of these are threat vehicles presented as targets to Counter-UAS (CUAS) systems as part of performance tests, with the remainder in support of other projects across Sandia often with custom payload needs. The UAOU has ~15 primary pilots and reach back to another ~45 FAA Certified Remote Pilots across Sandia. The team conducts flight and CUAS operations at many test locations, including OCONUS. Sandia was awarded the 2024 DOE Federal Aviation Safety Program Award.

42 ENGINEERING↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Digital Transformation for the Existing Fleet: Where to Start?

To remain economically viable in today’s electricity marketplace, nuclear power plants are replacing old analog equipment with modern digital tools. Having information available in an electronic format allows most work processes to become more efficient by automating simple, time-consuming tasks. However, with thousands of routine work processes performed every day, it can be difficult for the plants to know where to begin. We partnered with a nuclear utility to develop a novel assessment tool that measures seven health indicators for each work process performed, providing a rapid digital status report of the plant. The assessment tool is inexpensive and user-friendly, administered remotely, and automatically customized to each employee. Data from 167 employees representing different perspectives were analyzed to identify optimal candidates for digital initiatives that yield the highest payback for increased process efficiencies. We ranked by a priority index to ensure that processes with a good combination of time savings and digital opportunity were at the top. The focus was on determining a maximum investment to ensure that the cost savings from these initiatives are positive over a specified period. We identified potential cost savings of $2.6m, $1.3m and $1.2m for our top priority processes. By using our novel assessment tool to determine the digital status of the plant’s work processes, they were provided with a starting point for target candidates that would most benefit from a digital initiative. Our analysis helps stakeholders understand the financial impact of digital initiatives and identify maximum investment amounts when seeking technical solutions.

assessment↗