DOE OSTI2025
The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.
01 COAL, LIGNITE, AND PEAT↗