Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “femp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Sandia’s Liquid-Cooled Data Center Boosts Efficiency and Resiliency

The Federal Energy Management Program (FEMP) encourages federal agencies and organizations to improve data center energy efficiency, which can offer tremendous opportunities for energy and cost savings. In this success story, a novel liquid cooling system provides reliable, resilient, and energy-efficient cooling for high performance computing (HPC) systems at Sandia National Laboratories.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Supporting Electric Vehicle Supply Equipment Deployment

FEMP assists federal agencies with the transition to zero-emission vehicles (ZEVs) by offering technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams. This fact sheet introduces the EVSE Tiger Team site assessment and technical assistance process.

ADVANCED PROPULSION SYSTEMS↗

Best Practices for Enhancing Performance Contracts with Monitoring-Based Commissioning

Fact sheet highlights best practices for incorporating monitoring-based commissioning (MBCx), a type of energy management information system (EMIS), in performance contracts. It draws from the Federal Energy Management Program (FEMP) report, Enhancing Performance Contracts Using Monitoring-based Commissioning. MBCx is commercially available, yet is underutilized in performance contracts. MBCx can result in significant benefits for both a federal facility and the performance contractor.

EMIS↗

Energy Management Information Systems Cybersecurity Best Practices

Energy management information systems (EMIS) are a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance. Critical systems are often integrated with or operate on the same networks as EMIS scope systems, necessitating stable, continuous, and secure communication. When connecting EMIS to building automation and utility control systems, there are also many physical assets that could cause harm to the building and its occupants if a malicious act or human error were introduced. It is imperative to ensure all EMIS scope systems are connected securely to the EMIS and do not open vulnerable pathways to other facility networks and operations. The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of EMIS at federal facilities. This best practice document is part of a series of fact sheets created to help accelerate the market adoption and use of EMIS in the federal sector. It provides an overview of required EMIS cybersecurity standards for compliance and authority to operate along with additional recommendations.

cybersecurity↗

Energy Management Information Systems Cybersecurity Best Practices

Energy management information systems (EMIS) are a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance. Critical systems are often integrated with or operate on the same networks as EMIS scope systems, necessitating stable, continuous, and secure communication. When connecting EMIS to building automation and utility control systems, there are also many physical assets that could cause harm to the building and its occupants if a malicious act or human error were introduced. It is imperative to ensure all EMIS scope systems are connected securely to the EMIS and do not open vulnerable pathways to other facility networks and operations. The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of EMIS at federal facilities. This best practice document is part of a series of fact sheets created to help accelerate the market adoption and use of EMIS in the federal sector. It provides an overview of required EMIS cybersecurity standards for compliance and authority to operate along with additional recommendations.

Cybersecurity↗

Advancing Federal Infrastructure Through Innovation: Customer Damage Function Calculator

Provides an overview of the National Renewable Energy Laboratory (NREL) Customer Damage Function (CDF) Calculator web tool, developed with funding and support from the Federal Energy Management Program (FEMP). The CDF Calculator is a screening tool that provides justification to site and/or headquarters leadership for resilience investments. It generates monetary values to justify investments in resilience solutions to prevent or lessen the impact of a grid outage at a facility.

CDF calculator↗

Advancing Federal Infrastructure Through Innovation: Connecting to Utilities with EV U-Finder

Executive Order 14057 requires federal agencies to achieve 100 percent zero-emission vehicle (ZEV) acquisitions by 2035. In order to do so, agencies will need to work closely with their local utilities to successfully manage the electric vehicle supply equipment development to support the ZEV fleet. NREL, with the support of DOE FEMP, has developed the Electric Vehicle Utility Finder (EV U-Finder) tool to help local fleet managers find utility contacts and incentives.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Understand the Costs of an Energy or Water Outage with the Customer Damage Function Calculator

The Customer Damage Function (CDF) Calculator is a free, publicly available web tool that helps users estimate the costs incurred at their site due to an electric grid or water service outage. Developed by the National Renewable Energy Laboratory (NREL) with support from the Federal Energy Management Program (FEMP), the tool is designed to help federal facility owners, building energy managers, and resilience planners understand and quantify the value of resilience to justify investments that would prevent or lessen the impact of a disruption.

CDF Calculator↗

Incorporating climate change into risk-informed resilience planning

In response to the development of portfolio-wide Climate Action Plans by federal agencies, federal sites are working to incorporate the impacts of climate change into their resilience assessments. However, it can be challenging to incorporate climate change scenarios into resilience assessments given the uncertainty inherent in climate change modeling. Incorporating these factors into a resilience plan requires an understanding of what the different climate scenarios mean, as well as how to estimate potential impacts of climate change on hazard occurrence on a regional, or even local, scale under different scenarios. We discuss approaches to incorporating this data into risk-informed resilience assessment processes, such as those implemented in the Department of Energy’s (DOE) Federal Energy Management Program’s (FEMP) Technical Resilience Navigator (TRN) and the Sustainability Performance Division’s (SPD) Vulnerability Assessment and Resilience Plan (VARP) Risk Assessment Tool. We also describe the climate scenarios and the availability of hazard data for site resilience planning, based on modeling included in the International Panel on Climate Change (IPCC), the National Climate Assessment (NCA), and state-level reports. We present examples from the TRN risk assessment and the VARP Risk Assessment Tool to illustrate how sensitivity analysis can be used to incorporate climate change projections into the resilience planning process.

Rabinowitz, Hannah S.↗

Laboratory Efficiency Strategies and the Smart Labs Program

Focusing on critical spaces, such as labs, will enable agencies to prioritize federal energy efficiency and decarbonization goals. FEMP's Smart Labs program is an example of emerging efficient laboratory building strategies. The benefits of this program include improved safety and health, reduced energy consumption and carbon emissions, lower operating costs, reduced degradation, and increased retention and recruitment of top talent researchers and sciences. In this session, with the help of our national lab partners, Sandia National Laboratory and Lawrence Berkeley National Laboratory, you will learn about the steps to implement a Smart Labs program of your own and the methods behind the high-performance laboratory building. The partners will share best practices in implementation, practical advice for building a team, and how to address these critical facilities.

decarbonization↗

Workshop: Advanced Metering for Decarbonization: Electric Vehicles and 24/7 Carbon-Free Electricity

The purpose of this workshop is to learn more about advanced metering best practices for meeting the goals of EO 14057. This will be a 2-part session, first part to include presentations on the FEMP best practice work related to metering: 1) Electric Vehicles (EVs) and EV charging station electricity use. 2) Integrating data sources to calculate hourly carbon pollution-free electricity (CFE). Second part will facilitate small group discussions with a problem-solving activity.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Grid-Interactive Efficient Buildings Support Federal Facility Decarbonization

The Federal Energy Management Program (FEMP) plays a key role in helping agencies understand and meet energy-related goals, including those surrounding smart buildings technologies and grid-interactive efficient buildings (GEBs), which can support decarbonization. GEB enables demand flexibility that has the potential to reduce electrical infrastructure costs and transform the grid edge, where buildings connect to the power grid.

decarbonization↗

Best Practices for Resilience in Smart Grid-Interactive Efficient Buildings

The Federal Energy Management Program (FEMP) supports federal agencies' energy decisions with information and guidance on design, funding, and operations to ensure federal buildings are efficient and resilient. The modernization of building infrastructure and the evolution of buildings to support decarbonization involves complex implementation of multiple components across several systems. This includes energy-efficient equipment, on-site energy generation and storage systems, and control systems. These systems have operational modes that can operate more efficiently if they are able to behave responsively to the conditions of the electrical grid. These grid-interactive efficient buildings (GEB) allow facilities to manage power demand according to operational constraints and market signals issued by grid operators. With proper design and planning, these same capabilities have the potential to enable building and facility resilience - coordinating with microgrids, maintaining power on critical circuits to sustain essential operations, and monitoring building health and safety status during an outage. By managing the load of buildings, GEBs can also reduce the cost of backup generation and make better use of renewable power sources on site. This document outlines some of the processes and considerations to guide the design and operation of GEBs in ways that promote facility resilience.

building decarbonization↗

Energy Efficiency Requirements for Acquisition Professionals

Federal agencies are required to purchase products as certified by EPA or designated by DOE’s Federal Energy Management Program (FEMP). The two programs cover different products, sizes and applications. These requirements also have an associated FAR clause, FAR 52.223-15. They apply to both energy-consuming products and services that use energy-consuming products.

Ackerman, Allison↗

Determining Price Reasonableness in Energy Performance Contracts

Report provides recommendations and best practices concerning fair and reasonable price determination in federal energy performance contracts (EPCs), which include energy savings performance contracts (ESPCs) and utility energy service contracts (UESCs). It reflects the experiences, lessons learned, and best practices of agencies implementing EPCs, and is consistent with FEMP’s training on this subject. This is an update to the 2015 revision.

Dominy, Russ [Boston Government Services (BGS)]↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗