A Technical-Economic Assessment of Brackish Water Treatment for Fossil Power Plant Cooling with Reduced Environmental Impact
The power sector accounts for approximately 40% of freshwater use in the U.S. Reusing non-traditional water resources is critical for alleviating water stress in the western United States. The purpose of this study is to conduct a techno-economic system analysis to evaluate the potential of brackish water treatment for wet cooling towers at existing thermo-electric generating units (EGUs). It aims to address current knowledge gaps in support of non-traditional water resources planning and the electric power industry's water decision- and policy making. An engineering-economic model was developed and combined with DuPont's water application value engine (WAVE) v1.82 to evaluate the viability of retrofitting reverse osmosis-based brackish water treatment systems to individual existing EGUs and then aggregating the unit-level results to the fleet level. In the base case, brackish water treatment can reduce freshwater consumption of electric generation units by 94–100% while increasing the cost of electric generation by approximately 10% and have marginal impacts on the units' parasitic loads. When zero liquid discharge systems are applied to brackish water brine treatment, the cost of electric generation and freshwater consumption savings and energy penalty to the power plant significantly increase. These costs are even higher than dry cooling deployment in lieu of wet cooling towers. The choice of freshwater savings between brackish water desalination and dry cooling deployment depends greatly on how the concentrated brines are managed. Multiple factors must be considered when supporting decision-making in water management and planning in power sectors, which include non-traditional water quantity and quality as well as trade-offs among technical performance, economics, and environmental impacts.