At least 73 records · Page 4

Airbreathing engines for space shuttle

The requirements imposed on the airbreathing engines by the shuttle mission and some results from engine design studies are discussed. In particular, some of the engine system weight study results are presented, potential problem areas and required engine modifications are identified, and testing requirements for a development and qualification program are discussed. The engines of interest for the shuttle are engines that are currently being developed for other applicatons. The potential problems, engine modifications, and testing requirements result primarily from the new environments associated with launch, space residence, and reentry.

Glassman, A. J.↗

Airbreathing engines for Space Shuttle.

The requirements imposed on the airbreathing engines by the shuttle mission and some results from engine design studies are discussed. In particular some of the engine system weight study results are presented, potential problem areas and required engine modifications are identified, and testing requirements for a development and qualification program are discussed. The engines of interest for the shuttle are engines that are currently being developed for other applications. The potential problems, engine modifications, and testing requirements result primarily from the new environments associated with launch, space residence, and reentry.

Glassman, A. J.↗

Airbreathing engines for space shuttle.

The requirements imposed on the airbreathing engines by the shuttle mission and some results from engine design studies are discussed. In particular, some of the engine system weight study results are presented, potential problem areas and required engine modifications are identified, and testing requirements for a development and qualification program are discussed. The engines of interest for the shuttle are engines that are currently being developed for other applications. The potential problems, engine modifications, and testing requirements result primarily from the new environments associated with launch, space residence, and reentry.

Glassman, A. J.↗

Lessons learned from selecting and testing spaceflight potentiometers

A solar array drive (SAD) was designed for operation on the TOPEX/POSEIDON spacecraft that was launched in August, 1992. The experience gained in selecting, specifying, testing to failure, and redesigning its position sensor produced valuable lessons for future component selection and qualification. Issues of spaceflight heritage, cost/benefit/risk assessment, and component specification are addressed. It was found that costly schedule and budget overruns may have been avoided if the capability of the candidate sensors to meet requirements had been more critically examined prior to freezing the design. The use of engineering models and early qualification tests is also recommended.

Iskenderian, T.↗

Green Propellant Test Capabilities of the Altitude Combustion Stand at the NASA Glenn Research Center

The NASA Glenn Research Center (GRC) is committed to providing simulated altitude rocket test capabilities to NASA programs, other government agencies, private industry partners, and academic partners. A primary facility to support those needs is the Altitude Combustion Stand (ACS). ACS provides the capability to test combustion components at a simulated altitude up to 100,000 ft. (approx.0.2 psia/10 Torr) through a nitrogen-driven ejector system. The facility is equipped with an axial thrust stand, gaseous and cryogenic liquid propellant feed systems, data acquisition system with up to 1000 Hz recording, and automated facility control system. Propellant capabilities include gaseous and liquid hydrogen, gaseous and liquid oxygen, and liquid methane. A water-cooled diffuser, exhaust spray cooling chamber, and multi-stage ejector systems can enable run times up to 180 seconds to 16 minutes. The system can accommodate engines up to 2000-lbf thrust, liquid propellant supply pressures up to 1800 psia, and test at the component level. Engines can also be fired at sea level if needed. The NASA GRC is in the process of modifying ACS capabilities to enable the testing of green propellant (GP) thrusters and components. Green propellants are actively being explored throughout government and industry as a non-toxic replacement to hydrazine monopropellants for applications such as reaction control systems or small spacecraft main propulsion systems. These propellants offer increased performance and cost savings over hydrazine. The modification of ACS is intended to enable testing of a wide range of green propellant engines for research and qualification-like testing applications. Once complete, ACS will have the capability to test green propellant engines up to 880 N in thrust, thermally condition the green propellants, provide test durations up to 60 minutes depending on thrust class, provide high speed control and data acquisition, as well as provide advanced imaging and diagnostics such as infrared (IR) imaging.

Testing↗

Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 1: Executive summary

The LAWS phase 1 and phase 2 studies have been completed on schedule and have led to significant advances in CO2 laser development. The Phase 2 Design Definition Study has shown that a large scanning mirror/high pulse energy laser LAWS Instrument is feasible and within the existing technology. The capability to monitor wind velocities with backscatter ratios of 10(exp 11) m(exp -1) SR(exp -1) is feasible. The weight budget allocated for the baseline LAWS is adequate, and sufficient reserves exist with the potential downsized configuration. With the possible decrease in available power from the baseline of 2.2 kW guideline, power and shot management is critical for the baseline configuration (15 to 20 J). This is particularly true during the 100 day occultation period each year. With the downsized configurations (5 to 7 J), power management is still necessary during the occultation but is primarily limited to shot management over the polar regions. The breadboard effort has produced significant laser advances for a tight 18 month schedule and the minimum budgets available from NASA, Lockheed, and TDS. Using the NASA funds and Lockheed and TDS fixed assets budgets, the breadboard was designed, fabricated, and brought on-line with first laser light within 16 months after ATP. First laser beam was obtained on 21 April 1992 at a 5 J power level. Tests since then have been conducted at sustained, repetitive pulse levels of over 7 J and 20 Hz. This is an increase of over two or three times greater than any system previously developed from this type laser. Increased power levels and additional life tests will be accomplished in the next LAWS phase. The Lockheed LAWS design will operate in the gravity gradient mode on-orbit, and all possible instrument vibration and jitter modes have been considered. Adequate pointing stability and control is state-of-the-art technology for the critical time periods, frequency rates, and control responses required by LAWS. Lockheed recommends a 6-1/2 year phase C/D program for LAWS to provide adequate feedback from the engineering unit and the qualification unit to the final flight unit. Assuming a one year period for LAWS integration to the spacecraft, followed by a six-month period for launch vehicle integration, LAWS could be successfully developed and launched in eight years. Our baseline design or downsized design can be accommodated by either the Atlas 2AS or the Delta launch vehicles. Lockheed's recommendation is that, based on the successful phase 2 design study and breadboard program, a follow-on 18 month extended breadboard testing program and additional system engineering studies, primarily in interfacing with a to be defined platform, be initiated. This should be immediately followed by the phase C/D program, leading to a LAWS launch in late 2001 or early 2002.

Source record↗

Qualification and Performance of a High-Efficiency Laser Transmitter for Deep-Space Optical Communications

A high-power Laser Transmitter Assembly (LTA) was developed to support the Deep Space Optical Communications (DSOC) technology demonstration being developed by the Jet Propulsion Laboratory. NASA’s Psyche Mission plans to host the DSOC flight subsystem for testing space-to-ground high-bandwidth laser communications en route to the 16 Psyche asteroid. We review the design, performance, and qualification of the LTA Engineering Model and Flight Model (EM and FM) delivered to JPL. The LTA uses a master-oscillator power amplifier (MOPA) design and delivers up to 4.5 W at 1550 nm, with a highly efficient, cladding-pumped, polarization-maintaining erbium-ytterbium fiber amplifier. The master oscillator generates a range of pulse widths and repetition rates to support modulation formats from 16- to 128-PPM for optical data transmission at >100 Mbps. The LTA was designed for high reliability and radiation hardness, and includes redundant signal and pumping paths to reduce single points of failure, hardware interlocks to ensure safe operation and protection against damage, closed-loop control of optical power, and detailed health and status via telemetry. The LTA EM and FM were subjected to unit-appropriate space qualification testing. We describe the performance testing of the EM and FM, for the characterization of key metrics such as wavelength stability, signal linewidth, optical pulse width, jitter, and extinction ratio, and polarization extinction ratio. The management of optical nonlinearities (self-phase modulation, Brillouin scattering, or pulse-to-pulse energy variation), which could result in an optical link penalty or damage to the LTA, is also detailed, and factors affecting the power efficiency are discussed.

Jaques, J.↗

Laser Docking System

The Laser Docking System (LDS) consists of passive docking aids (reflectors) placed on the target vehicle in a known location and orientation. These reflectors are acquired and tracked by means of a modulated laser beam located on the interceptor vehicle. The LDS enables the interceptor vehicle to analyze the return (reflected) signal in order to determine both relative position and relative attitude of the target vehicle during stationkeeping and docking. Laser ranging experiments have been accomplished at NASA, and from these experiments have evolved laser docking concepts. The concepts include angle and attitude measurement which are capable of providing all of the information needed for automatic docking control by the interceptor vehicle. Several designs are being compared. Plans include the development and testing of: first a breadboard model, then an engineering model, and finally qualification and flight systems.

Erwin, H. O.↗

Anatomy of a bearing torque problem

In the early 1970s, an antenna despin drive was developed for MBB solar science satellite HELIOS. A problem with high bearing drag torque that was encountered on the two flight models of this drive, after successful tests were completed on twelve bearings, an engineering model, and the qualification unit is discussed.

Phinney, Damon D.↗

On the development of the power sources for the Ulysses and Galileo missions

The technically challenging European Space Agency Ulysses mission to explore the polar regions of the Sun and the NASA Galileo mission to explore Jupiter have prompted the development of the most powerful radioisotope thermoelectric generator (RTG) yet built for space use. This RTG, which was designed to provide a minimum of 285 We at beginning of mission builds upon the successful thermoelectric technology developed for the RTGs now in operation on the Voyager 1 and 2 spacecraft. A total of four flight RTGs, one ground qualification RTG, and one Engineering Unit have been built and tested for the Galileo and Ulysses missions. The tests have included measurements of functional performance, vibration response, magnetic signature, mass properties, nuclear radiation, and vacuum performance. The RTGs are fully flight qualified for both missions and are ready for launch.

Gary L. Bennett↗

Qualification of the RSRM case membrane case-to-insulation bondline inspection using the Thiokol Corporation ultrasonic RSRM bondline inspection system

Qualification testing of Combustion Engineering's AMDATA Intraspect/98 Data Acquisition and Imaging System that applies to the redesigned solid rocket motor (RSRM) case membrane case-to-insulation bondline inspection was performed. Testing was performed at M-67, the Thiokol Corp. RSRM Assembly Facility. The purpose of the inspection was to verify the integrity of the case membrane case-to-insulation bondline. The case membrane scanner was calibrated on the redesigned solid rocket motor case segment calibration standard, which had an intentional 1.0 by 1.0 in. case-to-insulation unbond. The case membrane scanner was then used to scan a 20 by 20 in. membrane area of the case segment. Calibration of the scanner was then rechecked on the calibration standard to ensure that the calibration settings did not change during the case membrane scan. This procedure was successfully performed five times to qualify the unbond detection capability of the case membrane scanner.

Cook, M.↗

Qualification of the RSRM field joint CF case-to-insulation bondline inspection using the Thiokol Corporation ultrasonic RSRM bondline inspection system

Qualification testing of Combustion Engineering's AMDATA Intraspect/98 Data Acquisition and Imaging System that applies to the redesigned solid rocket motor field joint capture feature case-to-insulation bondline inspection was performed. Testing was performed at M-111, the Thiokol Corp. Inert Parts Preparation Building. The purpose of the inspection was to verify the integrity of the capture feature area case-to-insulation bondline. The capture feature scanner was calibrated over an intentional 1.0 to 1.0 in. case-to-insulation unbond. The capture feature scanner was then used to scan 60 deg of a capture feature field joint. Calibration of the capture feature scanner was then rechecked over the intentional unbond to ensure that the calibration settings did not change during the case scan. This procedure was successfully performed five times to qualify the unbond detection capability of the capture feature scanner. The capture feature scanner qualified in this test contains many points of mechanical instability that can affect the overall ultrasonic signal response. A new generation scanner, designated the sigma scanner, should be implemented to replace the current configuration scanner. The sigma scanner eliminates the unstable connection points of the current scanner and has additional inspection capabilities.

Cook, M.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

Heffer, R.↗

NASA Space Mechanisms Handbook and Reference Guide Expanded Into CD-ROM Set

Several NASA missions suffered failures and anomalies due to problems in applying space mechanisms technology to specific projects. Research shows that engineers often lack either adequate knowledge of mechanism design or sufficient understanding of how mechanisms affect sensitive systems. The Space Mechanisms Project conducted a Lessons Learned study and published a Space Mechanisms Handbook to help space industry engineers avoid recurring design, qualification, and application problems. The Space Mechanisms Handbook written at the NASA Glenn Research Center details the state-of-the-art in space mechanisms design as of 1998. NASA's objective in developing this Space Mechanisms Handbook was to provide readily accessible information on such areas as space mechanisms design, mechanical component availability and use, testing and qualification of mechanical systems, and a listing of worldwide space mechanisms experts and testing facilities in the United States. This handbook has been expanded into a two-volume CD-ROM set in an Adobe Acrobat format. In addition to the handbook, the CD's include (1) the two volume Space Mechanisms Lessons Learned Study, (2) proceedings from all the NASA hosted Aerospace Mechanisms Symposia held through the year 2000, (3) the Space Materials Handbook, (4) the Lubrication Handbook for the Space Industry, (5) the Structural & Mechanical Systems Long-Life Assurance Design Guidelines, (6) the Space Environments and Effects Source-Book, (7) the Spacecraft Deployable Appendages manual, (8) the Fastener Design Manual, (9) A Manual for Pyrotechnic Design, Development and Qualification, (10) the Report on Alternative Devices to Pyrotechnics on Spacecraft, and (11) Gearing (a manual). In addition, numerous other papers on tribology and lubrication are included.This technical summary of the project provides information on how to obtain the handbook and related information.

Fusaro, Robert L.↗

Overview of the Orion Vibroacoustic Test Capability at NASA Glenn Research Center

In order to support the environmental test needs for our new Orion and Constellation program, NASA is developing unique world-class test facilities. To optimize this testing of spaceflight hardware while minimizing transportation issues, a one-stop, under one roof test capability is being developed at the Space Power Facility at the NASA Glenn Research Center's Plum Brook Station. This facility will provide the capability to perform the following environmental testing: (1) reverberation acoustic testing, (2) mechanical base-shake sine testing, (3) modal testing, (4) thermal-vacuum testing, and (5) EMI/EMC (electromagnetic interference and compatibility) testing. An overview of this test capability will be provided in this presentation, with special focus on the two new vibroacoustic test facilities currently being designed and built, the Reverberant Acoustic Test Facility (RATF) and the Mechanical Vibration Facility (MVF). Testing of the engineering developmental hardware and qualification hardware of the Orion (Crew Exploration Vehicle) will commence shortly after the facilities are commissioned.

Hughes, William O.↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew access to the International Space Station (ISS) and, together with the Ares V Cargo Launch Vehicle (CaLV), serves as one component of a future launch capability for human exploration of the Moon. During the system requirements definition process and early design cycles, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements: the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine, will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle dynamic test (IVDT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, and a highaltitude actuation of the launch abort system (LAS) following separation. The Orion-1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Cockrell, Charles E., Jr.↗

Integrated Testing Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I crew launch vehicle is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew and cargo access to the International Space Station (ISS) and, together with the Ares V cargo launch vehicle, serves as a critical component of NASA's future human exploration of the Moon. During the preliminary design phase, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements - including the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine - will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the upper stage Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle ground vibration test (IVGVT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, validate the ability of the upper stage to manage cryogenic propellants to achieve upper stage engine start conditions, and a high-altitude demonstration of the launch abort system (LAS) following stage separation. The Orion 1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Taylor, James L.↗