Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “drilling data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Multi-Sourced Collaboration for the Production and Refining of Rare Elements and Critical Metals (Final Technical Report)

The project objective was to develop a feasible and cost-effective method for recovering rare earth elements (REEs) and critical materials (CMs) from coal and coal byproducts, resulting in high-purity individually separated REEs and CMs. The targeted REEs included Y, Pr, Nd, Gd, Dy, and Sm, with a purity of over 99.5%, while the CMs included Co, Mn, Ga, Sr, Li, Ni, Zn, and Ge, with a purity of over 90%. The project aimed to design a prototype facility capable of producing 1-3 tonnes/day of high-purity REO mixes. The work was divided into four designated circuits: 1) REE extraction and concentration, 2) REE separation and purification, 3) RE metal production, and 4) CM production. To achieve these goals, the project involved 11 tasks, including technology reviews, research, process flow diagram development, mass balance estimation, and preliminary technical-economic analysis. The project team included researchers from the University of Kentucky, University of Alabama and Virginia Tech as well as process specialists from Argonne National Laboratory. MP Materials provided technical support regarding rare earth markets and processing while Alliance Coal performed resource assessment. The project included a market analysis for Nd/Pr, Tb, Dy, Gd, Y, Co, Mn, Li, Sr, Ga, Ni, Zn, and Ge. These analyses provided insights into the supply and demand trends as well as historic and future projections of market price relative to purity requirements for these elements. Two coal resources were selected for the project: the West Kentucky No. 13 (Baker) Seam and an undisclosed lignite resource in the Illinois coal basin. The estimated quantities of REEs in these resources were calculated based on production samples and drilling data. It was estimated that there is adequate supply for an operation producing one metric ton daily of higher purity mixed rare earth oxides (MREO) for approximately 20 years at a site located in western Kentucky. In Circuit 1, project data was obtained from a pilot heap leach and REE concentration facility. It was concluded that the existing circuit, which generated a MREO concentrate, two types of CM mixed products, and Li- and Sr-containing waters, would be suitable feed for circuits 2-4. Data from the first-of-its-kind coal coarse refuse heap leach pilot pad played a crucial role in estimating reliable elemental concentrations of the pregnant leaching solution (PLS). The average total REE concentration in the PLS was found to be 28.6 ppm. In Circuit 2, several concepts were explored including a novel process referred to as solvent-assisted chromatography (SAC). This concept involved a novel columnar reactor that incorporated multiple mixer/settlers, thereby enabling the operation of counter-flowing aqueous and organic phases. Unfortunately, due to project time constraints, a complete fundamental modeling analysis could not be completed to fully evaluate the technology. Molten salt electrowinning was considered as an alternative for circuit 3 following circuit 2 purification circuit utilizing the novel SAC process. A mass and energy balance of Nd reduction to metal in a fluoride containing molten salt electrolyte was conducted. Comparisons were made with the current state of Asian molten salt electrorefining, and potential improvements in siphoning rare earth metals (REM) from the reactor were presented. A cost estimate was performed for the production of 1 tonne per day, which yielded a total of $2.29 million for the nine electrowinning (EW) cells required. The selected option for circuits 2 and 3 was a plasma distillation process, which initially separates rare earth elements (REEs) from other elements. This is followed by selective electrowinning in various ionic liquids. The selection was made on the basis of thermodynamic modeling and experimental data previously published by a project partner. The combination offers an innovative approach to integrated refining and RE metal production. For Circuit 4, an extensive literature review was conducted for the processing of the CMs. The ultimate decision was to utilize a combined plasma and ionic liquid process as well to produce individual high-purity concentrates of Zn, Ni, Co, Mn, and Mg. A separate flowsheet for Li and Sr was recommended, which would yield carbonates of these elements. Due to the lack of suitable experimental data at this time, a process recommendation could not be provided but several methods have been proposed for consideration. Lastly, a techno-economic analysis (TEA) was conducted to assess the effectiveness of the proposed process for further investigation. The TEA results revealed a capital expense (CapEx) of $737 million and an annual operational expense (OpEx) of $220 million. Due to the selected elements, the hypothetical heap leach pad can produce 1 metric tonne per day of REO equivalent, but a conscious decision was made to only treat targeted REEs, resulting in the production of 0.4 metric tonne of REM. An estimated annual revenue of $90.87 million was projected based on standard market pricing information provided by the funding agency. During the TEA, ten different modules were evaluated for costing purposes. The precipitation circuit was identified as the largest single operational expense, followed by the Mg/Mn process due to the amount of treated metal. In terms of capital expenditures, the heap leach process incurred the highest cost, followed by the Mg/Mn process. The scalability of the plasma process is a crucial consideration since the reactors cannot be scaled beyond the largest demonstrated size due to their reliance on surface area of the slag and vapor phase. The purity estimate for the REEs are generally 98%±2% to produce a metal. The purity level being lower than the project objective was due to the lack of specific experimental data needed to tighten the tolerance of the estimates. Based on literature and previous experience, the CMs are estimated as follows; Ga (95%+, metal), Sr (95%+, carbonate), Li (95%+, carbonate), Ni (98%±2%, metal), Zn (95%+, metal sponge), Ge (95%+, metal), Co (98%±2%, metal), and Mn (98%±2%, metal).

01 COAL, LIGNITE, AND PEAT↗

Utah FORGE: Well 16B(78)-32 Drill Core Fracture Analysis Images and Data

This dataset contains drilling core data from well 16B(78)-32, including PDF documents with flattened core images annotated by feature type and core interval, as well as spreadsheets detailing feature morphologies by depth, planar feature measurements, and planar feature orientations rotated to in situ conditions. Core was recovered from three intervals, one per stimulation stage, in the crystalline rocks affected by the stimulation of well 16A(78)-32. Seven core runs were conducted, yielding 135.8 feet of recovered core. Features in the core were categorized into planar fractures, semi-planar fractures, unbroken mineralized fractures, rough fractures, curviplanar fractures, concave-convex surfaces, and planar compositional features such as mylonite or dike-like structures. Planar features were measured while the core was positioned horizontally, with the core axis aligned to a downhole azimuth of 42 degrees. Planar core measurements from stimulations 2 and 3 that could be confidently correlated with FMI data were rotated to in situ orientations. This was done by rotating the planes along vertical and horizontal axes to match the azimuth and inclination data recorded in the directional survey of well 16B(78)-32, as well as applying an axial rotation to resemble the fracture orientations observed in the FMI log at corresponding depths. Coherent sets of planar fracture measurements were made by aligning the core within each 3-foot section of the dissected core barrel, and between adjacent 3-foot sections within a core run by matching rock fabrics, saw cuts and/or tool marks. Where coherent fracture measurements could not be made within a core run, data sets are denoted by a subscript (i.e. 2-Ta and 2-Tb both come from tangent core run number 2).

15 GEOTHERMAL ENERGY↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Geologic Map of the Neal Hot Springs Geothermal Area - GIS Data

Neal Hot Springs—ESRI Geodatabase (ArcGeology v1.3): - Contains all the geologic map data, including faults, contacts, folds, unit polygons, and attitudes of strata and faults. - List of stratigraphic units and stratigraphic correlation diagram. - Three cross‐sections. - Locations of production, injection, and exploration wells. - Locations of 40Ar/39Ar samples. - Location of XRF geochemical samples. - 3D model constructed with EarthVision using geologic map data, cross‐sections, drill‐hole data, and geophysics (model not in the ESRI geodatabase).

15 GEOTHERMAL ENERGY↗

Geologic Map and GIS Data for the Tuscarora Geothermal Area

Tuscarora—ESRI Geodatabase (ArcGeology v1.3): - Contains all the geologic map data, including faults, contacts, folds, unit polygons, and attitudes of strata and faults. - List of stratigraphic units and stratigraphic correlation diagram. - Detailed unit descriptions of stratigraphic units. - Five cross‐sections. - Locations of production, injection, and monitor wells. - 3D model constructed with EarthVision using geologic map data, cross‐sections, drill‐hole data, and geophysics (model not in the ESRI geodatabase).

15 GEOTHERMAL ENERGY↗

Use of Rig Parameter Data in Bit Constraint Models for Improved Drilling Performance at The Geysers

Surface parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. However, these measurements are of reduced value without a standard to aid in evaluation and decision making. A method is demonstrated whereby drill bit constraint models are used to interpret drilling response parameters. Drill rig parameter data for well GDC-36 at the Geysers Geothermal Field Power were acquired by Geysers Power Company and drilling contractor Kenai Drilling using Pason US DataHub and evaluated. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) along with other model constraints in computational algorithms. The method is used to evaluate overall bit performance, monitor bit integrity, and detect the presence of drillstring vibrations and other conditions contributing to bit failure; comparisons are made to observations of bit wear and damage. The method will be applied in real-time to improve decision-making on subsequent wells and has applicability to development of advanced analytics on future geothermal wells using real-time electronic drilling recorder (EDR) data for improved performance and reduced drilling costs.

15 GEOTHERMAL ENERGY↗

Soda Lake Well Lithology Data and Geologic Cross-Sections

Comprehensive catalogue of drill-hole data in spreadsheet, shapefile, and Geosoft database formats. Includes XYZ locations of well heads, year drilled, type of well, operator, total depths, well path data (deviations), lithology logs, and temperature data. Plus, 13 cross-sections in Adobe Illustrator format.

15 GEOTHERMAL ENERGY↗

A Model of the Chicxulub Impact Basin Based on Evaluation of Geophysical Data, Well Logs, and Drill Core Samples

Abundant evidence now shows that the buried Chicxulub structure in northern Yucatan, Mexico, is indeed the intensely sought-after source of the ejecta found world-wide at the Cretaceous-Tertiary (K/T) boundary. In addition to large-scale concentric patterns in gravity and magnetic data over the structure, recent analyses of drill-core samples reveal a lithological assemblage similar to that observed at other terrestrial craters. This assemblage comprises suevite breccias, ejecta deposit breccias (Bunte Breccia equivalents), fine-grained impact melt rocks, and melt-matrix breccias. All these impact-produced lithologies contain diagnostic evidence of shock metamorphism, including planar deformation features in quartz, feldspar, and zircons; diaplectic glasses of quartz and feldspar; and fused mineral melts and whole-rock melts. In addition, elevated concentrations of Ir, Re, and Os, in meteoritic relative proportions, have been detected in some melt-rock samples from the center of the structure. Isotopic analyses, magnetization of melt-rock samples, and local stratigraphic constraints identify this crater as the source of K/T boundary deposits.

Sharpton, Virgil L.↗

Geologic Map and Cross Sections of the McGinness Hills Geothermal Area - GIS Data

Geologic map data in shapefile format that includes faults, unit contacts, unit polygons, attitudes of strata and faults, and surficial geothermal features. 5 cross-sections in Adobe Illustrator format. Comprehensive catalogue of drill-hole data in spreadsheet, shapefile, and Geosoft database formats. Includes XYZ locations of well heads, year drilled, type of well, operator, total depths, well path data (deviations), lithology logs, and temperature data. 3D model constructed with EarthVision using geologic map data, cross-sections, drill-hole data, and geophysics.

15 GEOTHERMAL ENERGY↗

Mineralogy of Drill Cuttings Beowawe, Dixie Valley and Roosevelt Hot Springs

Mineralogical, lithological, and geospatial data of drill cuttings from exploration production wells in Beowawe, Dixie Valley and Roosvelt Hot Springs. These data support whole rock analyses for major, minor and critical elements to assess critical metals in produced fluids from Nevada and Utah geothermal fields. The samples were analyzed by x-ray diffraction (legacy data) and then checked by thin section analysis.

15 GEOTHERMAL ENERGY↗

Utah FORGE Well 78B-32 Daily Drilling Reports and Logs

This data set includes the daily drilling reports and Pason data for well 78B-32 and Schlumberger logs acquired after drilling completion. This well was drilled between June 27th and July 31st of 2021. Also included is raw and processed data for a variety of well data metrics including temperature, porosity, density, and sonic data. This data was taken at the Utah FORGE site as part of the Utah FORGE project.

15 GEOTHERMAL ENERGY↗

Percussive Force Magnitude in Permafrost

An in-depth look at percussive drilling shows that the transmission efficiency is very important; however, data for percussive drilling in hard rock or permafrost is rarely available or the existing data are very old. Transmission efficiency can be used as a measurement of the transmission of the energy in the piston to the drill steel or bit and from the bit to the rock. Having a plane and centralized impact of the piston on the drill steel can optimize the transmission efficiency from the piston to the drill steel. A transmission efficiency of near 100% between piston and drill steel is possible. The transmission efficiency between bit and rock is dependent upon the interaction within the entire system. The main factors influencing this transmission efficiency are the contact area between cutting structure and surrounding rock (energy loss due to friction heat), damping characteristics of the surrounding rock (energy dampening), and cuttings transport. Some of these parameters are not controllable. To solve the existing void regarding available drilling data, an experiment for gathering energy data in permafrost for percussive drilling was designed. Fifteen artificial permafrost samples were prepared. The samples differed in the grain size distribution to observe a possible influence of the grain size distribution on the drilling performance. The samples were then manually penetrated (with a sledge-hammer) with two different spikes.

Eustes, A. W., III↗

Field Laboratory for Emerging Stacked Unconventional Plays in Central Appalachia

The goal of the Field Laboratory for Emerging Stacked Unconventional Plays (ESUP) in Central Appalachia project was to investigate and characterize the resource potential for multi-play production of emerging unconventional reservoirs in Central Appalachia. Project activities included drilling, logging and coring of a vertical characterization well drilled to basement to approximately 15,000 feet in depth. The data from drilling and well logs as well recovered core samples were used by the research team to support characterization of the geology and potential pay zones within the Nora Gas Field of southwestern Virginia and the greater Central Appalachian Basin. This project was led by Dr. Nino Ripepi of the Virginia Center for Coal and Energy Research (VCCER) in close collaboration with EnerVest Operating LLC (EnerVest). VCCER is housed in the Department of Mining and Minerals Engineering at Virginia Tech and was created by an Act of the Virginia General Assembly on March 30, 1977, as an interdisciplinary study, research, information, and resource facility for the Commonwealth of Virginia. EnerVest is a top tier, low-cost oil and natural gas company with a long history of traditional operating relationships with institutional investors as well as public and private companies. This report summarizes two major research activities: 1) Log and Core Analysis and 2) Numerical Modeling. Core analysis comprises the characterization efforts of the ESUP Field Laboratory and includes a discussion of the well logs run in the deep characterization wells, an initial analysis of those, the number, size and location of cores recovered, core testing and analysis done to date as well as plans for future analysis. Numerical modeling is comprised of seven major modeling efforts, including (1) Multiphysics shale transport modeling work, (2) the developed in-house compositional simulator studies, (3) reservoir modeling studies using GEM software, (4) fracture modeling work using EFRAC3D software and (5) numerical modeling efforts with ABAQUS software, (6) Numerical modeling efforts using FLAC3D and PFC3D, and (7) Automatic Machine Learning (AutoML) Studies.

02 PETROLEUM↗

Evaluation of Drilling Performance at The Geysers with Machine Learning Methods Using Geologic Data

A recent well, GDC-36, was drilled in The Geysers Geothermal Field served in a Department of Energy-industry to demonstrate improved drilling performance with polycrystalline diamond compact (PDC) bits. Both PDC and roller cone drill bits were used to drill this well. Key challenges encountered during drilling included lost circulation in the mud-drilled section, and bit damage interfacial severity in the deeper, air-drilled section. The objective of this study is to evaluate the drilling performance in relation to the local geological characteristics using machine learning methods. By applying K-clustering to the sonic log data, we were able to identify areas correlated with measured lost circulation. Also, the boundaries defined by clustering of the mineralogical and lithological data from the mud logs correlate well with interfacial severity during drilling. A random forest model was employed to build correlation between drilling data and rock strength. The confined compressive strength (CCS) of the rock in the training of the machine learning model was inferred from the dipole sonic log. The R-squared of the testing data is 0.78, and the RMSE (Root Mean Squared Error) is 0.06. The trained model was used to forecast rock strength for the section where sonic log data are not available. CCS could also be inferred from mud logs provided the relationship between mineralogy and rock strength is established through core testing data.

15 GEOTHERMAL ENERGY↗

Software Requirements for a Consequence Management Sample Data Simulator for Training and Drills

This document describes the requirements for a software tool that will enable FRMAC to simulate large sets of sample result data that is based realistically on simulated radionuclide deposition grids from NARAC. The user of this tool would be scientists involved in exercise and drill planning or part of the simulation cell of an exercise controller team. A key requirement is that this tool must be able to be run with a reasonable amount of training and job aids by any person within the Assessment, Laboratory Analysis, or Monitoring and Sampling divisions of the FRMAC to support any level of exercise from the small IPX to the national level full scale exercise. This tool should be relatively lean and stand-alone so that the user can run it in the field with limited IT resources. This document will describe the desired architecture, design characteristics, order of operations, and algorithms that can be given to a software development team to assist them in project scoping, costing, and eventually, development.

61 RADIATION PROTECTION AND DOSIMETRY↗